Entergy'S Submittal of Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
ML080920128
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Big Rock Point, FitzPatrick  Entergy icon.png
Issue date: 03/27/2008
From: Ford B
Entergy Nuclear Operations, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2008-00012
Download: ML080920128 (12)


Text

Entergy Operations, Inc.

Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, Tel Mississippi 39213-8298 601-368-5758 B. S. Ford Senior Manager Nuclear Safety & Licensing CNRO-2008-00012 March 27, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nuclear Onsite Property Damage Insurance [10 CFR 50.54(w)(3)]

Arkansas Nuclear One, Units 1 and 2, Docket Nos. 50-313 & 50-368 Big Rock Point, Docket Nos. 50-155 Grand Gulf Nuclear Station, Docket Nos. 50-416 Indian Point Nuclear Generating Units 1, 2, and 3, Docket Nos.50-003, 50-247 & 50-286 James A. FitzPatrick Nuclear Power Plant, Docket Nos. 50-333 Palisades Nuclear Plant, Docket Nos. 50-255 Pilgrim Nuclear Power Station, Docket No. 50-293 River Bend Station, Docket Nos. 50-458 Vermont Yankee Nuclear Power Station, Docket Nos. 50-271 Waterford 3 Steam Electric Station, Docket No. 50-382

Dear Sir or Madam:

In accordance with 10 CFR 50.54(w)(3), the attached summary is the consolidated Entergy submittal to document the primary and excess property damage insurance coverage for the nuclear sites of Entergy Operations, Inc and Entergy Nuclear Operations, Inc. The insurance certificates that correspond to the policy numbers identified in the attachment are available in Entergy's Risk Management files following their effective date, April 1, 2008.

This submittal contains no commitments.

Should there be any questions concerning this joint submittal, please contact L. A. England of our corporate staff at 601-368-5766.

Sincerely, BSF/LAE Attachments

ýA C:) C)I

CNRO-2008-00012 Page 2 of 2 cc: (All Below w/o Certificates - See Risk Management Files For Certificates)

Mr. M. A. Balduzzi (WPO)

Mr. K. H. Bronson (PNPS)

Mr. T. A. Burke (ECH)

Mr. P. T. Dietrich (JAF)

Mr. J. R. Douet (GGNS)

Mr. J. S. Forbes (ECH)

Mr. J. T. Herron (ECH)

Mr. T. G. Mitchell (ANO)

Mr. J. E. Pollock (IPEC)

Mr. N. S. Reynolds (W&S)

Mr. C. J. Schwarz (PAL)

Mr. L. J. Smith (Wise, Carter)

Mr. T. A. Sullivan (VY)

Mr. J. E. Venable (RBS)

Mr. K. T. Walsh (W-3)

Mr. James L. Caldwell, NRC Regional Administrator, RIII Dr. Elmo E. Collins, NRC Regional Administrator, RIV Mr. Samuel J. Collins, NRC Regional Administrator, RI Mr. J. Boska, NRC Project Manager, IPEC Mr. J. Donohue, NRC Project Manager, GGNS/RBS Mr. J. Hall, NRC Project Manager, BRP Mr. N. Kalyanam, NRC Project Manager, W-3 Mr. J. Kim, NRC Project Manager, PNPS/VY Mr. A. Muniz, NRC PM, JAF Ms. F. Saba, NRC Project Manager, PLP Mr. A. Wang, NRC Project Manager, ANO Mr. Paul Eddy NYS Department of Public Service 3 Empire State Plaza Albany, NY 12223 Mr. Paul D. Tonko President NYSERDA 17 Columbia Circle Albany, NY 12203-6399 Mr. David O'Brian Commissioner VT Department of Public Service 112 State Street, Drawer 20 Montpelier, VT 15620-2601

Attachment to CNRO-2008-00012 Page 1 of 10 Entergy Operations, Inc./

Entergy Arkansas, Inc.

(formerly Arkansas Power & Light Company)

Arkansas Nuclear One Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary, Excess and Blanket Excess Property Insurance totals $1.6 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-045 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-002 Policy Limit: $750 Million Blanket Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: BX08-001 Policy Limit: $350 Million

Attachment to CNRO-2008-00012 Page 2 of 10 Entergy Operations, Inc./

System Energy Resources, Inc./

Entergy Mississippi, Inc.

(formerly Mississippi Power & Light Company)/

South Mississippi Electric Power Association Grand Gulf Nuclear Station Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary, Excess and Blanket Excess Property Insurance totals $1.6 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-026 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-047 Policy Limit: $750 Million Blanket Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: BX08-001 Policy Limit: $350 Million

Attachment to CNRO-2008-00012 Page 3 of 10 Entergy Operations, Inc./

Entergy Louisiana, LLC (formerly Louisiana Power & Light Company, and formerly Entergy Louisiana, Inc.)

Waterford 3 Nuclear Station Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary, Excess and Blanket Excess Property Insurance totals $1.6 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-036 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-053 Policy Limit: $750 Million Blanket Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: BX08-001 Policy Limit: $350 Million

Attachment to CNRO-2008-00012 Page 4 of 10 Entergy Operations, Inc./

Entergy Gulf States Louisiana, LLC (formerly Gulf States Utilities Company, and formerly Entergy Gulf States, Inc.)

River Bend Station Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary, Excess and Blanket Excess Property Insurance totals $1.6 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-066 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-066 Policy Limit: $750 Million Blanket Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: BX08-001 Policy Limit: $350 Million'

Attachment to CNRO-2008-00012 Page 5 of 10 Entergy Nuclear Operations, Inc./

Entergy Nuclear Generation Company Pilgrim Nuclear Station Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary and Excess Property Insurance totals $1.115 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-078 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-089 Policy Limit: $615 Million

Attachment to CNRO-2008-00012 Page 6 of 10 Entergy Nuclear Operations, Inc./

Entergy Nuclear Fitzpatrick, LLC FitzPatrick Nuclear Station Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary and Excess Property Insurance totals $1.115 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-092 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-092 Policy Limit: $615 Million

Attachment to CNRO-2008-00012 Page 7 of 10 Entergy Nuclear Operations, Inc./

Entergy Nuclear Indian Point 2, LLC Entergy Nuclear Indian Point 3, LLC Indian Point Station Units 1, 2 & 3 Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary and Excess Property Insurance totals $1.115 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number:. P08-093 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-093 Policy Limit: $615 Million

Attachment to CNRO-2008-00012 Page 8 of 10 Entergy Nuclear Operations, Inc./

Entergy Nuclear Vermont Yankee, LLC Vermont Yankee Nuclear Station Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary and Excess Property Insurance totals $1.115 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-096 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-096 Policy Limit: $615 Million

Attachment to CNRO-2008-00012 Page 9 of 10 Entergy Nuclear Operations, Inc./

Entergy Nuclear Palisades, LLC Palisades Nuclear Generating Plant Nuclear Property Insurance Effective April 1, 2008 The combined amount of Primary and Excess Property Insurance totals $1.115 Billion.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-110 Policy Limit: $500 Million Excess:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: X08-110 Policy Limit: $615 Million

Attachment to CNRO-2008-00012 Page 10 of 10 Entergy Nuclear Operations, Inc./

Entergy Nuclear Palisades, LLC Big Rock Point ISFSI Nuclear Property Insurance Effective April 1, 2008 Primary Property Insurance in the amount of $500 Million.

Primary:

Policy Period: 4/1/08-09 Insurer: Nuclear Electric Insurance Limited Policy Number: P08-109 Policy Limit: $500 Million