Text
- ' Entergy Entergy Operations, Inc.
Entergy Nuclear Operations, Inc.
P. O. Box 31995 1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5516 John F. McCann Vice President, Nuclear Safety, Emergency Planning and Licensing CNRO-2011-00007 October 6, 2011 Document Control Desk Director, Division of Security Operations Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: J. Keith Everly, MS O-2D15
SUBJECT:
Entergy - 2011 Recertification of Foreign Ownership Control or Interest (FOCI)
Arkansas Nuclear One, Units 1&2; Cooper Nuclear Station; Grand Gulf Nuclear Station; Indian Point Energy Center, Units 1, 2, and 3; James A. FitzPatrick Nuclear Power Plant; Palisades Nuclear Plant; Pilgrim Nuclear Power Station; River Bend Station; Vermont Yankee Nuclear Power Station; and Waterford 3 Steam Electric Station.
- 1. Letter to M. R. Kansler from A. Lynn Silvious dated July 11, 2007, Request for Annual Recertification (CNRI-2007-00016)
REFERENCES:
- 2. Letter from J. T. Herron to J. Keith Everly dated August 17, 2010, Entergy - 2010 Recertification of Foreign Ownership Control or Interest (FOCI) and Request for FOCI Redetermination (CNRO-2010-00003)
Dear Sir or Madam:
This letter is the Entergy 2011 response to the Reference (1) request for Entergy to annually re-certify whether significant changes have occurred in the extent and nature of FOCI that would affect our answers to the questions provided in Entergy's Certificate Pertaining to Foreign Interest (Standard Form 328). The same certification is also required for any tier parents. This re-certification is required in order to retain a favorable Foreign Ownership, Control or Influence (FOCI) determination.
In accordance with national policy, Entergy hereby certifies that (1) no significant changes have occurred in the extent and nature of FOCI that would affect Entergy's answers to the questions provided in its Certificate Pertaining to Foreign Interest, (2) no changes have occurred in the organization's ownership, and (3) changes that have occurred in the organization's owners, officers, directors, and executive personnel are as shown in the attached OODEP lists.
~\\ e57~
Attachments 1 & 2 contain P11. When separated from the attached documents, this cover letter does not contain P11, and is uncontrolled.
CNRO-2011-00007 Page 2 of 3 In Reference 2, Entergy submitted its new comprehensive Certificate Pertaining to Foreign interests, along with current financial information to NRC/DNS for a FOCI redetermination1 That request is still pending with you. The OODEP lists provided at this time include various personnel moves among management and executive employees that were announced August 15, 2011. These lists supersede the OODEP lists provided via Reference 2 and should be consulted when reviewing our redetermination request which we understand from you should begin this month. Where shown changes to Facility Security Officers requires key personnel clearances not yet obtained, a U. S. citizen cleared to a level commensurate with the Facility Clearance will be appointed as acting FSO (c.f.10 CFR 95.17 and 95.18).
Entergy will re-certify this FOCI annually from the date of this letter or when requested by NRC.
Should you have any questions please contact Mr. Les England at (601) 368-5766.
This letter contains no new commitments.
Sincerel)
JFM/LAE/lae Attachments
- 1. OODEP for Entergy Operations, Inc.
- 2. OODEP for Entergy Nuclear Operations, Inc.
cc: See next page The original Certificate was tendered on June 24, 2002 and was amended on August 23, 2004. The initial FOCI determination was dated November 21, 2005 and the Facility Clearance was issued November 23, 2005. The redetermination submittal was due by November 21, 2010, five years from the initial FOCI determination and was tendered August 17, 2010 via Reference 2.
Attachments 1 & 2 contain P11. When separated from the attached documents, this cover letter does not contain P11, and is uncontrolled.
2
CNRO-2011-00007 Page 3 of 3 cc: (All w/ Attachments SSN redacted)
Mr. J. A. Aluise, Assistant Secretary, EOI, ENOI Mr. M. A. Balduzzi, SVP, Technical Services, EOI Mr. S. J. Bethay, VP, Oversight, ENOI Mr. K. H. Bronson, SVP, COO, ENOI (effective 11/6/11)
Mr. K. J. Mulligan, VP Operations Support, EOI/ENOI Mr. M. J. Colomb, VP, VY, ENOI Mr. F. R. Dacimo, VP, License Renewal, ENOI Mr. K. H. Bronson VP, JAF, ENOI Mr. J. R. Douet, VP Business Development, ENOI Mr. C. Eubanks, VP, Project Management, EOI/ENOI Mr. J. S. Forbes, SVP, Nuclear Operations, EOI Mr. J. T. Herron, CEO, EOI/ENOI Ms. D. Jacobs, VP, WF3, EOI Mr. J. A. Kowalewski, SVP, COO, EOI Mr. T. G. Mitchell, SVP, COO, ENOI Mr. 0. Limpias, VP, Engineering, EOI/ENOI Mr. E. W. Olson, VP, RBS, EOI Mr. M. Perito, VP, GGNS, EOI Mr. J. E. Pollock, VP, IPEC, ENOI Mr. C. J. Schwarz, VP, ANO, EOI Mr. R. G. Smith, VP, PNP, ENOI Mr. A. J. Vitale, VP, PLP, ENOI Mr. J. P. Boska, Sr. PM, IPEC U2,3, JAF Mr. M. L. Chawla, PM, PLP Mr. E. E. Collins, Administrator, RIV Mr. W. M. Dean, Administrator, RI Mr. S. Giebel, PM, IPEC U1 Mr. R. V. Guzman, PNPS Mr. N. Kalyanam, PM, ANO, W-3 Mr. J. S. Kim, PM, VY Mr. M. A. Satorius, Administrator, RIII Mr. B. K. Vaidya, PM, JAF Mr. A. B. Wang, PM, GGNS, RBS Site Resident Inspectors Attachments 1 & 2 contain P11. When separated from the attached documents, this cover letter does not contain P11, and is uncontrolled.