Activity Plan (NRC Inspection Report 05000325-06-001 and 05000324-06-001)
ML060610385
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/02/2006
From:
Division Reactor Projects II
To:
Shared Package
ML060610380 List:
References
IR-06-001
Download: ML060610385 (2)


See also: IR 05000324/2006001

Text

Brunswick Inspection / Activity Plan

03/01/2006

-09/30/2007

Inspection

Type Inspection Activity

Planned Dates

Start End

No. of Staff

on Site Title Unit Number Page 1 of 2

03/02/2006

06:22:15 Report 22 1 EB3-ISI-U1 INSERVICE INSPECTION

Baseline Inspections

03/06/2006

03/10/2006

1 7111108G IP Inservice Inspection Activities - BWR

4 EB1-MODS-MODIFICATIONS/10CFR50.59

Baseline Inspections

04/03/2006

04/07/2006

1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments

Baseline Inspections

04/03/2006

04/07/2006

1, 2 7111117B IP Permanent Plant Modifications

1 DRP-SUPPLEMENTAL INSPECTION 95001

Supplemental Progra

m 06/05/2006

06/09/2006

2 95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area

1 PSB1-RP-RP PUBLIC PRE-INSP VISIT

Baseline Inspections

08/07/2006

08/09/2006

1, 2 7112101 IP A ccess Control to Radiologically Significant Areas

4 PSB1-RP-RP PUBLIC BASELINE INSPECTION

Baseline Inspections

08/28/2006

09/01/2006

1, 2 7112101 IP A ccess Control to Radiologically Significant Areas

Baseline Inspections

08/28/2006

09/01/2006

1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment

Baseline Inspections

08/28/2006

09/01/2006

1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

Baseline Inspections

08/28/2006

09/01/2006

1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P

Baseline Inspections

08/28/2006

09/01/2006

1, 2 71151 IP Performance Indicator Verification

3 PS2-EP-EP EXERCISE

Baseline Inspections

11/06/2006

11/10/2006

1, 2 7111401 IP Exercise Evaluation

Baseline Inspections

11/06/2006

11/10/2006

1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes

Baseline Inspections

11/06/2006

11/10/2006

1, 2 71151 IP Performance Indicator Verification

2 OL RQ-REQUAL INSPECTION

Baseline Inspections

11/13/2006

11/17/2006

1, 2 7111111B IP Licensed Operator Requalification Program

1 EB3-HS-HEAT SINK Baseline Inspections

12/04/2006

12/08/2006

1, 2 7111107B IP Heat Sink Performance

1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT

Baseline Inspections

02/05/2007

02/07/2007

1, 2 7112101 IP A ccess Control to Radiologically Significant Areas

2 EB3-MR-MR EFFECTIVENESS

Baseline Inspections

02/26/2007

03/02/2007

1, 2 7111112B IP Maintenance Effectiveness

2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP- WK1

Baseline Inspections

03/05/2007

03/09/2007

1, 2 7112101 IP A ccess Control to Radiologically Significant Areas

Baseline Inspections

03/05/2007

03/09/2007

1, 2 7112102 IP A LARA Planning and Controls

Baseline Inspections

03/05/2007

03/09/2007

1, 2 7112202 IP Radioactive Material Processing and Transportation

Baseline Inspections

03/05/2007

03/09/2007

1, 2 71151 IP Performance Indicator Verification

1 EB3-ISI-U2 INSERVICE INSPECTION

Baseline Inspections

03/12/2007

03/16/2007

2 7111108G IP Inservice Inspection Activities - BWR

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Brunswick Inspection / Activity Plan

03/01/2006

-09/30/2007

Inspection

Type Inspection Activity

Planned Dates

Start End

No. of Staff

on Site Title Unit Number Page 2 of 2

03/02/2006

06:22:15 Report 22 3 PSB1-RP-RP OCCUPATIONAL OCCUPATIONAL INSP- WK2

Baseline Inspections

03/19/2007

03/23/2007

1, 2 7112101 IP A ccess Control to Radiologically Significant Areas

Baseline Inspections

03/19/2007

03/23/2007

1, 2 7112102 IP A LARA Planning and Controls

Baseline Inspections

03/19/2007

03/23/2007

1, 2 7112202 IP Radioactive Material Processing and Transportation

Baseline Inspections

03/19/2007

03/23/2007

1, 2 71151 IP Performance Indicator Verification

4 OL PREP-INITIAL EXAM PREP

Not Applicable

06/25/2007

06/29/2007

1 V23226 BRUNSWICK/NOVEMBER 2004 EXAM AT POWER FACILITIES

4 OL EXAM-INITIAL EXAM

Not Applicable

07/16/2007

07/27/2007

1 V23226 BRUNSWICK/NOVEMBER 2004 EXAM AT POWER FACILITIES

6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION

Baseline Inspections

08/13/2007

08/16/2007

1, 2 7111121 IP Component Design Bases Inspection

Baseline Inspections

08/27/2007

08/31/2007

1, 2 7111121 IP Component Design Bases Inspection

Baseline Inspections

09/10/2007

09/14/2007

1, 2 7111121 IP Component Design Bases Inspection

Baseline Inspections

09/24/2007

09/28/2007

1, 2 7111121 IP Component Design Bases Inspection

1 PSB2-BASELINE SECURITY INSPECTION

Baseline Inspections

08/20/2007

08/24/2007

1, 2 7113004 IP Equipment Performance, Testing, and Maintenance

Baseline Inspections

08/20/2007

08/24/2007

1, 2 7113007 IP Security Training

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.