Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17279A1917 April 1987Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl
ML18010A95230 November 1992NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216.Nondestructive Examination
Liquid penetrant
ML18010B0845 May 1993NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216.Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Stroke time
Temporary Modification
Stress corrosion cracking
Liquid penetrant
Overspeed trip
ML20041F26912 March 1982Licensing Review Group II Position Papers, Vol IVSafe Shutdown
ML20043A90531 March 1990Rev 1 to Implementation of Reg Guide 1.99,Rev 2 for River Bend Station,Unit 1.Hydrostatic
ML20043A90630 June 1988Flux Wire Dosimeter Evaluation for River Bend Station.
ML20052A86530 April 1982Design of River Bend Station Containment W/Concrete Annulus Fill.Hydrostatic
Earthquake
ML20072P98815 November 1990Draft Reassessment of Indication in Riverbend Feedwater Nozzle (N4A) to Safe End Weld
ML20072T65731 March 1991Rev 1 to Bounding Evaluation for River Bend 1 Heatup Rate Event
ML20077A46130 April 1991Transient Analysis MethodologyAnticipated operational occurrence
Fuel cladding
ML20078C78830 June 1994Revised Semi-Annual Rept on Fitness-For-Duty Program, for Reporting Period of 940101-0630
ML20079P12131 October 1991Suppl 1 to Nonproprietary River Bend Station Plant Station Plant Transient Analysis Methodology - Delta CPR Methodology & Addl BenchmarksStroke time
Anticipated operational occurrence
Feedwater Controller Failure
ML20080B39630 November 1994Brief Aerial Photography Analysis of River Bend Station at St Francisville,LA:1993-94
ML20080J93030 March 1983Draft Analysis of Const Status & Const Completion Dates
ML20081A19410 February 1984Historical & Archaeological Investigation of Ruins of Nineteenth Century Sugar Mill (16WF-36) in West Feliciana Parish,La
ML20081B71530 March 1983Calculations Re Facility Components.Supporting Documentation Encl
ML20084F42724 April 1984Safety Parameter Display Sys Accident Monitoring Instrumentation Database Identification Study for River Bend Unit 1Safe Shutdown
Reactor Vessel Water Level
Grab sample
Scram Discharge Volume
Fuel cladding
Unidentified leakage
Failure to Scram
ML20086C43731 May 1995Draft, Metallurgical Evaluation of Feedwater Nozzle to Safe-End Weld from River Bend Station,Unit 1Non-Destructive Examination
ML20091C53931 July 1991Technical Justification for Eliminating Mid-Cycle Insp of Feedwater Nozzle (N4A) to Safe-End Weld Indication at River Bend Plant
ML20091D25631 May 1984Environ Qualification DocumentSafe Shutdown
Anticipated operational occurrence
ML20091J51631 January 1992Rev 0 to Steady State Core Physics Methods for BWR Design & AnalysisShutdown Margin
Power change
ML20092N60730 June 1984Rept on Termination of Const Activities for River Bend Station - Unit 2
ML20093C46730 April 1983Evaluation of Operational & Maint History of & Recent Mods to Main Engines in Motor Vessel Columbia
ML20093C47223 April 1983Motor Vessel Columbia Shaft Horsepower Measurement Sea Trial 24/25,Mar 1983
ML20093C47830 January 1981Engine Rebuild Rept:Motor Vessel Columbia
ML20093D1869 July 1984Seismic OBE & SSE Required Response Spectra for Auxiliary, Control,Diesel Generator,Fuel,Turbine,Pipe Tunnels 1 & 2 & Standby Svc Water Pumphouse & Cooling Tower Bldg
ML20093D1969 July 1984Chugging Required Response Spectra for Reactor Bldg
ML20093D2009 July 1984SRV Envelope Required Response Spectra for Reactor Bldg
ML20093D2179 July 1984Seismic OBE & SSE Required Response Spectra for Reactor Bldg
ML20093D2269 July 1984Seismic/Hydrodynamic Upset & Faulted Required Response Spectra for Reactor Bldg
ML20093M7128 October 1984Gulf States Util Co Position Re Safety/Relief Valve Discharge Testing at River Bend Station
ML20094P26931 March 1992Rev 0 to EA-CA-91-0001-S2, Steady State Core Physics Methods for BWR Design & Analysis, App GShutdown Margin
ML20096F23530 November 1995Brief Aerial Photography Analysis of River Bend Station at St Francisville,LA:1994-1995
ML20098B59931 March 1981Engine Rebuild Rept:Motor Vessel Columbia for State of Ak
ML20099H37631 October 1984Detailed Control Room Design Review,Methodology & Approach, Human Engineering Discrepancy Results, Summary ReptSafe Shutdown
Reactor Vessel Water Level
ML20100E83530 January 1984LOCA & Seismic Analysis
ML20100F31930 November 1995Suppl Reload Licensing Rept for RBS Reload 6,Cycle 7Shutdown Margin
Anticipated operational occurrence
ML20100N27020 November 1984Rev 1 to IE Bulletin 79-27 Study,Rept of Findings for River Bend Station Unit 1Squib
Power change
ML20100N41231 October 1984Control Sys Failures Evaluation Rept
ML20100N41431 October 1984Common Sensor Failure Evaluation Rept
ML20101M60931 December 1984Vols I-IV of Tdi Diesel Generator Design Review & Quality Revalidation ReptCoatings
Temporary Modification
Earthquake
Liquid penetrant
Loctite
ML20101R0698 June 1992Rev 92-6 to Approved Vendors List Matl Mfgs & Suppliers of ASME Section III Matl & Subcontracted Svcs
ML20107H17215 February 1985Rev 0 to High Energy Line Break Evaluation Rept (Effect on Nonsafety-Related Control Components)
ML20111C55028 February 1985Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation ReptEarthquake
Liquid penetrant
Loctite
ML20117A56330 April 1985Design & Computer Analysis of Siren Prompt Notification Sys River Bend Station
ML20117H28730 June 1996Common Cause Assessment of Refuel Operations at River Bend Station
ML20125C46031 May 1985Dcrdr Summary Rept SupplEmergency Lighting
Scram Discharge Volume
ML20127K6031 June 1985Operational Safety of Tdi DSR-48 Emergency Diesel Generator Crankshafts at River Bend Station,Gulf States Utils
ML20127K70818 May 1985Evaluation of DSR-48 Emergency Diesel Generator Crankshafts at River Bend StationLiquid penetrant
ML20128H45831 July 1985Preliminary Equipment Survivability Rept,River Bend Station Unit 1,Jul 1985Fuel cladding