ML23107A024

From kanterella
Revision as of 11:38, 22 May 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
6 to Updated Final Safety Analysis Report, Chapter 15, Figures
ML23107A024
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/31/2023
From:
Holtec Decommissioning International
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23107A065 List: ... further results
References
HDI PNP 2023-002
Download: ML23107A024 (2)


Text

DSAR CHAPTER 15 - QUALITY ASSURANCE PROGRAM FIGURE 15-1 Revision 36 QUALITY ASSURANCE ORGANIZATION CONSUMERS POW ER COMPANY BECHTEL BECHTEL PROJECT PROJECT ENGINEER SUPERINTENDENT SAN FRANCISCO BECHTEL QUALITY JOB CONSTRUCTION ENGINEERING SHOP ASSURANCE ENGINEER SUPERINTENDENT GROUP SUPV INSPECTORS ENGINEER MATERIALS FIELD CRAFT ENGINEERS TESTING ENGINEERS SUPERINTENDENTS LABORATORIES INSPECTION

DSAR CHAPTER 15 - QUALITY ASSURANCE PROGRAM FIGURE 15-2 Revision 36 COMBUSTION ENGINEERING INCORPORATED QUALITY ASSURANCE ORGANIZATION CORPORATION VICE PRESIDENT UTILITY DIVISION DIRECTOR OF PRESIDENT DIRECTOR VICE PRESIDENT MANUFACTURING PF AVERY CO MANUFACTURING NUCLEAR STEAM UTILITY DIVISION SERVICES GENERATING SYSTEM DIRECTOR NUCLEAR MANAGER DIRECTOR COMPONENT DEPT QUALITY NUCLEAR POWER CHATTANOOGA CONTROL DEPARTMENT MANAGER OF PFA CO MANAGER CE MANUFACTURING QUALITY CONTROL VENDORS MANAGER NCD MANAGER NPD ASSISTANT DIRECTOR ASSISTANT DIRECTOR ENGINEERING QUALITY QUALITY CONTROL NUCLEAR LABS PW R CONTROL REPRESENTATIVE MANUFACTURING ENGINEERING MANAGER MANAGER PROJECT MANUFACTURING MANUFACTURING MANAGER W INDSOR PALISADES NPD MANAGER QUALITY CONTROL NUCLEAR REPRESENTATIVE LABORATORIES NCD MANAGER QUALITY CONTROL QC SURVEILLANCE QC INSPECTION SUPERVISION