MONTHYEARCPSES-201001000, Operator Licensing Examination Data, Form 5362010-07-28028 July 2010 Operator Licensing Examination Data, Form 536 CPSES-200901377, Operator Licensing Examination Data2009-09-29029 September 2009 Operator Licensing Examination Data CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.2007-11-15015 November 2007 Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-10-22022 October 2007 Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0909 October 2007 Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0202 October 2007 Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data2007-08-29029 August 2007 Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)2007-08-22022 August 2007 Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20082007-08-0303 August 2007 Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 CPSES-200701284, (Cpses), Operator Licensing Examination Data2007-08-0202 August 2007 (Cpses), Operator Licensing Examination Data CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 72007-07-20020 July 2007 Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-07-18018 July 2007 Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)2007-07-17017 July 2007 Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-06-21021 June 2007 Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-0092007-06-19019 June 2007 (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 CPSES-200701059, Submittal of Startup Report, Cycle 132007-06-13013 June 2007 Submittal of Startup Report, Cycle 13 CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves2007-05-22022 May 2007 License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability2007-05-0707 May 2007 Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report2007-04-30030 April 2007 Transmittal of Year 2006 Radioactive Effluent Release Report CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change2007-04-18018 April 2007 Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700691, Core Operating Limits Report, Cycle 132007-04-0404 April 2007 Core Operating Limits Report, Cycle 13 CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 20062007-03-30030 March 2007 Transmittal of the Annual Radiological Environmental Operating Report for 2006 CPSES-200700607, Property Damage Insurance2007-03-29029 March 2007 Property Damage Insurance CPSES-200700606, Decommissioning Report2007-03-29029 March 2007 Decommissioning Report CPSES-200700573, Request to Withdraw Relief Request A-72007-03-22022 March 2007 Request to Withdraw Relief Request A-7 CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)2007-03-19019 March 2007 Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-03-0909 March 2007 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data2007-02-28028 February 2007 Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports2007-02-22022 February 2007 Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)2007-02-22022 February 2007 Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2007-02-0202 February 2007 Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-01-30030 January 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2007-01-29029 January 2007 Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)2007-01-24024 January 2007 Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-01-18018 January 2007 License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature2007-01-10010 January 2007 Annual Report of Changes in Peak Cladding Temperature CPSES-200602341, License Amendment Request (LAR) 06-006, Revision to Technical Specification (TS) 5.5.8, Inservice Testing Program2006-12-19019 December 2006 License Amendment Request (LAR) 06-006, Revision to Technical Specification (TS) 5.5.8, Inservice Testing Program CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.2006-12-19019 December 2006 License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. 2010-07-28
[Table view] |
Text
Thxu Power TXU Power Mike Blevins Comanche Peak Steam Senior Vice President &
Eectric Station Chief Nuclear Officer P.O. Box lo12 (EO1)
Glen Rose, TX 76043 Ref: #10CFR50.55a Tel: 254 897 5209 Faxc 254 897 6652 mike.blevins~twu.com CPSES-200502480 Log # TXX-05204 December 15, 2005 U. S. Nuclear Regulatory Cormmission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-446 RELIEF REQUEST A-1 FOR THE UNIT 2 INSERVICE INSPECTION FOR APPLICATION OF AN ALTERNATIVE TO THE ASME BOILER AND PRESSURE VESSEL CODE SECTION XI EXAMINATION REQUIREMENTS FOR CLASS 1 AND 2 PIPING WELDS (INTERVAL START DATE - AUGUST 3,2004, SECOND INTERVAL)
REF: TXX-01026 dated February 15, 2001, from C. L. Terry to the NRC Gentlemen:
In accordance with the provisions of 10 CFR 50.55a(a)(3)(i), TXU Generation Company LP (hereafter TXU Power) requests relief from the ASME Section XI code examination requirements for inservice inspection of Class 1 and 2 piping welds (Categories B-F, B-J, C-F-1, and C-F-2) for Comanche Peak Steam Electric Station (CPSES) Unit 2.
The CPSES risk-informed inservice inspection (RI-ISI) program plan was submitted via the referenced letter for Unit 1 Second Interval and Unit 2 First Interval. As an alternative to the code requirements a risk-informed process will continue to be used for selection of Class I and Class 2 piping welds for examination for the Second Interval of Unit 2.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
TXX-05204 Page 2 of 2 TXU Power requests NRC approval of this relief request by June 30, 2006 to support the CPSES Unit 2 refueling outage 2RF09 which is currently scheduled to begin October 2006.
Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.
Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: ) 1 X
/ W. Madden Director, Regulatory Affairs JCH Attachment c - B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES T. Parks, Chief Inspector, TDLR
Attachment to TXX-05204 Page 1 of 6 TXU Power Comanche Peak Steam Electric Station (CPSES) Unit 2 Second 10-Year Interval 10CFR50.55a Request Number A-1 Proposed Alternative In Accordance with 10CFR50.55a(a)(3)(i)
Alternative Provides Acceptable Level of Quality and Safety
- 1. ASME Code Components Affected All Code Class 1 and 2 piping welds previously subject to the requirements of ASME Section XI, Table IWB-2500-1 (Examination Categories B-F and B-J) and Table IWC-2500-1 (Examination Categories C-F-I and C-F-2).
- 2. Applicable Code and Edition The CPSES Unit 2 ISI program is based on the 1998 Edition of ASME Section XI with the 2000 Addenda.
- 3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-F and Category B-J Table IWC-2500-1, Examination Category C-F-1 and Category C-F-2
- 4. Reason For Request The continued use of a risk-informed process as an alternative for the selection of Class 1 and Class 2 Piping Welds for examination is requested for the Second Interval of Unit 2.
- 5. Proposed Alternative and Basis for Use As an alternative'to the Code Requirement, a Risk-Informed process will continue to be used for selection of Class 1 and Class 2 Piping Welds for examination.
The Unit 2 ISI program for the examination of Class 1 and Class 2 piping welds is currently in accordance with a risk-informed process developed based on EPRI TR-1 12657, Revision B-A ,with identified differences, and with additional guidance taken from ASME Code Case N-578. A request to utilize this process was submitted on February 15, 2001. The NRC approved this request on September 28, 2001 (TAC Nos. MB1201 and MB1202). In the original submittal, TXU Electric committed to review and adjust the risk ranking of piping segments as a minimum on an ASME period basis. The first period of implementation of the RI-ISI program was the third period of Interval 1, which ended August 2, 2004. To satisfy the periodic review requirements, an evaluation and update was performed in accordance with the Nuclear Energy Institute document 04-05, "Living Program Guidance
Attachment to TXX-05204 Page 2 of 6 TXU Power Comanche Peak Steam Electric Station (CPSES) Unit 2 Second 10-Year Interval 10CFR50.55a Request Number A-1 (continued)
Proposed Alternative In Accordance with 10CFR50.55a(a)(3)(i)
Alternative Provides Acceptable Level of Quality and Safety To Maintain Risk-Informed Inservice Inspection Programs For Nuclear Plant Piping Systems", published in April, 2004.
In accordance with NEI 04-05, the following aspects were considered during the review:
- Plant Examination Results
-Plant Specific Failures
-Industry Failures
-Physical Changes
-Programmatic Changes
-Procedural Changes
- Changes in Postulated Conditions
-Physical Conditions
-Programmatic Conditions The updated program resulting from this review is the subject of this proposed alternative.
In accordance with the guidance provided by NEI 04-05, Table 1 is provided identifying the number of welds added to and deleted from the originally approved RI-ISI program. The additions to the original program are attributable to two specific actions:
- 1) An update to the PRA was performed at the end of 2004. Although the revision to the PRA model occurred after the end of the Interval, it was decided to include the revision in this evaluation and update. Consequence segments I-SIOl, 1-ACC03A, l-ACC03B, I-RHR08A, l-FW-03A, 1-FW-03B, 1-FW-03C, and 1-FW-03D changed consequence rank from Medium to High. As a result of this change, fourteen piping segments changed from a risk rank of Low to a risk rank of Medium.
- 2) During the first ISI interval, the ISI Program was based on the 1986 Edition of ASME Section XI. For the second ISI interval, the ISI Program is in accordance
Attachment to TXX-05204 Page 3 of 6 TXU Power Comanche Peak Steam Electric Station (CPSES) Unit 2 Second 10-Year Interval 10CFR50.55a Request Number A-1 (continued)
Proposed Alternative In Accordance with 10CFR50.55a(a)(3)(i)
Alternative Provides Acceptable Level of Quality and Safety with the 1998 Edition through 2000 Addenda of ASME Section XI. One of the changes in the new edition and addenda of the Code is that the exemption size for Class 2 auxiliary feedwater piping decreased from 4" NPS to 1V2" NPS. As a result, the 4" NPS Class 2 auxiliary feedwater lines from the outboard isolation valves to where they connect to the four main feedwater lines were added to the ISI Program and consequently added to the RI-ISI Program.
A new Risk Impact Analysis was performed, and the revised program continues to represent a risk reduction when compared to the last deterministic Section XI inspection program.
The original program represented a reduction of 9.73E-09 in regards to CDF and 3.91E-09 in regards to LERF, while the revised program represents a reduction of 6.9 1E-09 in regards to CDF and 4.26E-09 in regards to LERF. The smaller reduction in CDF is due primarily to a decreased Upper Bound CDF in the revised PRA. The previous value was 1.16E-02, while the revised value is 7.52E-03.
The Risk-Informed process continues to provide an adequate level of quality and safety for selection of the Class 1 and Class 2 Piping Welds for examination. Therefore, pursuant to IOCFR50.55a(a)(3)(i) it is requested that the proposed alternative be authorized.
- 6. Durationof Proposed Alternative The alternative will be used for CPSES Unit 2 until the end of that unit's second ten-year ISI program inspection interval, subject to the review and update guidance of NEI 04-05.
The second inspection interval is currently scheduled to end August, 2014.
- 7. Precedent
- 1) Comanche Peak Units 1 and 2 (Reference SER dated September 28, 2001, TAC Nos. MB1201 and MB 1202)
Attachment to TXX-05204 Page 4 of 6 Table 1 CPSES Unit 2 - Inspection Location Selection Comparison Between Original Approved and Revised RI-ISI Program by Risk Category Rink aiueoriginal Updated
__to 1 _____Consequence Potential Code ________ l_ Updated ste Rank Category weld () Wl 2 Category Rank MDS Rank Cotgor RI-ISI Otht Other°) Weld 2 cutCount R-II Ohr RCS 2 High High TASCS, Medium B-J 6 2 6 2 RCS 2 High High TASCS Medium B-J 13 6(3) 13 6(3)
B-F 1 0 1 0 RCS 2 High High TT Medium B-J 11* 1 11 1 B-F 20 14(4) 20 14(4)
RCS 4 Medium High None Low B-J 193 26 193 26(5 RCS 5 Medium Medium TASCS Medium B-J 19 2 19 2 RCS 5 Medium Medium TT Medium B-J 40** 5 40 5 RCS 6 Low Medium None Low B-J 50 0 50 0 RCS 7 Low Low None Low B-J 15 0 15 0 CVCS 5 Medium Medium TT Medium B-J 1 1 1 1 B-J 60 0 60 0 CVCS 6 Low Medium None Low C-F-1 213 0 213 0 CVCS 6 Low Low 'TT Medium B-J 8 0 8 0 CVCS 7 Low Low None Low B-J 42 0 42 0 B-J 85 7 85 7 SIS 4 Medium High None Low C-F-1 99 11 241 26 SIS 5 Medium IGSCC Medium B-J 12 2 12 2 Typographical errors in Original: *6 should have been 11, **45 should have been 40; no impact on results.
Attachment to TXX-05204 Page 5 of 6 Table 1 (Cont'd)
CPSES Unit 2 - Inspection Location Selection Comparison Between Original Approved and Revised RI-ISX Program by Risk Category Risk Failure original updated Syst _(u} Ri k Consequence Potential Code ________ = =
_______ -
Category Rank 2 DmW Rank Category Weld RI-ISI Other Weld I-8 Other Count Count B-J 82 0 82 0 SIS 6 Low Medium None Low C-F-1 598 0 456 0 SIS 6 Low Low IGSCC Medium B-J 20 0 20 0 B-J 126 0 126 0 SIS 7 Low Low None Low
_ _ . . C-F-1 104 0 104 0 B-J 12 1 12 1 RHRS 4 Medium High None Low C-F-1 246 25 246 25 RHRS 6 Low Medium None Low C-F-1 5 0 5 0 CSS 4 Medium High None Low C-F-1 11 2 11 2 CSS 6 Low Medium None Low C-F-1 178 0 178 0 CSS 7 Low Low None Low C-F-1 239 0 239 0 FWS_________
4 (1) Meium (High)
High None (FAC)
L (High)____
C-F-2 0 0 112 12 FWS 5 (3) M(Hdigh) Medium T(ASCS) M(High) C-F-2 8 1 8 1 FWS 6 (3) Low Medium None) C-F-2 442 0 330 0 MSS(High) Me(FAC)
Medium None (High)
LCF1767 MSS 6 Low Medium None Low IC-F-2 167 0 167 1 0
Attachment to TXX-05204 Page 6 of 6 Table 1 (Cont'd)
CPSES Unit 2 - Inspection Location Selection Comparison Between
_ _ Original Approved and Revised RI-ISI Program by Risk Category Risk Failure original Updated system' 1 3 Consequence n i lCode t _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2 t Category Rank DMs Rank Category oulnd RX-181 Other Woulndt RI-ISI Other° AFW____(igh Medi High High__ __
Nn (FAC) Low o(6w (High) C-F-2 C________
) 81 9=
Notes
- 1. Systems were described in Table 3.1-2 of the original submittal, with the exception of AFW - Auxiliary Feedwater. This ASME Code Class 2 system consists of 4 segments with 81 elements.
- 2. The column labeled bother' is generally used to identify augmented inspection program locations that are credited beyond those locations selected per the RI-ISI process, as addressed in Section 3.6.5 of EPRI TR-112657. This option was not applicable for the CPSES RI-ISI application. The Mother" column has been retained in this table solely for uniformity purposes with other RI-ISI application template submittals.
- 3. 2 of these 6 welds were added to address the Class 1 selection percentage criteria described in Section 3.6.4.2 of EPRI TR-112657, See Section 3.5 of the original submittal for details.
- 4. 7 of these 14 welds were added to address the Class 1 selection percentage criteria described in Section 3.6.4.2 of EPRI TR-112657. See Section 3.5 of the original submittal for details.
- 5. 11 of these 26 welds were added to address the Class 1 selection percentage criteria described in Section 3.6.4.2 of EPRI TR-112657. See Section 3.5 of the original submittal for details.
- 6. Due to a change in ASME Section XI Code criteria, 4" NPS Class 2 auxiliary feedwater piping was added to the ISI Program, and therefore the RI-ISI Program, for the first time during the third ISI interval. As such, there were no welds associated with this piping during the original RI-ISI application.