Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 231 December 1996Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2Safe Shutdown
Boric Acid
High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Pressure boundary leak
Through-Wall Leak
Scaffolding
ML19247E19828 February 1981Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept
ML19325C14020 June 1989Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26.
ML19331C90421 July 1980Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept
ML20008F79130 April 1981Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981Safe Shutdown
ML20023A4862 September 1982Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation ReptHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20040D12811 December 1981Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML20040D12911 December 1981Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML20041D22731 January 1982Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept
ML20041D22931 January 1982Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept
ML20041D23331 January 1982Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal ReptSafe Shutdown
ML20045A52131 May 1993High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power StationReactor Vessel Water Level
Probabilistic Risk Assessment
Overtravel
ML20050S96528 February 1982Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept
ML20055A43628 February 1980Electrical,Instrumentation & Control Sys Support, Interim ReptReactor Vessel Water Level
ML20058H59915 November 1990Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing
ML20062B2997 June 1982Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2
ML20063C74325 June 1982Masonry Wall Design, Technical Evaluation ReptEarthquake
ML20076C4288 February 1983ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept
ML20079S07826 September 1994Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2
ML20080K63427 September 1983Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation ReptFinite Element Analysis
Earthquake
ML20080N46330 September 1983Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts
ML20086G51629 June 1995Technical Evaluation Rept on Individual Plant Exam Front End AnalysisMission time
Internal Flooding
Hardened vent
ML20086G52131 December 1994Technical Evaluation Rept on Individual Plant Exam Back-End AnalysisProbabilistic Risk Assessment
Hardened vent
ML20086G52830 November 1994Technical Evaluation Rept on Individual Plant Exam Human Reliability AnalysisMission time
Hardened vent
ML20087M83227 March 1984Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20091D59631 July 1983Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping SysPacking leak
Weld Overlay
Nondestructive Examination
Earthquake
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
ML20102A79331 January 1985Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2Squib
Fuel cladding
ML20127N6313 May 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2
ML20132D18730 June 1985Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2Reactor Vessel Water Level
Grab sample
Squib
Fuel cladding
ML20140E2992 June 1997Proposed Criteria for ECCS Strainer Design,Technical Evaluation ReptForeign Material Exclusion
ML20142A1209 January 1986SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2Earthquake
ML20151H2421 July 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation ReptFuel cladding
ML20204G3921 August 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept
ML20210L27130 April 1986Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation ReptStroke time
Weld Overlay
Hydrostatic
VT-2
Dissimilar Metal Weld
ML20211F03031 March 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1)
ML20214G95931 March 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants
ML20214Q89830 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept
ML20215M21231 May 1987Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept
ML20235L56230 June 1987Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal ReptOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
ML20236N83430 November 1978Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977