IA-84-940, Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility | 11 December 1984 | Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility | |
IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl | 19 November 1984 | Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl | |
IA-85-261, Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility | 3 March 1978 | Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility | |
IA-85-362, Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions | 21 February 1985 | Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions | |
IA-85-452, Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance | 9 July 1984 | Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance | |
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | 31 December 1980 | Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | Boric Acid Systematic Assessment of Licensee Performance |
IA-85-562, Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted | 20 February 1985 | Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted | |
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | 2 May 1985 | Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | Safe Shutdown Earthquake Earthquake |
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | 26 April 1982 | Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | |
IA-85-665, Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones | 25 February 1964 | Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones | Earthquake |
IA-85-668, Partially Withheld Notice of Board Meeting 85-10 | 12 April 1985 | Partially Withheld Notice of Board Meeting 85-10 | |
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | 22 August 1985 | Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | |
IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested | 8 March 1982 | Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested | |
IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | 22 September 1986 | Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | |
IA-87-111, Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety | 19 October 1972 | Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety | Safe Shutdown |
IA-87-121, Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code | 24 June 1982 | Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code | |
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | 14 July 1983 | Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | Internal Flooding Backfit Overspeed trip |
IA-87-413, Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews | 24 February 1987 | Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews | High Radiation Area |
IA-87-449, Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il | 10 July 1987 | Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il | |
IA-87-535, Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct | 23 January 1986 | Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct | |
IA-87-830, Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl | 19 November 1986 | Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl | Systematic Assessment of Licensee Performance |
IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR | 21 March 1988 | Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR | |
IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl | 9 March 1988 | Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl | Stroke time |
IA-88-356, Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl | 4 May 1987 | Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl | |
IA-88-497, Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl | 24 June 1988 | Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl | |
IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 | 16 September 1987 | Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 | |
IR 05000117/2004015 | 25 July 1985 | Updates Operating Experience for Plant for 850415-0715. Review Updates Encl 850129 & 0426 Reviews for 841026-850117 & 850117-0415,respectively | |
IR 05000275/1984007 | 21 June 1984 | Forwards Special Insp Rept 50-275/84-07 Re Performance of Plant Operating Crews,Conducted by Region V,Lll & Eg&G Idaho,Inc.Performance Above Average Compared to Similar Licensed Facilities | |
IR 05000275/1985036 | 30 December 1985 | Requests NRR Assume Lead Responsibility for Evaluation & Resolution of Unresolved Item 50-275/85-36-04 Re Fire Dampers | Safe Shutdown Fire Barrier Emergency Lighting Continuous fire watch Fire Watch Hourly Fire Watch |
IR 05000324/1986007 | 28 July 1986 | Forwards Insp Repts 50-325/86-06,50-324/86-07,50-400/86-43, 50-325/86-18,50-324/86-19 & One Internal Document Re Results of Technical Review Re Region II Actions on Miriello Cases.W/O Encl | |
IR 05000346/1979013 | 10 September 1979 | Forwards Insp Rept 50-346/79-13 Reflecting Responses to IE Bulletin 79-05A-B | Temporary Modification |
IR 05000397/1987006 | 1 July 1987 | Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept | |
IR 05000400/1985048 | 14 July 1986 | Notifies of Ofc of Investigations Discontinuance of Inquiry Q2-85-021 & Related Area of Interest as to Matter Contained in Insp Rept 50-400/85-48.Insp Rept & Notice of Violation May Be Released | |
IR 05000410/1983006 | 2 December 1983 | Discusses 830422 Anonymous Allegation Re Deficiencies in Emergency Diesel Generator Sys,Radiation Containment Sys & Qualifications of Contract Personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06) | |
IR 05000445/1978020 | 9 February 1979 | Corrects Notice of Deviation Re Insp Rept 50-445/78-20,per Util 790209 Response | |
IR 05000454/1983038 | 27 January 1984 | Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo | |
IR 05000482/1983013 | 26 July 1983 | Informs That Allegation 4-83-A-17 Re Improper Use of white-out Unsubstantiated.Forwards Insp Rept 50-482/83-13. Engineering Section Insp to Be Conducted.W/O Encl | |
IR 05000482/1983028 | 26 October 1983 | Informs That Allegation 4-83-A-17 Inspected by R Hall on 830919-22 & Findings Reported in Encl 50-482/83-28.W/o Insp Rept.Related Info Encl | Affidavit |
IR 05000482/1984001 | 22 February 1984 | Informs That Remaining Item on Allegation 4-83-A-25 Completed.W/O Insp Rept 50-482/84-01 | |
IR 05000482/1984051 | 11 December 1984 | Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl | |
IR 05000528/1985012 | 25 September 1985 | Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986 | |
IR 05000529/1985044 | 27 November 1985 | Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable | |
ML082320170 | 4 October 1985 | Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC Response | Backfit |
ML082380843 | 7 November 1985 | Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item Closed | Backfit |
ML082890913 | 18 March 1985 | Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 | |
ML18046B289 | 4 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML18046B290 | 10 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | Safeguards Contingency Plan |
ML20024C571 | 1 July 1981 | Provides Sequence of Events | Boric Acid |
ML20024C816 | 15 November 1978 | Informs That Toledo Edison Needs to Reduce Auxiliary Feedwater Setpoints for Natural Circulation.Suggestion to Resolve Impasse Provided.Further Analytical Effort Required to Confirm 10 Ft Level Setpoint Adequate | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components |