Activity Plan (NRC Inspection Report 05000325-06-001 and 05000324-06-001)
ML060610385
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/02/2006
From:
Division Reactor Projects II
To:
Shared Package
ML060610380 List:
References
IR-06-001
Download: ML060610385 (2)


See also: IR 05000324/2006001

Text

Brunswick

Inspection / Activity Plan

03/01/2006 - 09/30/2007

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 2

03/02/2006

06:22:15

Report 22

1

EB3-ISI

- U1 INSERVICE INSPECTION

Baseline Inspections

03/06/2006

03/10/2006

1

7111108G

IP

Inservice Inspection Activities - BWR

4

EB1-MODS

- MODIFICATIONS/10CFR50.59

Baseline Inspections

04/03/2006

04/07/2006

1, 2

7111102

IP

Evaluation of Changes, Tests, or Experiments

Baseline Inspections

04/03/2006

04/07/2006

1, 2

7111117B

IP

Permanent Plant Modifications

1

DRP

- SUPPLEMENTAL INSPECTION 95001

Supplemental Program

06/05/2006

06/09/2006

2

95001

IP

Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area

1

PSB1-RP

- RP PUBLIC PRE-INSP VISIT

Baseline Inspections

08/07/2006

08/09/2006

1, 2

7112101

IP

Access Control to Radiologically Significant Areas

4

PSB1-RP

- RP PUBLIC BASELINE INSPECTION

Baseline Inspections

08/28/2006

09/01/2006

1, 2

7112101

IP

Access Control to Radiologically Significant Areas

Baseline Inspections

08/28/2006

09/01/2006

1, 2

7112103

IP

Radiation Monitoring Instrumentation and Protective Equipment

Baseline Inspections

08/28/2006

09/01/2006

1, 2

7112201

IP

Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

Baseline Inspections

08/28/2006

09/01/2006

1, 2

7112203

IP

Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P

Baseline Inspections

08/28/2006

09/01/2006

1, 2

71151

IP

Performance Indicator Verification

3

PS2-EP

- EP EXERCISE

Baseline Inspections

11/06/2006

11/10/2006

1, 2

7111401

IP

Exercise Evaluation

Baseline Inspections

11/06/2006

11/10/2006

1, 2

7111404

IP

Emergency Action Level and Emergency Plan Changes

Baseline Inspections

11/06/2006

11/10/2006

1, 2

71151

IP

Performance Indicator Verification

2

OL RQ

- REQUAL INSPECTION

Baseline Inspections

11/13/2006

11/17/2006

1, 2

7111111B

IP

Licensed Operator Requalification Program

1

EB3-HS

- HEAT SINK

Baseline Inspections

12/04/2006

12/08/2006

1, 2

7111107B

IP

Heat Sink Performance

1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT

Baseline Inspections

02/05/2007

02/07/2007

1, 2

7112101

IP

Access Control to Radiologically Significant Areas

2

EB3-MR

- MR EFFECTIVENESS

Baseline Inspections

02/26/2007

03/02/2007

1, 2

7111112B

IP

Maintenance Effectiveness

2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP- WK1

Baseline Inspections

03/05/2007

03/09/2007

1, 2

7112101

IP

Access Control to Radiologically Significant Areas

Baseline Inspections

03/05/2007

03/09/2007

1, 2

7112102

IP

ALARA Planning and Controls

Baseline Inspections

03/05/2007

03/09/2007

1, 2

7112202

IP

Radioactive Material Processing and Transportation

Baseline Inspections

03/05/2007

03/09/2007

1, 2

71151

IP

Performance Indicator Verification

1

EB3-ISI

- U2 INSERVICE INSPECTION

Baseline Inspections

03/12/2007

03/16/2007

2

7111108G

IP

Inservice Inspection Activities - BWR

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Brunswick

Inspection / Activity Plan

03/01/2006 - 09/30/2007

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 2

03/02/2006

06:22:15

Report 22

3

PSB1-RP

- RP OCCUPATIONAL OCCUPATIONAL INSP- WK2

Baseline Inspections

03/19/2007

03/23/2007

1, 2

7112101

IP

Access Control to Radiologically Significant Areas

Baseline Inspections

03/19/2007

03/23/2007

1, 2

7112102

IP

ALARA Planning and Controls

Baseline Inspections

03/19/2007

03/23/2007

1, 2

7112202

IP

Radioactive Material Processing and Transportation

Baseline Inspections

03/19/2007

03/23/2007

1, 2

71151

IP

Performance Indicator Verification

4

OL PREP

- INITIAL EXAM PREP

Not Applicable

06/25/2007

06/29/2007

1

V23226

BRUNSWICK/NOVEMBER 2004 EXAM AT POWER FACILITIES

4

OL EXAM

- INITIAL EXAM

Not Applicable

07/16/2007

07/27/2007

1

V23226

BRUNSWICK/NOVEMBER 2004 EXAM AT POWER FACILITIES

6

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION

Baseline Inspections

08/13/2007

08/16/2007

1, 2

7111121

IP

Component Design Bases Inspection

Baseline Inspections

08/27/2007

08/31/2007

1, 2

7111121

IP

Component Design Bases Inspection

Baseline Inspections

09/10/2007

09/14/2007

1, 2

7111121

IP

Component Design Bases Inspection

Baseline Inspections

09/24/2007

09/28/2007

1, 2

7111121

IP

Component Design Bases Inspection

1

PSB2

- BASELINE SECURITY INSPECTION

Baseline Inspections

08/20/2007

08/24/2007

1, 2

7113004

IP

Equipment Performance, Testing, and Maintenance

Baseline Inspections

08/20/2007

08/24/2007

1, 2

7113007

IP

Security Training

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.