Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000255/LER-2017-00124 May 2017Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions
LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions
Enforcement Discretion
Tornado Generated Missile
Tornado Missile Protection
05000255/LER-2017-00217 July 2017Reactor Protection System Actuation While the Reactor was Shutdown
LER 17-002-00 for Palisades Regarding Reactor Protection System Actuation While the Reactor was Shutdown
Safe Shutdown
05000282/LER-2016-00225 March 2016Listed System Actuation - Motor-Driven Cooling Water Pump Auto-Start
LER 16-002-00 for Prairie Island, Unit 1, Regarding Listed System Actuation - Motor-Driven Cooling Water Pump Auto-Start
Ultimate heat sink
05000282/LER-2016-00421 June 20161 OF 4
LER 16-004-00 for Prairie Island, Unit 1, Regarding Missing Fire Barrier Between Fire Area (FA) 59 and 85 / Fire Hazard Analysis Drawings Do Not Match Boundary Description
Safe Shutdown
Unanalyzed Condition
Time of Discovery
Fire Barrier
Fire Watch
05000282/LER-2016-00615 February 2017121 Motor Driven Cooling Water Pump Auto Start
LER 16-006-00 for Prairie Island Nuclear Generating Plant, Units 1 and 2 Regarding 121 Motor Driven Cooling Water Pump Auto Start
05000306/LER-2015-00222 June 201621 Feedwater Pump Lockout, Unit 2 Reactor Trip Due to Pressure Switch Failure
LER 15-002-01 for Prairie Island, Unit, Regarding 21 Feedwater Pump Lockout, Reactor Trip Due to Pressure Switch Failure
05000306/LER-2016-00112 February 2016Unit 2 Reactor Trip due to a Ground Fault resulting in a Generator Trip
LER 16-001-00 for Prairie Island, Unit 2, Regarding Reactor Trip Due to a Ground Fault Resulting in a Generator Trip
05000306/LER-2017-00129 November 201723 Containment Fan Coil Unit Operability
LER 17-001-00 for Prairie Island, Unit 2, Regarding 23 Containment Fan Coil Unit Operability
Unanalyzed Condition
05000306/LER-2017-00211 December 2017Reactor Coolant System Shutdown Communication Live Vent Through Wall Defect
LER 17-002-00 for Prairie Island, Unit 2, Regarding Reactor Coolant System Shutdown Communication Live Vent Through Wall Defect
Boric Acid
Non-Destructive Examination
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
05000306/LER-2017-00311 January 2018Both Containment SEa) Pump Control Switches in Pull-out in Mode 4
LER 17-003-00 for Prairie Island Nuclear Generating Plant, Unit 2 Regarding Both Containment Spray Pump Control Switches in Pull-Out in Mode 4
CNRO-2008-00003, Entergy Fleet Correspondence Service List; River Bend Station, Grand Gulf Nuclear Station, Arkansas Nuclear One Units 1 and 2, Indian Point Generating Units 1, 2, and 3, Pilgrim Nuclear Power Station, Waterford 3 Steam Electric Stati6 February 2008Entergy Fleet Correspondence Service List; River Bend Station, Grand Gulf Nuclear Station, Arkansas Nuclear One Units 1 and 2, Indian Point Generating Units 1, 2, and 3, Pilgrim Nuclear Power Station, Waterford 3 Steam Electric Station, ...
CNRO-2008-00010, Entergy, Transmittal of Fleet Updated Correspondence Service List27 February 2008Entergy, Transmittal of Fleet Updated Correspondence Service List
CNRO-2008-00012, Entergy'S Submittal of Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))27 March 2008Entergy'S Submittal of Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2008-00030, Entergy Operations, Inc., Request for Approval to Use Privatel Telephone Security Devices to Transmit Safeguards Information to Authorized Personnel30 September 2008Entergy Operations, Inc., Request for Approval to Use Privatel Telephone Security Devices to Transmit Safeguards Information to Authorized Personnel
CNRO-2008-00035, Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 80520 November 2008Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805Enforcement Discretion
CNRO-2009-00004, Entergy Operations, Inc. - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))30 March 2009Entergy Operations, Inc. - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G13 April 2009Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G29 April 2010Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))31 March 2011Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2011-00004, Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G29 April 2011Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications13 December 2011Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff QualificationsSafe Shutdown
High Radiation Area
Process Control Program
Fire Protection Program
CNRO-2011-00007, 2011 Recertification of Foreign Ownership Control or Interest6 October 20112011 Recertification of Foreign Ownership Control or Interest
CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G30 April 2012Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications21 May 2012Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications
CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications20 November 2012Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff QualificationsHigh Radiation Area
Process Control Program
Fire Protection Program
CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))25 March 2013Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G26 April 2013Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-09626 February 2014Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096
CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G25 April 2014Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20143 April 2014Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014
CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 14 December 2015Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1Nondestructive Examination
Functionality Assessment
CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company18 February 2015Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company
CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))27 March 2015Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual30 April 2015Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program ManualSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D5 June 2015Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, DivisionLiquid penetrant
CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.20 August 2015Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.
CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)6 November 2015Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)
CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti29 January 2016Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl,Liquid penetrant
CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)25 February 2016Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)
CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))30 March 2016Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual19 July 2016Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual
CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))30 March 2017Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)31 March 2017Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Decommissioning Funding Plan
Exemption Request
CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 117 November 2017Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1Nondestructive Examination
Finite Element Analysis
Through-Wall Leak
CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table19 March 2018Submittal of Joint Plant Access Shared Information Table
CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)29 March 2018Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Incorporated by reference
Decommissioning Funding Plan
Exemption Request
CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J27 September 2018Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J
CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K28 December 2018Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K
CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 131 January 2019Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Dissimilar Metal Weld
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 431 January 2019Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4Safe Shutdown
Time of Discovery
Incorporated by reference
Missed surveillance
Offsite Circuit