Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23206A0542023-07-25025 July 2023 2A, Exam Administrative Items (Hatch 2021-301) ML23206A0502023-07-25025 July 2023 2A, Exam Final Items (Hatch 2021-301) IR 05000321/20213022022-01-21021 January 2022 NRC Operator License Examination Report 05000321/2021302 and 05000366/2021302 ML21111A0292021-04-19019 April 2021 301, Exam Report ML20231A2362020-08-18018 August 2020 301, Corporate Notification Letter (210-day Letter) IR 05000321/20193012019-10-17017 October 2019 NRC Operator License Examination Report 05000321/2019301 and 05000366/2019301 IR 05000321/20173012018-01-23023 January 2018 NRC Operator License Examination Report 05000321/2017301 and 05000366/2017301 IR 05000321/20153012015-04-30030 April 2015 Er 05000321/2015301 and 05000366/2015301; March 23 - 30, 2015, and April 9, 2015; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Operator License Examinations ML15084A5512015-03-20020 March 2015 Operator Licensing Written Examination Approval 05000321/2015301 and 05000366/2015301 IR 05000321/20123012012-08-0909 August 2012 Er 05000321-12-301 & 05000366-12-301, on 06/18-20/12 - 06/28/12, Edwin I. Hatch, Units 1 & 2 IR 05000321/20113012011-07-28028 July 2011 Er 05000321/11-301 and 05000366/11-301, on June 6 - 10, 2011, and June 23, 2011, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Operator License Examinations IR 05000321/20093022009-12-0303 December 2009 Er 05000321-09-302 and 05000366-09-302, on October 26 - 30, 2009, & November 12, 2009; Edwin I. Hatch Nuclear Plant, Units 1 & 2; Operator License Examinations ML0914802702009-05-28028 May 2009 NRC Operator License Examination Report 05000321-09-301 and 05000366-09-301 ML0911800212009-04-27027 April 2009 April Exam 05000321/2009301 & 05000366/2009301 Approval Letter 4-27-2009 ML0801004082008-01-10010 January 2008 Er 05000321-07-301 & Er 05000366-07-301; on 12/03 - 06, 2007 & 12/10, 2007, Southern Nuclear Operating Company, Inc.; E. I. Hatch, Units 1 & 2, NRC Examination Report 2024-01-17
[Table view] |
See also: IR 05000321/2009301
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931
May 28, 2009
Southern Nuclear Operating Company, Inc. ATTN: Mr. Dennis R. Madison
Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000321/2009301 AND 05000366/2009301
Dear Mr. Madison:
During the period April 20 - 22, 2009, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Edwin I. Hatch Nuclear Plant Units 1 and 2. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on April 30, 2009.
All applicants passed both the operating test and written examination. There were no post-examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
If you have any questions concerning this letter, please contact me at (404) 562-4550.
Sincerely, /RA/ Malcolm T. Widmann, Chief Operations Branch
Division of Reactor Safety
Docket Nos: 50-321, 50-366 License Nos: DPR-57, NPF-5
Enclosures: 1. Report Details 2. Simulator Fidelity Report
(cc: w/encl - See Page 2)
SNC 2 cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Raymond D. Baker Licensing Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
Mr. Ken Rosanski Resident Manager Edwin I. Hatch Oglethorpe Power Corporation Electronic Mail Distribution
Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation
Electronic Mail Distribution
Senior Resident Inspector Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N
Baxley, GA 30334
Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution
Dr. Carol Couch Director Environmental Protection Department of Natural Resources
Electronic Mail Distribution
Cynthia Sanders Program Manager Radioactive Materials Program
Department of Natural Resources Electronic Mail Distribution
Jim Sommerville (Acting) Chief
Environmental Protection Division Department of Natural Resources Electronic Mail Distribution
(cc: w/encl - Cont'd See Page 3)
SNC 3 cc w/encl: Mr. Steven M. Jackson Senior Engineer - Power Supply
Municipal Electric Authority of Georgia Electronic Mail Distribution
Mr. Reece McAlister Executive Secretary
Georgia Public Service Commission Electronic Mail Distribution
Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201
Baxley, GA 31513
Southern Nuclear Operating Company, Inc. ATTN: Mr. John Hammonds Training Manager
Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
REGION II
Docket No.: 50-321, 50-366
License No.: DPR-57, NPF-5
Report No.: 05000321/2009301 and 05000366/2009301
Licensee: Southern Nuclear Power Company (SNPCO)
Facility: Edwin I. Hatch Nuclear Plant, Units 1 & 2
Location: 11030 Hatch Parkway N. Baxley, GA 31513
Dates: Operating Test - April 20 - 22, 2009 Written Examination - April 30, 2009
Examiners: Bruno Caballero, Chief Examiner, Operations Engineer Phil Capehart, Operations Engineer
Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety
Enclosure 1 SUMMARY OF FINDINGS
ER 05000321/2009301 and 05000366/2009301; April 20 - 22, 2009 & April 30, 2009; Edwin I. Hatch Nuclear Plant, Units 1 & 2; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in
accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Edwin I. Hatch staff developed both the operating tests and the written
examination.
The NRC administered the operating tests during the period April 20 - 22, 2009. Members of the Edwin I. Hatch training staff administered the written examination on April 30, 2009. All Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. One Reactor Operator (RO), who had previously passed the operating exam, but had failed a written examination, passed the written examination and was waived from the
operating test. All applicants were issued licenses commensurate with the level of examination administered. There were no post-examination comments.
No findings of significance were identified.
Enclosure 1 REPORT DETAILS
4. OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a. Inspection Scope
Members of the Edwin I. Hatch staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC reviewed the licensee's examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49,
"Integrity of examinations and tests."
The NRC examiners evaluated two Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period April 20 - 22, 2009. Members of the Edwin I. Hatch training staff
administered the written examination on April 30, 2009, to two SRO applicants and one RO applicant. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Edwin I. Hatch Nuclear Plant, met the requirements specified in 10 CFR Part 55, "Operators' Licenses."
b. Findings
No findings of significance were identified.
The NRC determined, using NUREG-1021 that the licensee's examination submittal (operating and written) was within the range of acceptability expected for a proposed examination.
Both Senior Reactor Operator (SRO) applicants passed both the operating test and
written examination. One Reactor Operator (RO), who had previously passed the operating exam, but failed the written, passed the written retake examination and was waived from the operating test. One RO applicant and two SRO applicants were issued licenses.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
4 Enclosure 1 The licensee did not submit any post-examination comments. A copy of the final RO written examination and answer key and final SRO written examination and answer key (SRO exam in 2 parts) with all changes incorporated, may be accessed in the ADAMS system (ADAMS Accession Numbers ML091320207, ML091320198, and ML091320204, respectively).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On April 23, 2009 the NRC examination team discussed generic issues associated with
the operating test with Mr. Sonny L. Bargeron, Plant Manager, and members of the Edwin I. Hatch Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT
Licensee personnel
Sonny L. Bargeron, Plant Manager Gary R. Brinson, Operations Manager Steve Grantham, Operations Training Supervisor
Charlie Edmund, Plant Instructor - Lead
NRC personnel
Phil Niebaum, Resident Inspector
Enclosure 2 SIMULATOR FIDELITY REPORT
Facility Licensee: Edwin I. Hatch
Facility Docket No.: 50-321, 50-366
Operating Test Administered: April 20 - 22, 2009
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description
1. SCR 20090402: During a loss of Control Rod Drive at low power (2%, pressure @ 400 psig), mfC12_27_22_23, "Accumulator Trouble light for rod 22-23" was activated. This rod was fully inserted. At this time, both CRD pumps were off. When a CRD
pump was started, the rod with the accumulator malfunction received a rod drift. This rod drift was not expected and the reason for receiving it was not obvious. Only the rod with the accumulator malfunction (12_27_22-23) received the rod drift. Subsequently, the simulator was reset and the accumulator
malfunction was activated on a different control rod (C12_12_30_23). When a CRD pump was started, only the rod with the accumulator malfunction received the rod drift. The indications on the CRD system at the time were that CRD discharge pressure reached 1500 psig, the flow control valves
were closed, and cooling water flow went to approximately 10 gpm.
ML091480270 x
G SUNSI REVIEW COMPLETE x PUBLICLY AVAILABLE x NON-SENSITIVE