CNRO-2008-00003, Entergy Fleet Correspondence Service List; River Bend Station, Grand Gulf Nuclear Station, Arkansas Nuclear One Units 1 and 2, Indian Point Generating Units 1, 2, and 3, Pilgrim Nuclear Power Station, Waterford 3 Steam Electric Stati

From kanterella
Jump to navigation Jump to search
Entergy Fleet Correspondence Service List; River Bend Station, Grand Gulf Nuclear Station, Arkansas Nuclear One Units 1 and 2, Indian Point Generating Units 1, 2, and 3, Pilgrim Nuclear Power Station, Waterford 3 Steam Electric Station, ...
ML080510704
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Big Rock Point, FitzPatrick  Entergy icon.png
Issue date: 02/06/2008
From: Ford B
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2008-00003
Download: ML080510704 (9)


Text

Entergy Entergy Operations, Inc.

1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 Bryan S. Ford Senior Manager, Nuclear Safety &

Licensing CNRO-2008-00003 February 6, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Fleet Correspondence Service List River Bend Station Grand Gulf Nuclear Station Docket Nos. 50-458 & 72-49 Docket Nos. 50-416 & 72-50 Arkansas Nuclear One Indian Point Nuclear Generating Units Units 1 & 2 1, 2, and 3 Docket Nos. 50-313, 72-13 & 50-368 Docket Nos.50-003, 50-247, 72-51 and 50-286 Pilgrim Nuclear Power Station Waterford 3 Steam Electric Station Docket No. 50-293 Docket No. 50-382 James A. FitzPatrick Nuclear Power Palisades Nuclear Plant Plant Docket Nos. 50-255 & 72-7 Docket Nos. 50-333 & 72-12 Vermont Yankee Nuclear Power Big Rock Point Station Docket Nos. 50-155 & 72-43 Docket Nos. 50-271 & 72-59

Dear Sir or Madam:

The attachments to this letter provide updated correspondence service lists for the Entergy nuclear fleet. The lists supersede previous service lists for the above subject dockets.

Please address correspondence to the applicable addresses listed in Table I and provide copies to the applicable distribution listed in Table 2. Table 2 also includes contacts for the biweekly Federal Register Notices concerning an applications and amendments to facility operating licenses.

If you have any questions or require additional information, please contact Bryan Ford at (601) 368-5516.

/QW(e I "4LI1I

CNRO-2008-0003 Page 2 of 2 This letter contains no new commitments.

Sincerely, BSF/RWB Attachments:

1. Table 1 Correspondence Addressees
2. Table 2 Correspondence Distribution cc: Mr. W. R. Brian (GGNS)

Mr. K. H. Bronson (PNPS)

Mr. T. A. Burke (ECH)

Mr. P. T. Dietrich (JAF)

Mr. J. S. Forbes (ECH)

Mr. J. T. Herron (ECH)

Mr. T. G. Mitchell (ANO)

Mr. M. Perito (RBS)

Mr. J. E. Pollock (IPEC)

Mr. N. S. Reynolds (W&S)-

Mr. L. J. Smith (Wise, Carter)

Mr. T. A. Sullivan (VY)

Mr. C. J. Schwarz (PLP)

Mr. K. T. Walsh (W-3)

Mr. James L. Caldwell, NRC Regional Administrator, RIII Dr. Elmo E. Collins, NRC Regional Administrator, RIV Mr. Samuel J. Collins, NRC Regional Administrator, RI Mr. N. Kalyanam, NRC Project Manager, W-3 Mr. A. Wang, NRC Project Manager, ANO Mr. B. Vaidya, NRC Project Manager, GGNS/RBS Mr. J. Kim, NRC Project Manager, PNPS/VY Mr. J. Boska, NRC Project Manager, JAF/IPEC Mr. M. Chawla, NRC Project Manager, PLP to CNRO-2008-0003 Page 1 of 2 Table I Correspondence Addressees Address correspondence to the following:

Facility Address Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Vice President, Operations Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Nuclear Operations Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 Vice President, Operations Entergy Nuclear Operations Grand Gulf Nuclear Station P. 0. Box 756 Port Gibson, MS 39150 Indian Point Energy Center Unit 1 Docket 50-003 Vice President, Operations Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Entergy Nuclear Operations Indian Point Energy Center Unit 3 Docket 50-286 Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Docket 50-333 & 72-12 Vice President, Operations Entergy Nuclear Operations J. A. FitzPatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 River Bend Station Unit 1 Docket 50-458 & 72-49 Vice President, Operations Entergy Nuclear Operations River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Big Rock Point Docket 50-155 & 72-43 Vice President, Operations Palisades Nuclear Plant Docket 50-255 & 72-7 Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Pilgrim Nuclear Power Station Docket, 50-293 Vice President, Operations Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 to CNRO-2008-0003 Page 2 of 3 Table 1 Correspondence Addressees Address correspondence to the following:

Facility Address Vermont Yankee Docket 50-271 & 72-59 Vice President, Operations Entergy Nuclear Operations Vermont Yankee Nuclear Power Station PO Box 250 Governor Hunt Road Vernon, VT 05354 Waterford 3 Steam Electric Docket 50-382 Vice President, Operations Station Entergy Nuclear Operations Waterford 3 SES 17265 River Road Killona, LA 70057-3093

Attachment 2 to CNRO-2008-0003 Page 1 of 3 Table 2 Correspondence Distribution Send copies of correspondence to the following:

Facility Address Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Senior Vice President Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Nuclear Operations Big Rock Point Docket 50-155 & 72-43 P. O. Box 31995 Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 Jackson, MS 39286-1995 Indian Point Energy Center Unit 1 Docket 50-003 Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Vice President Oversight Indian Point Energy Center Unit 3 Docket 50-286 Entergy Nuclear Operations James A. FitzPatrick Docket 50-333 & 72-12 P. O. Box 31995 River Bend Station Unit 1 Docket 50-458 & 72-49 Jackson, MS 39286-1995 Palisades Nuclear Plant Docket 50-255 & 72-7 Senior Manager, Nuclear Safety &

Pilgrim Nuclear Power Station Docket 50-293 Licensing Vermont Yankee Docket 50-271 & 72-59 Entergy Nuclear Operations Waterford 3 Steam Electric Station Docket 50-382 P. O. Box 31995 Jackson, MS 39286-1995 Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Senior Vice President and COO Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Operations, Inc.

Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 P. 0. Box 31995 River Bend Station Unit 1 Docket 50-458 & 72-49 Jackson, MS 39286-1995 Waterford 3 Steam Electric Station Docket 50-382 Assistant General Counsel*

Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995 Indian Point Energy Center Unit 1 Docket'50-003 Senior Vice President and COO Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Entergy Nuclear Operations Indian Point Energy Center Unit 3 Docket 50-286 440 Hamilton Avenue James A. FitzPatrick Docket 50-333 & 72-12 White Plains, NY 10601 Big Rock Point Docket 50-155 & 72-43 Palisades Nuclear Plant Docket 50-255 & 72-7 Assistant General Counsel*

Pilgrim Nuclear Power Station Docket 50-293 Entergy Nuclear Operations Vermont Yankee Docket 50-271 & 72-59 440 Hamilton Avenue White Plains, NY 10601 Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Manager, Licensing Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Nuclear Operations Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802

  • The Assistant General Counsels are also the Entergy contacts for the biweekly Federal Register Notices concerning applications and amendments to facility operating licenses.

Attachment 1 to CNRO-2008-0003 Page 2 of 3 Table 2 Correspondence Distribution Send copies of correspondence to the following:

Facility Address Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 Manager, Licensing Entergy Nuclear Operations Grand Gulf Nuclear Station P. 0. Box 756 Port Gibson, MS 39150 Indian Point Energy Center Unit 1 Docket 50-003 Manager, Licensing Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Entergy Nuclear Operations Indian Point Energy Center Unit 3 Docket 50-286 Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Docket 50-333 & 72-12 Manager, Licensing Entergy Nuclear Operations J. A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 River Bend Station Unit 1 Docket 50-458 & 72-49 Manager, Licensing Entergy Nuclear Operations River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Big Rock Point Docket 50-155 & 72-43 Manager, Licensing Palisades Nuclear Plant Docket 50-255 & 72-7 Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Pilgrim Nuclear Power Station Docket 50-293 Manager, Licensing Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Vermont Yankee Docket 50-271 & 72-59 Manager, Licensing Entergy Nuclear Operations Vermont Yankee Nuclear Power Station PO Box 250 Governor Hunt Road Vernon, VT 05354

Attachment 1 to CNRO-2008-0003 Page 3 of 3 Table 2 Correspondence Distribution Send copies of correspondence to the following:

Facility Address Waterford 3 Steam Electric Station Docket 50-382 Manager, Licensing Entergy Nuclear Operations Waterford 3 SES 17265 River Road Killona, LA 70057-3093

IUCLEAR I Entergy MANuAGEMENT (NON)-QUALITY RELATED EN-LI-1 06 REV 0 MNA INFORMATION USE 'Page 1 of 2 ATTACHMENT 9.4 NRC SUBMITTAL REVIEW Letter #: CNRO-2008/0003' .: Response Due.: NA.

Su  : Entergy Fleet Correspondence Service List Date Issued for Review: 1/29/2008 Correspondence Preparer / Phone#: Ron Byrd / 8-433-5792 Section I Letter Concurrence and Agreement to Perform Actions POSITION 1 N~AME Action Signature, (concurrence,' certification, etc.) (sign, interoffice memo, e-mail, or telecom),

Manager, Licensing - ANO Concurrence Dale James 4, C

$e/*?/R1910 Manager, Licensing - GGNS Concurrence #3)/ .

e,,.*I,/  ?-,#,, ,1. L*,,,'s 1-.7

/ Drew Bottemiller . ,,

Manager, Licensing - IPEC / Concurrence 13Sy ed*t..,; 4kd led/ o/

Robert Walpole Manager, Licensing - JAF / Concurrence Jim Costedio d i Manager, Licensing - PNPS/ Concurrence 6y e-s,;/ 1 l I/3O/Oc; Joseph Lynch Manager, Licensing - RBS / Concurrence David Lorfing e:5-et/ 0149 ICV 1130/0 9 Manager, Licensing - VY/ Concurrence 4' elu,,, *,rleye,'/

David Mannai .- Jed V/'

Manager, Licensing - W3 / Concurrence 13y, e,,,*,,/ *..,, 0. A,',r.

Bob Murillo a/alZ-,o ,/Og Manager, Licensing - PLP & Concurrence C,,-ia . -. &,.¶4/' by BRP / Laurie Lahti ',

. v" COMMENTS res$hl / ,y .A

  • This letter is administrative and does not need certification. ov ii' 6.

/ r NUCLEAR (NON)-QUALITY RELATED EN-LI-106 REV. 0 MANAGEMENT INFORMATION USE Page 2 of 2 Section II Correspondence Screening Does this letter contain commitments? If "yes," identify the commitments with due dates Yes E in the submittal and in Section III. No z Does this letter contain any information or analyses of new safety issues performed at NRC Yes El request or to satisfy a regulatory requirement? If "yes," reflect requirement to update the No [

UFSAR in Section II1.

Does this letter require any document changes (e.g., procedures, DBDs, FSAR, TS Bases, Yes LI etc.), if approved? If "yes," indicate in Section Ill an action for the responsible No Z department to determine the affected documents. (The Correspondence Preparer may indicate the specific documents requiring revision, if known or may initiate an action for review.)

Does this letter contain information certified accurate? If "yes," identify the information and Yes EL document certification in an attachment. (Attachment 9.5 may be used.) No Z Section III Action Items equired Actions Note: Actions needed upon approval should be captured in the appropriate action tracking system Section IV Final Document Signoff for Submittal Correspondence Preparer Final Submittal Review (optional)

Responsible Department Head See Letter Signature