UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled
LIMITED INTERNAL
DISTRIBUTION PERMITTED
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
February 27, 2013
Mr. T. Preston Gillespie, Jr.
Site Vice President
Duke Energy Corporation
Oconee Nuclear Station
7800 Rochester Highway
Seneca, SC 29672-0752
SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC
INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Oconee Nuclear Station on May 20 - 24, 2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII office and personnel from the
NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be
conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of
Implementation of Interim Cyber Security Milestones 1-7." The TI inspection will be performed
to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit a proposed cyber security plan (CSP) and implementation schedule for NRC review and approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute
(NEI), the NRC provided their expectations for the proposed implementation schedule. On
January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial "Template for the
Cyber Security Plan Implementation Schedule" (ML110060097). On February 28, 2011, by
letter (ML110600206) to the NRC, NEI provided a revised, "Template for the Cyber Security Plan Implementation Schedule." The purpose of the letter's attachment was to provide the
licensee with a generically written templat
e to develop their proposed CSP implementation schedule. Utilization of the generic template required the licensee to make conforming changes to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,
implementation schedule, and other applicable information for your facility provided the
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
T. Preston Gillespie, Jr. 2
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
implementation aspects, including the key intermediate milestone attributes and dates as well as the full implementation dates. The implementation aspects were described based, in part, on
letters to the NRC dated November 20, 2009 (ML093410249), August 16, 2010
(ML1023001680, ML1023001681) and supplemented by letters dated September 27, 2010, March 7, 2011, April 15, 2011 (ML111090627), and August 9, 2011 (ML11109A0741). By
reference to letter dated August 31, 2011 (ML11216A064), license condition 3.E was modified for facility operating licenses DPR-38, DPR-47, and DPR-55 for Oconee Units 1, 2, and 3 to ensure that the CSP would be implemented and maintained consistent with NRC requirements.
On February 21, 2013, during a conversation between Ms. Judy Smith of your staff, and
Mr. Jigar Patel, NRC RII, our respective staffs confirmed arrangements for a three day information gathering onsite visit and a one-week onsite inspection. The subject TI inspection provides a programmatic level review and verification of the licensee's site-specific
implementation of Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for
the Interim Milestones 1 through 7 is as follows:
- Information gathering visit: May 7 - 9, 2013
- Onsite inspection: May 20 - 24, 2013
The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Oconee Nuclear Station Cyber
Security Program and plant layout; and (3) arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.
In order to assure a productive TI inspection, we have enclosed a request for documents
needed to ensure the inspectors are adequately prepared. These documents have been divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in planning for the TI inspection prior to the information gathering visit. It is requested that this
information be provided to the lead inspector via mail no later than April 10, 2013. Group II lists
information and possible areas for discussion necessary to assist the inspectors during the
TI inspection. It is requested this information be available during the information gathering visit (May 7, 2013). Group III consists of those items that the inspectors will review, or need access to, during the TI inspection. Group III also lists the information necessary to aid the inspectors
in tracking questions and answers identified as a result of the TI inspection. It is requested that
this information be provided to the lead inspector as the information is generated during the
TI inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office
of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
T. Preston Gillespie, Jr. 3
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component
of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,
/RA/ Michael F. King, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No.: 50-269, 50-270, 50-287 License No.: DPR-38, DPR-47, DPR-55
Enclosure: Document Request For Cyber Security Temporary
Instruction
(TI) 2201/004 Interim Milestones 1-7 Inspection
(OFFICIAL USE ONLY)
cc: (See page 4)
_________________________ x
G SUNSI REVIEW COMPLETE
G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE *RA RA RA NAME PATEL FANNER KING DATE 2/25/2013 2/25/2013 2/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
T. Preston Gillespie, Jr. 4
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
cc: Robert H. Guy
Organizational Effectiveness Manager
Oconee Nuclear Station
Duke Energy Corporation
7800 Rochester Highway
Seneca, SC 29672
Terry L. Patterson
Safety Assurance Manager
Duke Energy Corporation Oconee Nuclear Station
7800 Rochester Highway
Seneca, SC 29672
Kent Alter
Regulatory Compliance Manager Oconee Nuclear Station
Duke Energy Corporation
ON03RC
7800 Rochester Highway
Seneca, SC 29672
Terry W. King
Security Manager
Oconee Nuclear Station
Duke Energy Corporation
7800 Rochester Highway
Seneca, SC 29672
Daniel C. Durham
Security Safeguards Administrator
Oconee Nuclear Station Duke Energy Corporation
7800 Rochester Highway
Seneca, SC 29672
M. Christopher Nolan
Director - Regulatory Affairs
General Office
Duke Energy Corporation
P. O. Box 1006
526 S. Church Street
Charlotte, NC 28201-1006
David G. Black Fleet Security Manager
General Office
Duke Energy Corporation
P. O. Box 1006
526 S. Church Street
Charlotte, NC 28201-1006
Timothy J. Wadsworth
Security Specialist
General Office Duke Energy Corporation P. O. Box 1006
526 S. Church St., EC05P
Charlotte, NC 28201-1006
David A. Cummings Associate General Counsel
General Office
Duke Energy Corporation
P.O. Box 1006
526 S. Church St., EC07H
Charlotte, NC 28201-1006
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
Letter to T. Preston Gillespie, Jr. from Michael F. King dated February 27, 2013.
SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC