Status of Transmission Line Upgrade for V. C. Summer
ML030310164
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/28/2003
From:
South Carolina Electric & Gas Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML030310164 (1)


Text

Item #30 Status of Transmission Line Upgrade & statement of compliance with 5 milliamp limit.

The planned reconfiguration of the Summer - Denny Terrace #1 and Parr - Edenwood transmission lines has not been performed as of January 8, 2003. The modification is awaiting appropriate electrical load and weather conditions. The planned reconfiguration has been designed to comply with the 2002 National Electric Safety Code so there should be no concern related to induced shock.