Text

Aif .tooq vOe7 -V13 Action # NRC PV Respondent Request Closed With Request Status (T)

Requester Date 59 McConnell Smyors Game Plan and any results for Ul ADV 185 Game plan provided. Results and 06117/2004 OPEN apaetcuse needed. Residents 73 McConnell Bolt Letdown line isolation failure 201 P/Q Radspinner held meeting with McConnell 06/17/2004 OPEN on 6/17/2004 Need evaluation of softparts subjected to high temperatures.

Residents 77 McConnell Holmes Magna Blast Breakers S05D/S06K Apparent Schroeder Residents 06/17/2004 OPEN cause of failure 93 Paulk Schroeder Effect and evaluation of components that were AIT Team 06/18/2004 OPEN connected &subjected to 67 Hz and plan to evaluate the equipment 107 Gody Straka Provide latest version of RFI List to AIT Team, called AIT - Gody on 6/28/2004 left voice 06/24/2004 OPEN conduct call to re-zero list of action items mall Review @1230 612912004 suagele 109 McConnell Hypso FSAR 10.2.2.3.1.4 Power/Load Unbalance. 06/24/2004 OPEN Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose Isto initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed.

I am curious to find out if a power/load unbalance signal occurred, and it the system

____________ reacted as expected per the FSAR.

111 Skinner Straka e-mail GEORGESGlcs.COM system e-mail George a copy of the STM on 06/24/2004 OPEN description of main generator protective relaying 6'24/2004 -waiting to see If this meets scheme his needs 117 McConnell Holmes- Samuels Procedure 4OEP-9EO10, Appendix 52, page 3 After researching various documents and 06/25/2004 OPEN of 23, states 'The GTGs can not supply Units 2 then talking to John Holmes I was and 3 simultaneously but can supply Units 1 prepared to give my answer to Dave and 2 or Units 1 and 3." Tim requested Loveless, however, I was unable to clarification of this statement. contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question.