Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) | 24 September 2007 | Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) | |
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | 20 December 2016 | Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | High winds Enforcement Discretion Incorporated by reference Aging Management Earthquake Environmental Justice |
L-99-007, NPDES Permits No. SC0030856 Renewal Application (LP 252) | 26 October 2006 | NPDES Permits No. SC0030856 Renewal Application (LP 252) | Boric Acid High winds |
ML020350580 | 4 February 2002 | Computer Access & Operating Agreement | |
ML021360022 | 1 May 2002 | State of New Hampshire Notice of Public Hearing | |
ML030300763 | 28 February 2003 | Process for Controlling Micro Organism in Cooling Tower | |
ML030310152 | 28 February 2003 | Scana Draft Migratory Bird Treaty Act Procedure | High winds |
ML030310158 | 28 February 2003 | Sc DHEC Epidemiology Evaluation of Nuclear Reactors | |
ML030310164 | 28 February 2003 | Status of Transmission Line Upgrade for V. C. Summer | |
ML030310175 | 28 February 2003 | V.C. Summer Eeo Employment Information | |
ML031570110 | 18 June 2003 | Attachment 2, Summary of Conference Call with Exelon Nuclear Regarding the 2003 Steam Generator Inspections at Braidwood Unit 1 | |
ML032521429 | 20 August 2003 | Westinghouse - Nuclear Safety Advisory Letter NSAL-03-6, High Net Heat Input, Dated 08/20/2003 | |
ML032680741 | 5 September 2003 | Document Regarding Braidwood Fire Protection Inspection Issues | Hot Short Safe Shutdown Fire Barrier Fire Protection Program |
ML032690982 | 14 February 2005 | August 2003 - Init Exam - Es 401-4 Rejected K/A | |
ML032940098 | 27 March 2003 | Riv Backfit Status | Backfit |
ML032940104 | 7 October 2003 | Riv Backfit Status | Backfit |
ML040350212 | 13 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040350687 | 5 August 2003 | DRS Open Item Status | Safe Shutdown Boric Acid Fire Barrier Hemyc |
ML040350691 | 27 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040410492 | 20 February 2004 | Order EA-03-009 Service List | |
ML040410657 | 18 February 2004 | Meeting Summary of January 21, 2004 with STPNOC- Enclosure 4 - Stpnoc'S Response to NRC Staff'S Comments | |
ML040770589 | 13 April 2004 | Draft Information Request Response to RAI - Attachment 7 | Finite Element Analysis |
ML040770593 | 23 December 2003 | Draft Information Request PRA Analysis Assessment PRA-03-024, Rev. 0 - Attachment 6 | |
ML040900252 | 29 March 2004 | Attendees' List for Meeting with FPL Energy Regarding Stretch Power Uprate Request for Seabrook Station, Unit No. 1 | |
ML041070108 | 24 March 2004 | Attachment 1, Attendance. Virgil Summer Annual Assessment Meeting | |
ML042610072 | 13 September 2004 | Plant Engineering Branch Closed Items Interim Safety Basis | |
ML042960234 | 8 October 2004 | Licensee e-mail to Dave | Probabilistic Risk Assessment |
ML042960235 | 8 October 2004 | Final Results for Palo Verde | |
ML042960240 | 8 October 2004 | Page Heading Starts with Palo Verde, Danger Will Robinson: If You Change Cell Locations You May Break the V. | Mission time |
ML042960258 | 8 October 2004 | Page Starts with the Nuclear Regulatory Commission'S Management Directive 8.;3, Incident Investigation Program. | |
ML042960260 | 8 October 2004 | Page Starts with Risk Significance of the Event... | Mission time |
ML042960263 | 8 October 2004 | 0803 Gas Turbine Generator 1 Energizing NAN S07 | |
ML042960280 | 9 March 2004 | Licensing Document Change Request, Log No. 2003F040, Palo Verde, Units 1, 2 and 3, UFSAR | |
ML042960289 | 8 October 2004 | Offsite Power Supply Compliance with GDC 17 | Anticipated operational occurrence |
ML042960379 | 8 October 2004 | AIT 2004.xis | |
ML042960382 | 8 October 2004 | AIT 2004 Open.Xls | |
ML042960433 | 15 June 2004 | Background, on 6/15/04, Work Mech #2715799 Issued to Troubleshoot the Reason for the RCP Bearing Oil Lift Pump 2M-RCN-P02B Tripping the Overload Heaters, Electrical Maintenance Dispatched to Investigate | |
ML042960439 | 8 October 2004 | Unit 1 Letdown/Nc FSL-613 Issue | |
ML042960444 | 8 October 2004 | NRC Uri'S ERO Issues | |
ML042960593 | 8 October 2004 | Personnel Statement | Shutdown Margin |
ML042960598 | 8 October 2004 | Handwritten Note to Dwight USAR and GDC-17 Items on Offsite Power Requirement... | Safe Shutdown Earthquake |
ML050340022 | 7 February 2005 | OPGP03-ZA-0091 | Offsite Dose Calculation Manual Probabilistic Risk Assessment Maintenance Rule Program Scaffolding |
ML050340025 | 7 February 2005 | 0POP01-ZO-0006, Rev. 13, Extended Allowed Outage Time | Offsite Dose Calculation Manual Grace period |
ML050540464 | 9 February 2004 | Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants | |
ML050540469 | 10 February 2004 | Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 | Safe Shutdown Fire Barrier Condition Adverse to Quality Significance Determination Process Fire Protection Program |
ML051240152 | 9 May 2005 | Event Description: Attachment 7 | |
ML052500262 | 6 September 2005 | Recap of NRC Emergency Planning Roundtable to Be Included in Transcript and Record | Earthquake |
ML052580617 | 12 September 2005 | IR 50456457-05-008, Braidwood Requalification Program Inspection Plan (IP 71111.11B) | Shutdown Margin Job Performance Measure |
ML052700044 | 21 September 2005 | Attachment 10, FAQ Log 9/21/05 | Ultimate heat sink Mission time Post Accident Monitoring Coatings Large early release frequency Exemption Request |
ML053130070 | 2 November 2005 | Fault Description Document |