Aam Slides for EOC 2006-07
ML071000208
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/29/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML071000208 (21)


Text

2006 Reactor Oversight Program 2006 Reactor Oversight Program 2 2NRC will address Seabrook NRC will address Seabrook

s performance as s performance as described in the annual assessment letterdescribed in the annual assessment letterSeabrook will be given the opportunity to respond to Seabrook will be given the opportunity to respond to the information in the letter and inform the NRC of the information in the letter and inform the NRC of new or existing programs to maintain or improve new or existing programs to maintain or improve their performance their performance NRC will be available to engage interested NRC will be available to engage interested stakeholders on performance of the plant and our role stakeholders on performance of the plant and our role in ensuring safe plant operations in ensuring safe plant operations 3 3Introduction and NRC OrganizationReview of NRC Reactor Oversight ProcessRegulatory Summary of National Plant PerformanceNRC Assessment of Seabrook's PerformanceSeabrook Response and RemarksNRC Closing RemarksBreakNRC available to address public questions 4 4Samuel J. CollinsRegional Administrator Marc L. DapasDeputy Regional AdministratorDavid C. LewDirector Division of Reactor ProjectsJames W. CliffordDeputy DirectorA. Randolph BloughDirector Division of Reactor SafetyMarsha K. GamberoniDeputy DirectorPaul G. KrohnBranch ChiefRegional SpecialistsSeabrookResident InspectorsGlenn DentelSteve ShafferSenior Project EngineerBarry NorrisProject EngineerEugene Huang 5 5Marsha Marsha GamberoniGamberoni , Deputy Division Director, DRS , Deputy Division Director, DRS

--(610) 337 (610) 337--5128 5128Paul Paul Krohn Krohn , Branch Chief , Branch Chief

--(610) 337 (610) 337--5120 5120Glenn Dentel, Senior Resident InspectorGlenn Dentel, Senior Resident Inspector Steve Shaffer, Resident Inspector Steve Shaffer, Resident Inspector

--(603) 474 (603) 474--3589/3580 3589/3580Barry Norris, Senior Project Engineer Barry Norris, Senior Project Engineer

--(610) 337 (610) 337--5111 5111Eugene Huang, Project Engineer Eugene Huang, Project Engineer

--(610) 337 (610) 337--5322 5322 6 6Safety: Ensure protection of the public health and Safety: Ensure protection of the public health and safety and the environmentsafety and the environmentSecurity: Ensure the secure use and management of Security: Ensure the secure use and management of radioactive materials radioactive materialsOpenness: Ensure openness in our regulatory processOpenness: Ensure openness in our regulatory processEffectiveness: Ensure that NRC actions are effective, Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely efficient, realistic, and timelyManagement: Ensure excellence in agency Management: Ensure excellence in agency management to carry out NRC strategic objectivesmanagement to carry out NRC strategic objectives 7 7 8 8Equipment Alignment Triennial Fire Protection Operator Response Emergency Preparedness Radiation Release Controls Worker Radiation Protection Corrective Action Program Corrective Action Case Reviews 9 9%Only Baseline Inspection:May increase NRC oversight(:Requires more NRC oversight:Requires more NRC oversight:Very Low safety issue:Low to moderate safety issue(:Substantial safety issue:High safety issue 10 10+,.,/

11 11Status at End of 2006Licensee Response 70Regulatory Response 24Degraded Cornerstone 6Multiple/Repetitive Degraded Cornerstone3Unacceptable 0Total103 12 12

!1843!11!(0!0!676!13!(0!0 13 13!!5568 Hours of inspection and assessment related 5568 Hours of inspection and assessment related activities activities

!!Two resident inspectors assigned to the site Two resident inspectors assigned to the site

!!Specialist Inspections Specialist Inspections

--4 regional inspections 4 regional inspections

--3 team inspections3 team inspections

--1 special inspection1 special inspection 14 14!!Daily Resident Inspections Daily Resident Inspections

!!Refueling outage (October 1 Refueling outage (October 1

--October 30)

October 30)

!!NRC evaluated Emergency Preparedness inspectionNRC evaluated Emergency Preparedness inspection

!!Problem Identification and Resolution team inspectionProblem Identification and Resolution team inspection

!!Special Inspection Team for Emergency Diesel Generator Special Inspection Team for Emergency Diesel Generator issue that occured in August.

issue that occured in August.

15 15Licensee Response Column for 1Licensee Response Column for 1 st st , 2 , 2 nd nd , and 4 , and 4 th th Quarters QuartersRegulatory Response Column for 3Regulatory Response Column for 3 rd rd Quarter Quarter--White Performance Indicator for exceeding reliability threshold White Performance Indicator for exceeding reliability threshold for the for the emergency diesel generator (EDG) Mitigating System Performance emergency diesel generator (EDG) Mitigating System Performance Index Index--Supplemental inspection planned for May 2007 Supplemental inspection planned for May 2007 Inspection Findings Inspection Findings

--10 Findings of very low safety significance (Green) over entire 10 Findings of very low safety significance (Green) over entire yearyear 16 16FPL operated Seabrook Station in a manner that FPL operated Seabrook Station in a manner that preserved public health and safety preserved public health and safetyAll Reactor Oversight Process cornerstone objectives All Reactor Oversight Process cornerstone objectives were met were metNRC plans baseline inspections at Seabrook for the 2007 NRC plans baseline inspections at Seabrook for the 2007 assessment periodassessment period 17 17 Gene St. Pierre Gene St. Pierre Site Vice President Site Vice President FPL Energy Seabrook, LLC FPL Energy Seabrook, LLC 18 18Report an emergency Report an emergency

!!(301) 816 (301) 816--5100 (call collect) 5100 (call collect)Report a safety concern:

Report a safety concern:

!!(800) 695 (800) 695--7403 7403  !!Allegation@nrc.gov Allegation@nrc.govGeneral information or questions General information or questions

!!www.nrc.gov www.nrc.gov

!!Select Select ""What We Do What We Do

""for Public Affairs for Public AffairsPaul Paul Krohn Krohn , Branch Chief , Branch Chief

!!pgk1@nrc.govpgk1@nrc.gov 19 19Reactor Oversight Process Reactor Oversight Process

!!http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlhttp://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlPublic Electronic Reading Room Public Electronic Reading Room

!!http://www.nrc.gov/readinghttp://www.nrc.gov/reading

--rm.htmlrm.htmlPublic Document Room Public Document Room

!!1 1--800 800--397 397--4209 (Toll Free) 4209 (Toll Free)

Nuclear Regulatory Commission Nuclear Regulatory Commission