Ile ES-401-9 Written Examination Review Worksheet
ML22199A181
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/05/2022
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Constellation Energy Generation
Baker R
Shared Package
ML20140A267 List:
References
BW220023
Download: ML22199A181 (12)


Text

ES-401 Written Examination Review Worksheet Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 14, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

NOTE 1: Does this question meet the requirements of FAQ 401.55; does it test information 1) from the AOP/EOPs 2) diagnosis of procedures to be used to address Generic Comments the situation 3) progression of an event, OR 4) assessment of integrated plant response to emergency or abnormal situations crossing several plant systems and/or safety functions?

Date Updated: 2/18/202 2 NOTE 2: Does this question meet the requirements of FAQ 401.44; does it test plant-wide generic information (not become an extension of Tier 2) per Tier 3 objectives.

NOTE 3: For SRO-only questions, select K/As tied to 10 CFR 55.43.

NRC: 2018 NRC Exam - Q-39. Reference Provided - Stem embedded Image of Bypass Permissive Lights at 1PM05J. See NOTE 1: - Link to (3).

1 H 3 B S Response: Technical reference revision updated (Rev 4) and added Grid Locations for the Permissive Lights to the distractors.

Question is SAT as written.

Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 (easy) to 5 (difficult); questions with a difficulty between 2 and 4 are acceptable.
3. Check the appropriate box if a psychometric flaw is identified:
  • Stem Focus: The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
  • Cues: The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length).
  • T/F: The answer choices are a collection of unrelated true/false statements.
  • Cred. Dist.: The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
  • Partial: One or more distractors are partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • Job Link: The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
  • Minutia: The question requires the recall of knowledge that is too specific for the closed-reference test mode (i.e., it is not required to be known from memory).
  • #/Units: The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
  • Backward: The question requires reverse logic or application compared to the job requirements.
5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only. (K/A and license-level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Verify that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewers judgment, is the question, as written, (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any U status ratings (e.g., how the Appendix B psychometric attributes are not being met).

Page 1 of 12 ES-401 2 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

NRC: See NOTE 1: - Link to (1).

2 H 2 N S Reference Provided - Image of 1PM05J PORV and Block Valve control switches and VPI embedded in stem

Response: Question is SAT as written.

NRC: See NOTE 1: - Link to (3).

3 H 3 N E Response: Added LP Task # and updated nomenclature in distractors.

S Question is SAT with above change made.

4 H 2 B S NRC: See NOTE 1: - Link to (1).

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (1).

Specific component information was added to the stem since step 3 of 1BwCA-0.0, 5 F 2 X N E Attachment B has multiple parts. One of those parts would result in Distractor D S being a correct answer so additional clarifying information was added.

Response : Question is SAT with above change made.

NRC: See NOTE 1: - Link to (3).

Component Noun Valve Names and EPNs added to Distractors A and B for 6 H 2 B E 1RH8708A and 1SI8856A.

S 2020 NRC Exam - Q -5 (Previous 2 exams)

Response: Question is SAT with the above changes made.

NRC: 2014 Byron NRC Exam - Q06. See NOTE 1: - Link to (3).

This question was updated for the Ovation Modification and was modified to test 7 H 3 X M U which loop for the OTDT recorder would be selected to address the S SIMULTANEOUS failure of 1PT-455 and 1PT-457.

Response : The question is now SAT after the above changes were made.

NRC: See NOTE 1: - Link to (2).

8 H 2 N E Lowered initial reactor power and reworded question and answers to test which procedure would be utilized or transitioned to address adverse conditions in stem.

S Response : Question is SAT with above changes made.

9 F 2 N S NRC: See NOTE 1: - Link to (1).

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (2).

10 H 2 M E Initial 1B SG pressure lowered in the stem to ensure it is clear that the SG should be S depressurized at the time the applicant is asked to assess loop DT.

Page 2 of 12

ES-401 3 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

Modified from 2020 cert exam Q-57

Response: Question is SAT after above change was made.

NRC: 2011 NRC Exam - Q-11. See NOTE 1: - Link to (1).

11 F 2 B S Response: Clarified nomenclature for answer explanation.

Question is SAT as written.

NRC: See NOTE 1: - Link to (3).

12 F 2 X N U Distractors B and C were initially subsets of correct Answer A. Distractors have been modified to make them plausible but incorrect and not a subset of Answer A.

S Response : Question is SAT with above changes made.

NRC: See NOTE 1: - Link to (3).

13 F 2 B E Minor rewording of answer choices for greater clarity.

2014 Byron NRC Exam - Q -12 S

Response : Question is SAT with above changes made.

NRC: See NOTE 1: - Link to (3).

14 H 2 M S Modified from 2011 NRC Exam - Q -14

Response : Question is SAT as written NRC: See NOTE 1: - Link to (3).

15 H 3 B E Updated answer explanation for Ovation Mod response and updated the applicable learning objective.

S Response : Question is SAT with above changes made.

16 F 2 B S NRC: 2019 Byron NRC Exam - Q-17. See NOTE 1: - Link to (2).

Response : Question is SAT as written.

17 F 2 N S NRC: See NOTE 1: - Link to (1).

Response : Question is SAT as written.

18 F 2 B S NRC: See NOTE 1: - Link to (1).

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (3).

Distractor C and Answer D were changed ton include the word ALL versus ONLY 19 H 3 X B E as the failure of a lift coil fuse will affect only 1 RCCA in a group of rods in Control S Bank D. This makes the answer choices operationally valid.

Response : Question is SAT with the above made changes.

Page 3 of 12

ES-401 4 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

NRC: See NOTE 1: - Link to (1).

20 H 3 X X N U Response: Based on recent major procedurally driven operator response to the S given event, the question was replaced by the facility.

Question is SAT with the above made changes.

NRC: See NOTE 1: - Link to (1 and 3). Reference Provided - Image of 1PM07J N35 instrument drawer indications embedded in the stem. Modified from 2016 NRC Exam - Q -8 21 H 3 X M E Part two of the 2X2 was modified to more align with the KA to know the reason for a S plant response to a loss of an IRNI.

Response : Question is S AT with above changes made.

NRC: See NOTE 1: - Link to (3).

22 H 3 B S 2013 NRC Exam - Q -73

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (3).

Added information in the stem to increase the operational validity of the question.

23 H 3 N E Specifically, a temporary resin liner was identified as the leaking source and a S specific activity from a defined tank was called out when the leak occurred.

Response : Question is SAT with the above changes made.

NRC: See NOTE 1: - Link to (3).

Question stem and answers modified to address the status of the main generator 24 H 2 B E instead of the reactor to more align with the conditions in the question stem presented.

S 2012 Byron NRC Exam - Q -25 Response : Question is SAT with the above changes made.

25 H 2 B S NRC: See NOTE 1: - Link to (3).

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (1).

26 F 2 M E Changed reference to the Chemistry procedure to TS 3.4.16 in the question stem for operational validity.

S Response : Question is SAT with the above change made.

NRC: See NOTE 1: - Link to (1).

27 H 2 X N E Question was rewritten to focus on the mitigating strategy of 1BwFR -P.1 to better align with the KA statement.

S Response : Question is SAT with the above changes made.

Page 4 of 12

ES-401 5 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

NRC: Formatting changes to the question stem were made and clarification that the 28 H 2 N E phrase other SGs meant 1A -1C SGs was added to the stem.

S Response: Question is SAT with the above changes made.

NRC: None.

29 F 2 N S Response: Question is SAT as written.

NRC: 2014 NRC Exam - Q-13.

30 H 3 B S Corrected distractor D for consistent grammar.

Response: Question is SAT with above changes made.

NRC: 2011 NRC Exam - Q-31.

31 H 3 B S Updated stem condition to allow for the response time of the controller DEMAND signal.

Response: Question is SAT with the above changes made.

32 F 3 B E NRC: Additional verbiage added to stem to account for Ovation modification.

S Response: Question is SAT with the above changes made.

NRC: Initial RCS pressure was lowered to make more operationally valid and minor 33 H 2 B E editorial changes were made to the stem.

2010 South Texas Project NRC Exam - Q-46 S

Response: Question is SAT with above changes made.

34 H 3 B S NRC: 2018 NRC Exam - Q-06.

Response: Question is SAT as written.

NRC: Stem corrected to indicate Unit 2 conditions.

35 H 3 B E 2017 NRC Exam - Q-06 S

Response: Question is SAT with above change made.

NRC: First part of 2x2 was changed to determine which direction crew will change 36 H 3 N E pressurize pressure and Distractor C.

S Response: Question SAT with above change made.

37 H 2 B S NRC: None.

Response: Question is SAT as written.

38 H 3 B S NRC: 2012 Byron NRC Exam - Q-35

Response: Question SAT as written.

Page 5 of 12

ES-401 6 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

39 H 2 B S NRC: 2011 NRC Exam - Q-54

Response: Question is SAT as written.

40 F 3 B S NRC: 2018 NRC Exam - Q14

Response: Question is SAT as written.

NRC: 2019 NRC Exam - Q-25 (Previous 2 exams) 41 F 3 B E Minor editorial changes made in stem.

S Response : Question is SAT with the above changes made.

42 H 3 B S NRC: 2020 NRC Exam - Q-43 (Previous 2 exams)

Response : Question is SAT as written.

NRC: Stem changed to add a specific comment above OPERATOR actions because 43 F 3 X X N E certain EOPs allow for local maintenance manipulation of the MSIVs. Distractor B was also changed to be more operationally valid.

S Response : Question is SAT with the above changes m ade.

44 F 2 B S NRC: None.

Response : Question is SAT as written.

45 H 3 B S NRC: None.

Response : Question is SAT as written.

46 H 3 B E NRC: Distractor C changed to DC Bus 112 for better operational validity.

S Response : Question is SAT with above change made.

NRC: Following licensee recommendation, added plant reference name for the fuel 47 H 3 B E control cylinder to answer choice D.

S Response : Question is SAT with above change made.

48 H 3 B S NRC: 2012 Byron NRC Exam - Q-51

Response : Question is SAT as written.

49 F 2 B S NRC: 2013 NRC Exam - Q-31

Response : Question SAT as written.

NRC: 2019 NRC Exam - Q -51 (Previous 2 exams) 50 F 3 B S Response: Question is SAT as written.

Page 6 of 12

ES-401 7 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

51 F 2 B S NRC: 2011 NRC Exam - Q-52

Response: Question SAT as written.

52 H 3 B S NRC: 2009 NRC Exam

Response: Question is SAT as written.

NRC: 2014 Millstone NRC Exam - Q-53 53 F 3 B E Added initial condition that normal letdown remains in service. Normally by this time in BwGP100- 5, the crew has switched over to RH letdown.

S Response: Question is SAT with above change made.

NRC: Alignment of running VP chillers changed for operational validity. Changed to TRAIN A failure for better operational validity. Part 2 of the 2x2 answers was 54 H 3 X X N E refocused to which procedures will have operator actions to address the fault in the S question stem to better align with the question KA.

Response: Question is SAT with the above changes made.

NRC: Minor editorial change made to stem.

55 H 2 B E 2019 Byron NRC Exam - Q-41 S

Response: Question is SAT with the above change made.

NRC: Replaced reference in stem with image of actual simulator indications for 56 H 3 B E containment pressure. Reference Provided - Image of containment pressure meters from 1PM06J embedded in the question stem.

S Response: Question SAT after above change was made.

NRC: Minor editorial change made to stem.

57 F 2 B E 2009 NRC Exam - Q-32 S

Response: Question is SAT with the above change made.

58 F 2 N E NRC: Minor editorial changes to question stem.

S Response: Question is SAT with above changes made.

59 F 2 N E NRC: Changed Distractors A and B and Answer C to be more operationally valid.

S Response: Question is SAT with above changes made.

NRC: Clarifying information on how MSIVs were attempted to be closed at 1PM05J 60 H 3 B E and 1PM06J was added to the stem.

2011 NRC Exam - Q-61 S

Response: Question is SAT after above changes were made.

Page 7 of 12

ES-401 8 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

61 H 3 B S NRC: 2014 NRC Exam - Q-7

Response: Question is SAT as written.

NRC: Minor change in stem associated with Ovation. Reference Provided - Images 62 H 2 B E of DEHC Screen showing Turbine TV and GV position embedded in stem.

2018 NRC Exam - Q -33 S

Response : Question is SAT with above change made.

NRC: Question pedigree calls out system 073 (process rad monitors) this does not correspond to the written outline which has question 63 aligned to system 068 (liquid radwaste). The question is a match probably for both, but the pedigree page should 63 F 3 X B E be correct ed to match the outline.

S 2016 NRC Exam - Q -28

Response: Question pedigree have been corrected to match the written exam outline.

Question is SAT with the above change made.

64 F 3 N S NRC: None.

Response : Question is SAT as written.

NRC: Added phrase to indicate the check source uses an electrical current instead of 65 F 2 N E a radionuclide to ensure it is clear which aspect of the rad monitor is being tested.

S Response : Question is SAT with the above change made.

66 F 2 B S NRC: None.

Response : Question is SAT as written.

NRC: Added procedure number for Pertinent Information Program to the question 67 F 3 N E stem.

S Response : Question is SAT with the above change made.

NRC: Minor wording added to make Distractor B and Answer D more align with the 68 F 2 X B E example provided in OP -BR-103-102-1002 which is referenced in the question stem.

S Response : Question is SAT with the above changes made.

69 F 3 B S NRC: 2013 Byron NRC Exam - Q-68

Response : Question is SAT as written.

70 F 2 B S NRC: 2021 Byron NRC Exam - Q71

Response : Question is SAT as written.

Page 8 of 12

ES-401 9 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

71 F 2 B S NRC: None.

Response: Question is SAT as written.

72 F 2 B S NRC: 2018 NRC Exam - Q-73

Response: Question is SAT as written.

NRC: Reference Provided - Map of facility with EP Assembly Areas highlighted is 73 F 2 N S embedded in the question stem.

Respons e: Question is SAT as written.

74 F 2 B S NRC: 2016 NRC Exam - Q-73

Response : Question is SAT as written.

75 F 2 B S NRC: 2016 Byron NRC Exam - Q-75

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (1).

76 H 2 N E Removed reference to the reportability manual from the question stem. Also removed Reportability Manual as a reference provided in the question pedigree.

S Response : Question is SAT with the above change made.

NRC: See NOTE 1: - Link to (2).

Question stem was rearranged to improve clarity and operational validity.

77 H 2 X N E Reference Provided - Table A of 1BwOA PRI 10, LOSS OF RH COOLING is S attached to the exam.

Response: Question is SAT with the above changes made.

78 F 2 N S NRC: See NOTE 1: - Link to (1).

Response : Question is SAT as written.

NRC: See NOTE 1: - Link to (2).

79 H 2 N E Editorial changes made to stem to for clarity.

S Response : Question is SAT with the changes made above.

NRC: See NOTE 1: - Link to (2).

80 F 3 B S 2016 NRC Exam - Q -90

Response: Question is SAT as written.

81 H 3 X B U NRC: See NOTE 1: - Link to (1 and 3).

Reference Provided - EP-AA-1001 Addendum 3 Braidwood EAL is attached to the S exam.

Page 9 of 12

ES-401 10 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

Question stem changed to indicate voltage on ESF buses is below immediate low voltage bus trip condition and focus of the question is no longer on TS actions but on system response and EAL classification.

Response: Question is SAT with the above changes made.

NRC: See NOTE 1: - Link to (1).

Removed redaction boxes from curves on 1BwOA SEC-8 Figure showing Maximum 82 H 2 N E and Minimum.

S Reference Provided - Figure 1BwOA SEC-8-1 attached to the exam.

Response: Question is SAT with the above changes made.

NRC: See NOTE 1: - Link to (1).

83 H 2 B S Reference Provided - CY-BR-170-301, ODCM Table 12.2-1 is attached to the exam.

Response: Question is SAT as written.

NRC: See NOTE 1: - Link to (2).

84 H 3 B S 2016 Byron NRC Exam - Q -93

Response : Question is SAT as written.

85 H 3 N S NRC: See NOTE 1: - Link to (2).

Response : Question is SAT as written.

NRC: Removed the phrase and tag from the stem to increase the discriminating 86 F 2 M E nature of the question.

Modified from 2021 Byron NRC Exam Q35 -

S Response : Question is SAT with above change made.

NRC: None.

87 H 4 N S Response: Question is SAT as written.

NRC: 2010 DC Cook NRC Exam - Q -92 88 H 3 B S Reference Provided - Technical Specification 1.3 Completion Times and Technical Specification 3.7.5 attached to the exam.

Response: Question is SAT as written.

89 H 3 N S NRC: Reference Provided - Technical Specification 3.8.1 is attached to the exam.

Response : Question is SAT as written.

90 H 3 B S NRC: None.

Response : Question is SAT as written.

Page 10 of 12

ES-401 11 Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 11, 2022

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD Stem Cues T/F Cred. Partial Job-Minutia #/ Back-Q= SRO (F/H) (1-5) Focus Dist. Link units ward K/A Only B/M/N U/E/S Explanation

NRC: 2019 Byron NRC Exam - Q-91 91 H 3 B S Reference Provided - Technical Specification 3.1.7 is attached to the exam.

Response: Question is SAT as written.

92 F 3 B E NRC: Minor editorial changes made to stem.

S Response: Question is SAT with the above changes made.

NRC: Additional information about the status of the U2 Station Air Compressors 93 H 3 X B E added to the stem to address a plant modification.

2013 NRC Exam - Q-81 S

Response: Question is SAT with above change made.

94 F 2 B S NRC: 2016 Byron NRC Exam - Q95

Response: Question is SAT as written.

95 H 3 B S NRC: 2014 NRC Exam - Q-95

Response: Question is SAT as written.

96 F 2 B S NRC: 2021 Byron NRC Exam - Q-97

Response: Question is SAT as written.

97 F 2 B S NRC: 2014 NRC Exam - Q-84

Response: Question is SAT as written.

98 F 3 B S NRC: None.

Response: Question is SAT as written.

99 H 3 B S NRC: 2014 NRC Exam - Q-98

Response: Question is SAT as written.

100 F 2 B S NRC: 2016 NRC Exam - Q-100

Response: Question is SAT as written.

Page 11 of 12

ES-401 Written Examination Review Worksheet Form ES-401-9

Facility: Braidwood Station, Units 1 and 2 Exam Date: March 7 - 14, 2022

B= 49 F= 35 E= 35 RO TOTALS: M= 5 H= 40 U= 3 Additional Notes:

N= 21 (9 H)

B= 15 F= 9 E= 7 SRO TOTALS: M= 2 H= 16 U= 1 Additional Notes:

N= 8 (7 H)

GENERAL COMMENT

S:

1. Bank questions are indicated by B; Modified are indicated by M; New questions are indicated by N
2. Questions from the previous 2 NRC Exams: __4 __ (RO)/ __ 0__ (SRO)
3. Average difficulty is __ 2.47 __ on the RO exam and __ 2.56 __ on the SRO exam.
4. The answer distribution is:

RO / SRO A = 19/ 6 B = 18/ 6 C = 1 7 / 8 D = 2 1 / 5

5. There are __6 __ (RO)/ __ 7__ (SRO) questions with references/ attachments provided. The Chief Examiner has assessed the number of questions and the type of references provided and determined that as a whole they do not adversely impact the level of difficulty of the exam nor do they provide d information for questions they were not intended for.
6. This exam was NRC-developed for qualification of 2 trainees and the E & U annotations were retained strictly for training purposes.

Page 12 of 12