Category:CONTRACTED REPORT - RTA
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:QUICK LOOK
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:RESEARCH AND TECHNICAL ASSISTANCE REPORTS
MONTHYEARML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept 1982-07-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] |
Text
r .. n.<.
,y . ., c.; n : . .- s r. 3 ~ r.~+.. .
~ - -
~ .ra ~ ' v - . . .
..-ers'. ~
l l
w S. m EGG-FA-5338 January 1981 ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM
, VOLTAGES, CRYSTAL RIVER UNIT 3, DOCKET NO. 50-302, g g TAC NO. 12743 g
[d:rfpg
(
. di.di EU %
.. , . , 21 T
- i. c. ud, NRC Researc,1 anc .ec1nica ,1 .
.. .fee
. , _ .-10198W Ass.istance Report ygk w ,
\ /: fs
'O5'.:f[j'b'L
~&= qqf.'d:.z.s\ a ,.4.~
I i
U.S. Department of Energy Idaho Operations Office
- Idaho National EngineerinD Laboratory l ;~ .
i
... p
% ' "~4 , .
W sj. g , w ym - jR :"\ .
, ;- .
,._~,_= gung
. 3 Weim 5lWIWWW WP32fE3 N M d.bN W^
=
- ' f c~;-m MxL.w '
w,3 E EZ*5 I r, W 2'**~ C 7< ~mtMqirp r -% '. ; ' ,,_ zgy&a i $M*[ M -
NI -
g :8Ed*.. M . ~ 3 , w . 2.. y[. -
-A,, s- + ,
i; m-t
~. ,
< M-
'~
s s-a d 3...
+ .
g
. This is an informal report intended for use as a preliminary or working document Prepared for the U.S. Nuclear Regulatory Conunission Under DOE Contract No. DE-AC07-761D01570 g $ $ g $ Idaho FIN No. A6256 81022600M
[ EGcG,.. . ,,,.
FORM EG&G N3 (Re. It 79)
INTERIM REPORT
, Accession No.
Report No. EGG-EA-5338 Contract Program or Project
Title:
Electricai, Instrumentation and Control System Support Subject of this Document:
Adequacy of Station Electric Distribut Ln System Voltages, Crystal River Unit 3, Docket No. 50-302, TAC No. 12743 Type of Document:
Informal Report Author (s): @$@@{@ gg "g
^- -
"d' '
Assistance Report Date of Document:
' January 1981 Responsible NRC Individual and NRC Office or Division:
Paul C. Shemanski, Division of Licensing This document was prepared primarily for preliminary or internat use. It has not received full review and approval. Since there may be substantive changes, this document should not be considered final.
EG&G Idaho, Inc.
Idaho Falls. Idaho 83415 I Prepared for the
' U.S. Nuclear Regulatory Commission Washington, D.C.
Under COE Contract No. DE-AC07 76lD01570 NRC FIN No. A6256 INTERIM REPORT.
0032J ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES CRYSTAL RIVER UNIT 3 Docket No. 50-302 January 1981 A. C. Udy Reliability and Statistics Branch Engineering Analysis Division EG&G Idaho, Inc.
Draft 1-15-81 TAC No. 12743
ABSTRACT The Nuclear Regulatory Commission has required all licensees to analyze the electric power system at each nuclear station. This review is to deter-mine if the onsite distribution system in conjunction with the offsite power sources has sufficient capacity and capability to automatically start and operate all required safety loads within the equipment voltage ratings.
This Technical Evaluttion Report reviews the submittals for Crystal River Unit 3.
The offsite power sources, in conjunction with the onsite distribution system, have been shown to have sufficient capacity and capability to auto-matically start as well as continuo. sly operate, all required safety related Icads within the equipment ratad vo tage limits in the event of either an .
anticipated transient or an accident condition.
FOREWORD Tnis report is supplied as part of the selected Electrica', Instrumen-t tation, and Control Systems (EICS) issues program being conducted for the U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Division of Operating Reactors, by EGSG Idaho, Inc., Reliability and Statis-tics Branch.
The U . Nuclear Regulatory Commission funded the work under the auth-orization entitled " Electrical, Instrumentation, and Control System Sup-port ," . B&R 20 19 01 03, FIN No. A6256.
CONTE NTS
1.0 INTRODUCTION
......................................... ............ 1
, 2.0 D ES IG N B AS I S C R I T E RI A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 3.0 SYSTEM DESCRIPTION ................................................ 2 4.0 ANALYSIS DESCRIPTION .............................................. 4 4.1 Design / Operation Changes ..................................... 4 4.2 Analysis Conditions .......................................... 4 4.3 Analysis Results ............................................. 5 4.4 Analysis Verification ........................................ 5 5.0 EVALUATION ........................................................ 6
6.0 CONCLUSION
S ....................................................... 7
7.0 REFERENCES
........................................................ 8 FIGURE
- 1. Crystal River Unit 3 one-line diagram ............................. 3 TABLE
- 1. Class 1E Equipment Voltage Ratings and Analyzed Worst Case Load Terminal Voltages . . . . . . . . . . . . . .......... 5 111
. - . . - ~ . .. . . .- - -- ,. .. .. =
ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES
. CRYSTAL RIVER UNIT 3 f
1.0 INTRODUCTION
j: As event at the Arkansas Nuclear One station on September 16, 1978 is described in NRC IE Information Notice No. 79-04. As a result of this event, station conformance to General Design Criteria (GDC) 17 is being questioned at all nuclear power stations. The NRC, in the generic letter
- of August 8, 1979,." Adequacy of Station Elettric Distribution Systems Volt-
- ages," required each licensee to confirm, by analysis, the adequacy of the voltage at the class 1E loads. This letter included 13 specific guide-
-lines ~ to be followed in determining if the load terminal voltage is adequate
- to start and continuously operate the class 1E loads.
~
1 Florida Power Corporation (FPC) responded to the NRC letter with a letter of April.3, 1980. .The Final Safety Analysis Report and the FPC response ' to questions regarding Reference 2, dated December 22, 1980,3 were also -reviewed for this report. A telephone call on January 5, 1981,0 > clarified portions of the Reference 3 response.
' Based on the information= supplied by~FPC, this report addresses the capacity and capability of the onsite distribution system of Crystal River
~
Unit 3, in conjunction with the offsite power system, to maintain the volt-age for the required class 1E equipment within acceptable limits for the worst'-case starting and load conditions.
L y
- 2.0- DESIGN BASIS CRLIERIA-i~ . .
- The positions applied in determining-the acceptability of the offsite l-voltage. conditions in supplying power to the class 1E equipment are derived-
~
~
from the following:
> - * - ~
-1. General Design Criterion'17 (GDC 17), " Electrical Power Systems,"~of Appendix A, " General Design Criteria for Nuclear Power-Plants," of 10 CFR 50.
n 1.
. . , - - _._ .-_ _ _ _ _ . _ , _ _ . . _ . - - . . -- . . _ ..__m_
t
- 2. General Design criteriot. 5 (GDC 5), " Sharing of struc-
-tures, Systems, and Components," of Appendix A, " General t
Design Criteria for Nuclear Power Plants," of 10 CFR 50. >
- 3. ' General Design Criterion 13 (GDC 13), " Instrumentation and Control," of Appendix A, " General Design Criteria 1
, for Nuclear Power Plants," of 10 CFR 50. -
- 4. LEEE Standard 308-1974, " Class lE Power Systems for Nuclear Power Generating Stations."
5.. Staff positions as detailed in a letter sent to the licensee, dated August 8, 1979.1
- 6. ANSI C84.1-1977, " Voltage Ratings for Electric Power Systems and Equipment (60 Hz)."
Six ' review positions have been established from the NRC analysis guide-
' 1
, lines ;and the above-listed documents. These positions are stated in Section 5.0.
i 3.0 SYSTEM DESCRIPIION- '
' Figure l_is a simplified sketch of t'eh Crystal River Unit 3 (CR3)
.one-line diagram taken from Ammendment 42 PSAR Figures 8-8 and 8-9.
Units l'and 2'areinot nuclear' units'.
-CR3 hasitaree offsite' supplies to the class lE distribution system.
Tney are: ,
e i
.l." " Start up_ transformer.3 (SUr 3), connected to'the 230kV i switchyard.
- 2. _The unit ~ auxiliary transformer-(UAT), connected to the l
~
unit _ generator by disconnect _ links and the 500kV switch-
-yard;(via a step-up_ transformer). 'The removal of the
'_ : generator-disconnect links allows'use of'the trans-
- . .former asian offsite' source.
p 3.- -Startup transformer? l/2.(SUT:l/2), connected: to. th'e
~
D -
'230kV switchyard and associated with fossil-fueled EUnits 1-and 2.. -
~
3-
.21 l
~
i TO 500 KV DISCONNECT o 230 KV s SWITCHYARD LINKS SWITCHYARD o / VIA STEP-UP
- g. TRANSFORMER ^
UAT #3 SUT 83 WT TT mm mm
" DISCONNECT "
o LINKS o 3B 3A 6900V 6900V l
3B TCHYARD-3A 4160V ^ 4160V DG WW UNIT 1/2 DG 3B SVT g S3. _;, BUSES IB & 2B d 3A i
> BUSES 1A & 2A l 3B 3A 4160V 4160V NC CLASS lE N ' CLASS lE i
3B 3A 480V 480V CLASS lE CLASS lE CRYSTAL RIVER- d THESE 4160V BUSES ARE IN UNIT 3 FOSSIL FUELED UNITS 1 AND 2.
ONE LINE DIAGRAM 2. UNITS 1 AND 2 OUTPUT FIGURE 1 _ CONNECTED TO 230 KV
, SWITCHYARD.
3
- l. _ - - . . - .
The 480V class lE ouses 3A and 3B are powerei by 4160V class IE buses 3A and 3B, respectively, by individual transformers. Technical Specification 3.8.2.1 prevents the use of the inter-tie between 480V ,
buses 3A and 3B during nuclear operation. '30V class IE motor-control centers (MCCs) use individual control trans rs to power the associated -
control circuits.
Essential 120V AC power is supplied by non-interruptable power sources that are backed-up by station batteries. Should an inverter be shut down for maintenance, self-regulating transformers (over a +15% input range) are uned.
4.0 ANALYSIS DESCRIPTION 4.1 Design / Operation Changes. The voltages shown on Table 1 are based on the licensee changing the tan etting of the Unit 3 SUT to the 230,000V tap.3 .
4.2 Analysis Conditions. FPC has determined by contingency plan-ning that the maximum expected 230kV offsite grid voltage is 243.6kV and the minimum is 236.4kV. Similarly, the maximum expected 500kV offsite grid voltage is 540kV and the minimum is 475kV.
FPC has analyzed each offsite source to the onsite distribution nystem under extremes of load and offsite voltage conditions to determine the voltages for the class lE equipment. The vorst case class lE equipment voltages occur under the following conditions:
- 1. The maximum steady-state load terminal voltage occurs using the Unit 3 SUT with the unit refueling load.
- 2. The minimum steady-state load terminal voltage occurs with the UAT supplying the unit refueling load. -
- 3. The minimum transient load terminal-voltage occurs with .
the conditions of 2 above concurrent with the start of the largest class IE motor.
4
TABLE 1 CLASS lE EQUIPMENT VOLTAGE RATINGS AND
. ANALYZED WORST CASE TERMINAL VOLTAGES
(% of nominal voltage)
Maximum Minimum Analyzed Equipment Condition Rated Analyzed Rated Steady State Transient 4000V Motors Start -- --
85 --
90.6a Operate 110 109.2 90 92.9a __
460V Motors Start -- --
85 --
88.6a Operate 110 107.7 90 91.02 --
480V Starters Pickup -- --
80.5 87.2 84.9 Dropout -- --
55 87.2 84.9 Operate 110 103.2 85 87.2 --
Other Equipment C
- a. Bus voltage; feeder cable drop negligible.2
. b. 80.5 is the average value when the coil is hot, 75 is the rated value when the coil is cold.5
- c. Vital instrumentation and control loads are powered by non-interruptable power sources. The inverter automatically transfers ta the DC battery source if the AC voltage is outside of +10% of nominal. These loads are powered, during inverter maintenance, by self-regulating transfor-mers (+1% regulation over +15% input). ,
4.3 Analysis Result. Table 1 shows the projected worst case class lE equipment terminal voltages.
4.4 Analysis Verification. FPC has proposed to record bus voltages on ene plant auxiliary and class lE buses while Crystal River Unit 3 is operating and the 230kV grid voltage is held at 243.6kV. This test proced-ure would be repeated while the grid voltage is held at 236.4kV.
- These recorded voltages would be compared to calculated voltages.
5
!L 4
- 5.0 EVALUATION Six review positions have been established from the NRC analysis guide- ,
' I lines and the documents listed in Section 2.0 of this report. Each review position is stated below followed by an evaluation of the licensee submittals. The evaluations are based on completion of the design change described in Section 4.1.
. Position 1--With the minimum expected offsite grid voltage and maximum
- load condition, each offsite source and distribution system connection combination must be capable of starting and of continuously operating all class IE equipment within the equipment voltage ratings.
FPC has shown,' by analysis, that Crystal River Unit 3 has sufficient capability.and: capacity for starting and continuously operating the class IE loads.within the-equipment voltage ratings (Table 1).
Position 2--With the maximum expected of fsite grid voltage and minimum ,
" load condition, each offsite source and' distribution-system connection combination must be' capable of ' continuously operating the required class IE
. equipment without exceedin'g the equipment voltage ratings.
FPC has shown,fby analysis, that the voltage ratings of the class 1E equipment will not be exceeded.
Position 3--Loss'of'offsite power to either of the redundant class IE distribution' systems due to operation of voltage protection relays, must
.not _ occur when the. offsite power source -is within expected voltage limits.
>EG&G: Idaho,-Inc.,.will verify, in;a separate report, that the require-
- ments.:of this position are satisfied (TAC No.- 10017).
Position 4--The LNRC!1etter requires that test-results verify:the ..
, accuracy.of:the voltage analyses supplied.
b t
6 1
FPC has proposed a test to verify the accuracy of the submitted analysis. This proposed cest is acceptable if the test values can be shown to accurately show feeder and transformer voltage drops. Further, this test should verify that the feeder cable voltage drops are negligible as assumed (see footnote a of Table 1).
Position 5--No event or condition should result in the simultanecus or consequential los, of both required circuits from the offsite power network to the onsite distribution system (GDC 17).
FPC has analyzed the connections of Crystal River Unit 3 to the offsite power grid, and has determined that no potential exists for simultaneous or consequential loss of more than one circuit from the of fsite grid.
Position 6--As required by GDC 5, each offsite source shared between units in a multi-unit station must be capable of supplying adequate starting and operating voltage for all required class IE loads with an accident in one unit and an orderly shutdown and cooldown in the remaining units.
Crystal River is the site of one nuclear unit and two operating fossil-fueled units. With no interconnected nuclear units, position 6 is not applicable to Crystal River Unit 3.
6.0 CONCLUSION
S The voltage analyses submitted by FPC for Crystal River Unit 3 were evaluated in Section 5.0 of this report. Upon the completion of change described in Section 4.1, it was found that:
- 1. Voltages within the operating limits of the class lE equipment are supplied for all projected combinations of plant load and offsite power grid conditions. How -
ever, FPC should verify, by tect, that the feeder cable voltage drops are negligible.
- 2. The proposed test to verify the accuracy of the analysis is satisfactory if the test measurements are made with the class lE buses and MCCs loaded to at least 30% of their full load. If this is not possible, FPC shculd h
7
- m . . ._ _ - m .__ _ _ _ _ . . , _ _ . - _ . _. . _ _ . . _ .
I i
l l
define on what other basis their voltage measurements ;
accurately acc>unt for feeder and transformer voltage j drops. ;
- 3. FPC has determined that no potential for either a simultanous or a consequential loss of of fsite power l sources exists. -
EG&G Idaho, Inc., is performing a separate review of the undervoltage l relay protection at. Crystal River Unit 3. This will evaluate the relay
- setpoints and time delays to determine that spurious tripping of the
-class 1E buses will not occur with normal offsite source voltages.
7.0 REFERENCES
- 1. NRC letter, William Gammill, to All Power Reactor Licensees (Except Humboldt Bay), " Adequacy of Station Electric Distribution Systems Voltaga," August 8, 1979.
- 2. FPC letter, R. M. Bright, to-W. Gammill, U.S. NRC, " Adequacy of Station ,
Electric Distribution Systems Voltages," April 3, 1980.
- 3. FPC-letter, P. Y. Baynard, to R. W. Reid, U.S. NRC, " Adequacy of Sta-
- l -tion Electric Distribution Systems Voltages," December 22, 1980.
- 4. . Telecon, A. C..Udy, EG&G Idaho, Inc., and K. Baker, FPC, January 5,
-1981.
- 15. Allen-Bradley letter, Van Smith'& Co., Tampa District Office, to FPC, Att: Gary Castleberry, " Crystal River Unit #3," December 3,1980.
(-.
t J