CNRO-2008-00010, Entergy, Transmittal of Fleet Updated Correspondence Service List

From kanterella
Jump to navigation Jump to search
Entergy, Transmittal of Fleet Updated Correspondence Service List
ML080710365
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Big Rock Point, FitzPatrick  Entergy icon.png
Issue date: 02/27/2008
From: Ford B
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2008-00010
Download: ML080710365 (9)


Text

Entergy Operations, Inc.

'Entergy 1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 Bryan S. Ford Senior Manager, Nuclear Safety &

Licensing CNRO-2008-00010 February 27, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Fleet Updated Correspondence Service List Arkansas Nuclear One, Units 1 and 2, Docket Nos. 50-313, 72-13 & 50-368 Big Rock Point, Docket Nos. 50-155 & 72-43 Gra.nd ,Gulf Nuclear Station, Docket Nos. 50-416 & 72-50 Indian Point Nuclear Generating Units 1, 2, and 3, Docket Nos.50-003, 50-247, 50-286 & 72-51 James A. FitzPatrick Nuclear Power Plant, Docket Nos. 50-333 & 72-12 Palisades Nuclear Plant, Docket Nos. 50-255 & 72-7 Pilgrim Nuclear Power Station, Docket No. 50-293 River Bend Station, Docket Nos. 50-458 & 72-49 Vermont Yankee Nuclear Power Station, Docket Nos. 50-271 & 72-59 Waterford 3 Steam Electric Station, Docket No. 50-382

REFERENCE:

1. Letter CNRO-2008-00003, from Entergy to USNRC, "Entergy Fleet Correspondence Service List" dated February 6, 2008.

Dear Sir or Madam:

Entergy provided an updated correspondence service list for the Entergy nuclear fleet by Reference 1 above. This letter revises the address tables to clarify the licensee company names associated with each address. The attached tables supersede the tables provided by Reference 1. This letter contains no new commitments.

If you have any questions or require additional information, please contact Bryan Ford at (601) 368-5516.

Sincerely, BSF/RWB Attachments:

1. Table 1 Correspondence Addressees
2. Table 2 Correspondence Distribution 0 00ý

CNRO-2008-00010 Page 2 of 2 cc: Mr. W. R. Brian (GGNS)

Mr. K. H. Bronson (PNPS)

Mr. T. A. Burke (ECH)

Mr. P. T. Dietrich (JAF)

Mr. J. S. Forbes (ECH)

Mr. J. T. Herron (ECH)

Mr. T. G. Mitchell (ANO)

Mr. M. Perito (RBS)

Mr. J. E. Pollock (IPEC)

Mr. N. S. Reynolds (W&S)

Mr. L. J. Smith (Wise, Carter)

Mr. T. A. Sullivan (VY)

Mr. C. J. Schwarz (PLP)

Mr. K. T. Walsh (W-3)

Mr. James L. Caldwell, NRC Regional Administrator, Rill Dr. Elmo E. Collins, NRC Regional Administrator, RIV Mr. Samuel J. Collins, NRC Regional Administrator, RI Mr. N. Kalyanam, NRC Project Manager, W-3 Mr. A. Wang, NRC Project Manager, ANO Mr. B. Vaidya, NRC Project Manager, GGNS/RBS Mr. J. Kim, NRC Project Manager, PNPS/IY Mr. J. Boska, NRC Project Manager, JAF/IPEC Ms. F. Saba, NRC Project Manager, PLP Mr. J. Hall, NRC Project Manager, BRP

CNRO-2008-00010 bcc: Mr. C.A. Bregar (ANO)

Mr. C. A. Bottemiller (GGNS)

Ms. K. S. Cook (W-3)

Mr. J. J. Costedio (JAF)

Ms. C. D. Faison (WPO)

Ms. S. S. Fey (W-3)

Mr. W. J. Fountain (RBS)

Mr. D. E. James (ANO)

Ms. L. Lahti (PLP)

Mr. D. N. Lorfing (RBS)

Mr. J. Lynch (PNPS)

Ms. K. C. Maher (RBS)

Mr. D. J. Mannai (VY)

Mr. J. F. McCann (WPO)

Mr. R. J. Murillo (W-3)

Mr. S. D. Osborn (GGNS)

Ms. D. S. Waldron (ANO)

Mr. R. W. Walpole (IPEC)

Corporate File [ 8 ]

to CNRO-2008-00010 Page 1 of 2 Table 1 Correspondence Addressees Address correspondence to the following:

Facility Address Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Vice President, Operations Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Operations, Inc.

Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P. 0. Box 756 Port Gibson, MS 39150 Indian Point Energy Center Unit 1 Docket 50-003 Vice President, Operations Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Entergy Nuclear Operations, Inc.

Indian Point Energy Center Unit 3 Docket 50-286 Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Docket 50-333 & 72-12 Vice President, Operations Entergy Nuclear Operations, Inc.

J. A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 River Bend Station Unit 1 Docket 50-458 & 72-49 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Big Rock Point Docket 50-155 & 72-43 Vice President, Operations Palisades Nuclear Plant Docket 50-255 & 72-7 Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Pilgrim Nuclear Power Station Docket 50-293 Vice President, Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 to CNRO-2008-00010 Page 2 of 2 Table I Correspondence Addressees Address correspondence to the following:

Facility Address Vermont Yankee Docket 50-271 & 72-59 Vice President, Operations Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station PO Box 250 Governor Hunt Road Vernon, VT 05354 Waterford 3 Steam Electric Docket 50-382 Vice President, Operations Station Entergy Operations, Inc.

Waterford 3 SES 17265 River Road Killona, LA 70057-3093

Attachment 2 to CNRO-2008-00010 Page 1 of 3 Table 2 Correspondence Distribution Send copies of correspondence to the following:

Facility Address Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Senior Vice President Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Nuclear Operations, Inc.

Big Rock Point Docket 50-155 & 72-43 P. 0. Box 31995 Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 Jackson, MS 39286-1995 Indian Point Energy Center Unit 1 Docket 50-003 Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Vice President Oversight Indian Point Energy Center Unit 3 Docket 50-286 Entergy Nuclear Operations, Inc.

James A. FitzPatrick Docket 50-333 & 72-12 P. 0. Box 31995 River Bend Station Unit 1 Docket 50-458 & 72-49 Jackson, MS 39286-1995 Palisades Nuclear Plant Docket 50-255 & 72-7 Pilgrim Nuclear Power Station Docket 50-293 Senior Manager, Nuclear Safety &

Vermont Yankee Docket 50-271 & 72-59 Licensing Waterford 3 Steam Electric Station Docket 50-382 P. 0. Box 31995 Jackson, MS 39286-1995 Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Senior Vice President and COO Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Operations, Inc.

Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 P. 0. Box 31995 River Bend Station Unit 1 Docket 50-458 & 72-49 Jackson, MS 39286-1995 Waterford 3 Steam Electric Station Docket 50-382 Associate General Counsel*

Entergy Nuclear Operations, Inc.

P. 0. Box 31995 Jackson, MS 39286-1995 Indian Point Energy Center Unit 1 Docket 50-003 Senior Vice President and COO Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Entergy Nuclear Operations, Inc.

Indian Point Energy Center Unit 3 Docket 50-286 440 Hamilton Avenue James A. FitzPatrick Docket 50-333 & 72-12 White Plains, NY 10601 Big Rock Point Docket 50-155 & 72-43 Palisades Nuclear Plant Docket 50-255 & 72-7 Assistant General Counsel*

Pilgrim Nuclear Power Station Docket 50-293 Entergy Nuclear Operations, Inc.

Vermont Yankee Docket 50-271 & 72-59 440 Hamilton Avenue White Plains, NY 10601 Arkansas Nuclear One Unit 1 Docket 50-313 & 72-13 Manager, Licensing Arkansas Nuclear One Unit 2 Docket 50-368 Entergy Operations, Inc.

Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802

  • The Associate and Assistant General Counsels are also the Entergy contacts for the biweekly Federal Register Notices concerning applications and amendments to facility operating licenses.

Attachment 2 to CNRO-2008-00010 Page 2 of 3 Table 2 Correspondence Distribution Send copies of correspondence to the following:

Facility Address Grand Gulf Nuclear Station Unit 1 Docket 50-416 & 72-50 Manager, Licensing Entergy Operations, Inc.

Grand Gulf Nuclear Station P. 0. Box 756 Port Gibson, MS 39150 Indian Point Energy Center Unit 1 Docket 50-003 Manager, Licensing Indian Point Energy Center Unit 2 Docket 50-247 & 72-51 Entergy Nuclear Operations, Inc.

Indian Point Energy Center Unit 3 Docket 50-286 Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Docket 50-333 & 72-12 Manager, Licensing Entergy Nuclear Operations, Inc.

J. A. FitzPatrick Nuclear Power Plant P.O. Box 110 .

Lycoming, NY 13093 River Bend Station Unit 1 Docket 50-458 & 72-49 Manager, Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Big Rock Point Docket 50-155 & 72-43 Manager, Licensing Palisades Nuclear Plant Docket 50-255 & 72-7 Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Pilgrim Nuclear Power Station Docket 50-293 Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Vermont Yankee Docket 50-271 & 72-59 Manager, Licensing Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station PO Box 250 Governor Hunt Road Vernon, VT 05354

Attachment 2 to CNRO-2008-00010 Page 3 of 3 Table 2 Correspondence Distribution Send copies of correspondence to the following:

Facility Address Waterford 3 Steam Electric Station Docket 50-382 Manager, Licensing Entergy Operations, Inc.

Waterford 3 SES 17265 River Road Killona, LA 70057-3093

Sy NUCLEAR (NON)-QUALiTY RELATED EN-L-I06 REV. 0 MANUAL INFORMATION USE Page I of 2 ATTACHMENT 9.4 NRC SUBMITrAL REVIEW Letter #: CNRO-2008-00010 Respoi ise Due: NA,

Subject:

Entergy Fleet Updated Correspondence Date Is sued for Review: 2/25/2008 Service List

)

Correspondence Preparer Phone #: Ron Byrd,/ 8-4-33-5792 Suartinn I L~tt~r Cnnr~urr~nr~~ .nd AnrA~mAnt to Perform Aetinn~

I Letter Concurr e ad A. Actionon

t. S POSITION

..... '" INAME Action

(concUrrence;' certification,- etci.'), Signature

. (Sign, interoffice memo, e-mail, or '

_________________________telecom)

None Section II Correspondence Screening Does this letter contain commitments? If "yes," identify the commitments with due dates Yes 11 in the submittal and in Section II1. No [

Does this letter contain any information or analyses of new safety issues performed at NRC Yes El request or to satisfy a regulatory requirement? If "yes," reflect requirement to update the No [

UFSAR in Section III.

Does this letter require any document changes (e.g., procedures, DBDs, FSAR, TS Bases, Yes El etc.), if approved? If "yes," indicate in Section III an action for the responsible No z department to determine the affected documents. (The Correspondence Preparer may indicate the specific documents requiring revision, if known or may initiate an action for review.)

Does this letter contain information certified accurate? If "yes," identify the information and Yes El document certification in an attachment. (Attachment 9.5 may be used.) No [

Section III Action Items Required Actions Due Date Responsible Dept.

Note: Actions needed upon approvalshould be captured in the appropriateaction tracking system None NA NA Section IV Final Document Signoff for Submittal Correspondence Preparer Final Submittal Review (optional)

Responsible Department Head See Letter Signature