05000458/FIN-2002007-01Failure to properly lock open Valve CNM-FCV200Significance Determination Process
05000458/FIN-2007002-05Licensee-Identified Violation
05000458/FIN-2008002-01Internal Operating Experience Not Used to Prevent Recurrence of Reactor Recirculation FCV Runbacks Insert Description (Section 1R19.1)Reactor Vessel Water Level
05000458/FIN-2008002-02Condensate Demineralizer Tank Liner Failure (Section 1R19.2)Significance Determination Process
05000458/FIN-2008002-03Improper Design Control for Evaluating Emergency Diesel Generator Turbocharger Combustion Air Pipe Stresses (Section 1R19.3)
05000458/FIN-2008002-04Failure to Follow Reactor Startup Procedure Results in Six Control Rod Withdrawal Errors (Section 4OA2)Significance Determination Process
Fuel cladding
05000458/FIN-2008002-05Licensee-Identified ViolationSignificance Determination Process
Fuel cladding
05000458/FIN-2008003-01Inadequate Risk Assessment for Removing Control Building Chilled Water System from ServiceSignificance Determination Process
Incremental Core Damage Probability Deficit
05000458/FIN-2008003-02Inadequate Risk Assessment While Troubleshooting Results in Unanticipated Reactor Power OscillationsSignificance Determination Process
Incremental Core Damage Probability Deficit
05000458/FIN-2008003-03Failure to Follow a Radiation Protection ProcedureSignificance Determination Process
Substantial potential for overexposure
05000458/FIN-2008003-04Licensee-Identified ViolationSubstantial potential for an overexposure
05000458/FIN-2008003-05Licensee-Identified ViolationHigh Radiation Area
Substantial potential for overexposure
05000458/FIN-2008003-06Licensee-Identified ViolationSubstantial potential for an overexposure
05000458/FIN-2008003-07Licensee-Identified ViolationSubstantial potential for overexposure
05000458/FIN-2008004-01Inadequate Procedure for Staging the Station Blackout Diesel Generator during Severe WeatherHigh winds
05000458/FIN-2008004-02Inadequate Corrective Actions Results in Multiple Failures of Standby Service Water Switchgear Room Ventialtion FansCondition Adverse to Quality
05000458/FIN-2008004-03Inadequate Risk Assessment for Transformer Yard Maintenance While Shut Down
05000458/FIN-2008004-04Turbine Building Siding Failure Below Design Specifications
05000458/FIN-2008006-01Eight Examples of a Failure to Meet 10 CFR Part 50, Appendix B, Design Control (1R21.b.1)Ultimate heat sink
05000458/FIN-2008006-02Failure to Recalculate Suppression Pool Peak Temperature Response (1R21.b.2)
05000458/FIN-2008006-03Inadequate Testing Programs for 4-kV Circuit Breakers, Class 1E Molded Case Circuit Breakers, and the Emergency Diesel Generators (1R21.b.3)
05000458/FIN-2008006-04Inadequate Implementation of Temporary Installation Procedure (1R21.b.4)
05000458/FIN-2008006-05Inadequate Implementation of Operability Determination Procedure (4OA2.1)
05000458/FIN-2008006-06Inadequate/Untimely Corrective Action for Failure of Magnesium-Rotor Motor-Operated Valves (4OA2.2)Significance Determination Process
Large early release frequency
Fuel cladding
05000458/FIN-2009002-01Inadequate Risk Assessment While the Control Building Chilled Water System was Removed from ServiceSignificance Determination Process
Incremental Core Damage Probability Deficit
05000458/FIN-2009002-02Licensee-Identified ViolationFire Protection Program
05000458/FIN-2009002-03Licensee-Identified ViolationFire Protection Program
05000458/FIN-2009002-04Licensee-Identified Violation
05000458/FIN-2009002-05Licensee-Identified ViolationSignificance Determination Process
05000458/FIN-2009003-01Failure to Identify and Formally Critique an Emergency Plan WeaknessSignificance Determination Process
05000458/FIN-2009004-01Failure to Implement Containment Closure ProcedureSignificance Determination Process
05000458/FIN-2009004-02Failure to Control Scaffold Construction
05000458/FIN-2009004-03Failure to Maintain Reactor Core Isolation Cooling System Seismic Design
05000458/FIN-2009004-04Failure to Ensure Standby Liquid Control System Test Tank Remained Drained
05000458/FIN-2009005-01Main Steam Line Plus Seal Failure Results in Loss of Reactor Cavity InventorySignificance Determination Process
05000458/FIN-2009005-02Failure to Ensure the Emergency Contact had Knowledge About a Shipment
05000458/FIN-2009005-03Licensee-Identified ViolationSubstantial potential for an overexposure
05000458/FIN-2009006-01Failure to Promptly Correct a Condition Adverse to QualityCondition Adverse to Quality
Significance Determination Process
05000458/FIN-2009008-01Inadequate Operability Determinations for a Degraded Diesel Exhaust Pipe
05000458/FIN-2009008-02Licensee-Identified Violation
05000458/FIN-2009402-01Security
05000458/FIN-2010002-01Failure to Evaluate a Revised Equipment Tag Out
05000458/FIN-2010002-02Failure to Verify Control Building Chiller Operability During Low Service Water Temperatures
05000458/FIN-2010002-03Failure to Adequately Verify a Suitable Replacement Part Essential for Emergency Diesel Generator OperationMission time
05000458/FIN-2010003-01Inadequate Risk Assessment for High Pressure Core Spray Pump Room Unit Cooler MaintenanceSignificance Determination Process
Incremental Core Damage Probability Deficit
05000458/FIN-2010003-02Inadequate Procedure Results in Loss of Offsite Power to a 4160 Vac Safety Bus
05000458/FIN-2010003-03Failure to Follow Radiation Work Permit InstructionsHigh Radiation Area
Significance Determination Process
Substantial potential for overexposure
05000458/FIN-2010003-04Licensee-Identified Violation
05000458/FIN-2010004-01Failure to provide adequate decommissioning funding assurance from Dec. 31, 2008 through the present (10 CFR 50.75(b))
05000458/FIN-2010004-02Failure to provide complete and accurate information by failing to disclose its reliance on a contract in the March 2009 funds status report (10 CFR 50.75(f)(1) and 10 CFR 50.9)