Category:CONTRACTED REPORT - RTA
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:QUICK LOOK
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] |