ML17213B268

From kanterella
Revision as of 17:32, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 1 to Administrative Procedure 0520025, Process Control Program.
ML17213B268
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/08/1983
From: BARROW J H, WETHY C M
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17213B266 List:
References
0520025, 520025, NUDOCS 8304200229
Download: ML17213B268 (4)


Text

FLORIDAPOWER6LIGHTCOMPANYST.LUCIEPLANTADMINISTRATIVE PROCEDURE NO~0520025.REVISION11.0Title:ProcessControlProgram2.0ReviewAndAroyal:ReviewedbyFacilityReviewGroupApprovedbyJ.H.Barrow(for)December281982PlantManagerDecember281982Revision1ReviewedbyFRGApproveaby3'.0~Scoe:PlantManagerMarch11983-19PQ3;1PurposeTheSt.LuciePlantProcessControlProgram(PCP)implements requirements oftheSt.LuciePlantUnit)Technical Specifications andtheSt.LuciePlantUnit2Technical Specifications.

ThePCPappliestothedewatering ofradioactive beadresinsfordisposalatalowlevelradioactive wastedisposalsite.3.2Discussion ThePCPcontainsprovisions toassurethatdewatering ofbeadresinsresultsinawasteformwithcharacteristics thatmeettherequirements of10CFR61asimplemented by10CFR20andofthelowlevelradioactive wastedisposalsite.TheProcessControlProgramincludesinadditiontothisprocedure thefollowing relatedprocedures:

321St.LuciePlantOperating Procedure No.0520023,"Dewatering Radioactive BeadResins".32.2CHEM"NUCLEAR SYSTEMS,INC.Testprocedure forDewatering ConicalBottomDemineralizers andResinLiners-Project.No.11038,10/05/81.

3.23CHEM-NUCLEAR SYSTEMS,INC.LabRecordSheetforConicalBottomDemineralizers andResinLiners-Pro)ectNo.11038;10/01/81.

8304200229 8304i3PDRADOCK05000335PPDR ST~LUCIEPLANTADMINISTRATIVE PROCEDURE NO.0520025~REVISIO'N 1PROCESSCONTROLPROGRAM3.0~3coe:(continued) 3.3Authority Theauthority andresponsibility toperformtherequirements ofthisprocedure comefrom10CFR20,10CFR61,St.LuciePlantUnit1Technical Specifications, St.LuciePlantUnit2Technical Specifications, andfromdisposalsitecriteria.

3.4Definitions fromafinaldisposalpackagewhichcontainsradioactive beadresins.3.4.2"FreeStandin"Water-Liquidwhichisnotretainedbythewasteform.3.4.3ProcessControlProram(PCP)-TheProcessControlProgramshallcontaintheprovisions, basedonfullscaletesting,toassurethatdewatering ofradioactive beadresinsresultsinawasteformwiththeproperties thatmeettherequirements of10CFR61(asimplemented by10CFR20)andofthelowlevelradioactive wastedisposalsiteatthetimeofdisposal.

3.4.4VisualInsection-Thedirectobservation ofthebeadresinsduringtheentireperiodofresintransferastheyarepackagedinthefinaldisposalcontainer.

4.0 Precautions

4.1ProcessControlProcedures used.forthedewatering ofradioactive beadresinsthatestablish theconditions thatmustbemetshallbebasedonfullscaletesting.Thisistoprovidereasonable assurance thatthedewatering oftheresinanddisposalcontainer willresultinvolumesoffreestandingwater,atthetimeofdisposal, withinthelimitsof10CFR,Part61asimplemented by10CFR20andofthelowlevelradioactive wastedisposalsite.4.2Inlieuofdewatering performed aspertheProcessControlProcedures, avisualinspection ofthebeadresinasitistransferred andofthefinaldisposalcontainer afterloadingmaybeperformed ifconditions permit.Thisinspection mustbeconducted inamannerthatwillassurethatthefreestandingliquidswillmeetshipping, transportation anddisposalsiterequirements.

4.3AllchangestotheSt.LuciePlantProcessControlProgrammustbereviewedandapprovedbytheFacilityReviewGroup.beforetheybecomeeffective.

ST.LUCIEPLANTADMINISTRATIVE PROCEDURE NO~0520025,REVISION1PROCESSCONTROLPROGRAM'.0 Precautions:

(continued) 4.4AllchangestotheSt.LuciePlantProcessControlProgrammustbesubmitted totheNRCintheSemiannual Radioactioe EffluentReleaseReportfortheperiodinwhichthechange(s) wasmade.Thissubmittal mustcontainthefollowing:

4.4.14.4.24.4,3Sufficiently detailedinformation tototallysupporttherationale forthechangewithoutbenefitofadditional orsupplemental information.

Adetermination thatthechangedidnotreducetheoverallconformance ofthedewatered beadresinstoexistingcriteriaforsolidwastes.Documentation ofthefactthatthechangehasbeenreviewedandfoundacceptable bytheFacilityReviewGroup.5.0Resonsibilities:

5.1Itistheresponsibility ofthePlantManagertoassurethatallnecessary procedures, equipment andsupportareprovidedtoproperlyimplement thePCP.5.2Itistheresponsibility oftheHealthPhysicsSupervisor orhisdesigneetoassurethattheradioactive beadresinwillbedewatered inaccordance withthePCP.6.0

References:

61Dewatering Procedure forCNSIConical-Bottom EnviroSAFE HighIntegrity Containers (containing bead-type ionexchangeresin)1Xfreestandingwater-FOMPW036.2,LabRecordSheetforConicalBottomDemineralizers andResinLiners,ProspectNo.110386.3TestProcedure forDewatering ConicalBottomDemineralizers andResinLiners~Pro)ectNo.110387.0RecordsandNotifications:

7.1RecordsshallbeasperSt.LuciePlantOperating Procedure No.0520023,"Dewatering Radioactive BeadResins".7.2Notifications 7.2.1Ifitissuspected thatthefreestandingwater'equirements maynotbem'etforanycontainer ofradioactive beadresinshippedtoadisposalsitenotifythePlantManagerandtheHealthPhysicsSupervisor.

7.2.2Iftheprocesscontrolprocedures havenotbeenfollowedoriffreestandingwatermaybepresentinthefinalshippingcontainer ofbeadresininamountsgreaterthanallowedbyregulations notifytheHealthPhysicsSupervisor orhisdesignee.

ST~LUCIEPLANTADMI'NISTRATIVE PROCEDURE NO.0520025,REVISION1PROCESSCONTROLPROGRAMb.0Instructions:

8.1Disposeofdewatered radioactive beadresinsislimitedtothefollowing containers forwhichfullscaledewatering testhavebeenconducted:

8.1.1CNSIConicalBottomEnviroSAFEŽ HighIntegrity Container'-

PL6-80CR.

8.1.2CNSIConicalBottomEnviroSAFEŽ HighIntegrity Container-PL14-195CR-8.2Dewaterthecontainer asperSt.LuciePlantOperating Procedure No.0520023,"Dewatering ofRadioactive BeadResins".8.3Inlieuofdewatering, radioactive beadresinmaybeshippedfordisposal, inadifferent container, providedtheradiological andregulatory conditions permit,ifavisualinspection oftheresinduringtransfer, andoffinalshippingcontainer afterloading,canbeconducted inamannerthatwillassurethatthefreestandingliquidvolumepresentwillmeetshipping, transportation anddisposalsiterequirements.

8.4Withdewatering notmeetingdisposalsite,shippingandtransportation requirements, suspendshipmentoftheinadequately dewatered bead'resinandcorrecttheprocesscontrolprogram,theapplicable procedures(s) and/orthedewatering system'snecessary topreventrecurrence.

8.5Withdewatering notperformed inaccordance withthePCP:(1)ifthedewatered beadresinhasnotalreadybeenshippedfordisposal, verifyeachcontainer toensurethatitmeetsburialground,shippingandtransportation requirements and/or(2)takeappropriate administrative actiontopreventrecurrence.

8.6Closethecontainer asperthemanufacturer's instructions.