ML102530489

From kanterella
Revision as of 05:29, 21 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2010/08/11 Diablo Canyon Lr - Draft Telecon Summary 08-03-10 Scoping/Screening and AMR
ML102530489
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/11/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML102530489 (6)


Text

1 DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Wednesday, August 11, 2010 2:44 PM To: Grebel, Terence; Soenen, Philippe R Cc: DiabloHearingFile Resource

Subject:

Draft Telecon Summary 08-03-10 Scoping/Screening and AMR Attachments:

Telecon Summary 08-03-10 S&S and AMR.doc Terry & Philippe, Attached is a draft of the Teleconference Call Summary from 8/3/2010. Please review and let me know if there are any corrections/changes needed.

Please let me know if you have any questions.

NathanielFerrerProjectManagerDivisionofLicenseRenewalOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)415 1045 Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 1164 Mail Envelope Properties (Nathaniel.Ferrer@nrc.gov20100811144400)

Subject:

Draft Telecon Summary 08-03-10 Scoping/Screening and AMR Sent Date: 8/11/2010 2:44:04 PM Received Date: 8/11/2010 2:44:00 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients: "DiabloHearingFile Resource" <DiabloHearingFile.Resource@nrc.gov> Tracking Status: None "Grebel, Terence" <TLG1@PGE.COM>

Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 407 8/11/2010 2:44:00 PM Telecon Summary 08-03-10 S&S and AMR.doc 77818

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

LICENSEE: Pacific Gas and Electric Company

FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 3, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION SCOPING AND SCREENING AND AGING MANAGEMENT REVIEW The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on August 3, 2010, to obtain clarification on the staff's draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application (LRA).

By e-mail dated July 22, 2010, the staff sent D-RAIs to PG&E regarding scoping and screening and aging management review. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staff's D-RAIs. Enclosure 2 provides discussions on D-RAIs for which the applicant requested clarification. No changes to other D-RAIs were necessary as a result of this telephone conference call. Formal RAIs will be issued by a separate letter.

Enclosure 1 provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated

cc w/encls: Distribution via Listserv

OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10

Enclosure 1 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3, 2010

PARTICIPANTS A FFILIATIONS Nate Ferre r U.S. Nuclear Re g ulator y Commission (NRC)Stan Gardocki NRC Garr y Armstron g NRC Rachel Vauche r NRC Yo gen Garud A r gonne National Laborator y Terr y Grebel Pacific Gas and Electric Com p an y (PG&E)Phili ppe Soenen PG&E K yle Duke PG&EChris Beard PG&E

Chalmer M y e r Strate gic Teamin g And Resource Sharin g (STARS)Dave Kunsemille r STARS Al Saunders STARS Ken Br yant STARS

Enclosure 2 Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Scoping and Screening/Aging Management Review D-RAI 2.3.3.4-01

On LRA drawings LR-DCPP-14-106714-03 and LR-DCPP-14-107714-03, the applicant depicts the label "stuffing box" at locations 31-C, 33-C, and 35-C, but the components are not shown.

On the LRA AMR Table 2.3.3-4 for the component cooling water (CCW) system, the "stuffing box" component is not listed. The staff requests that the applicant justify the exclusion of the stuffing box from LRA Table 2.3.3-4.

Discussion

Based on discussion with the applicant, it was determined that the stuffing box for the pumps were within the scope of license renewal and covered within the pump component type in LRA Table 2.3.3-4. Therefore, this question is withdrawn and will not be sent as a formal RAI.