Letter Sequence Approval |
---|
|
|
MONTHYEARML14028A2562014-01-23023 January 2014 Response to Request for Clarifying Information Regarding Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage Project stage: Request ML14150A1372014-05-30030 May 2014 Review of the 2012 Steam Generator Tube Inspection Report Project stage: Approval 2014-01-23
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24003A9022024-01-0303 January 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 May 30, 2014
SUBJECT:
SURRY POWER STATION, UNIT NO.2, REVIEW OF THE 2012 STEAM GENERATOR TUBE INSPECTION REPORT (TAC NOS. MF1968)
Dear Mr. Heacock:
U.S. Nuclear Regulatory Commission (NRC) staff formally reviews all steam generator (SG) inservice inspection summary reports submitted by licensees in accordance with the plant's Technical Specification requirements.
By letter dated May 10, 2013 (Agencywide Documents Access Management System (ADAMS) Accession No. ML13149A229), Virginia Electric and Power Company (Dominion), the licensee, submitted information summarizing the results of the steam generator tube inspections performed during the 2012 refueling outage at Surry Power Station (SPS), Unit No.2. The licensee submitted additional information regarding the same inspections on January 23, 2014 (ADAMS Accession No. ML14028A256).
The NRC staff has completed its review of the submittals pertaining to the SPS, Units No.2, SG inspections, and the associated review summary is enclosed.
The NRC staff finds that the licensee has provided the information required by the TSs. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAGs are being closed. Please contact me at (301) 415-2597, if you have any questions regarding this issue. Docket Nos. 50-281
Enclosure:
As stated cc w/encl: Distribution via Listserv Sincerely, Dr. V. Sreenivas, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION REVIEW OF THE 2012 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNITS NO.2 DOCKET NOS. 50-281 By letter dated May 1 0, 2013 (Agencywide Documents Access Management System (ADAMS) Accession No. ML13149A229), Virginia Electric and Power Company (Dominion), the licensee, submitted information summarizing the results of the steam generator tube inspections performed 1 during the 2012 refueling outage at Surry Power Station (SPS), Unit No.2. The licensee submitted additional information regarding the same inspections on January 23, 2014 (ADAMS Accession No. ML14028A256).
Surry Power Station, Unit 2 has three Westinghouse model 51 F SGs. Each SG has 3,342 thermally treated Alloy 600 tubes with an outside diameter of 0.875 inches and a nominal wall thickness of 0.050 inches. The tubes are hydraulically expanded for the full depth of the tubesheet at each end. The tubes are supported by stainless steel support plates with quatrefoil-shaped holes. The U-bend region of the tubes installed in rows 1-8 was thermally
- treated after bending in order to reduce stress. The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (i.e., tube plugging) taken in response to the inspection findings.
The tubes in SG A were inspected this outage. After reviewing the information provided by the licensee, the staff has the following comments/observations:
The licensee indicated that the replacement SGs have operated for 301 .8 effective full power months since the first inservice inspection after installation.
Based on a review of the information provided, the staff concludes that the licensee provided the information required by their Technical Specifications.
In addition, the staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appearto be consistent with industry operating experience at similarly designed and operated units. Enclosure May 30, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT NO.2, REVIEW OF THE 2012 STEAM GENERATOR TUBE INSPECTION REPORT (TAC NOS. MF1968)
Dear Mr. Heacock:
The U.S. Nuclear Regulatory Commission (NRC) staff formally reviews all steam generator (SG) inservice inspection summary reports submitted by licensees in accordance with the plant's Technical Specification requirements.
By letter dated May 10, 2013 (Agencywide Documents Access Management System (ADAMS) Accession No. ML13149A229), Virginia Electric and Power Company (Dominion), the licensee, submitted information summarizing the results of the steam generator tube inspections performed during the 2012 refueling outage at Surry Power Station (SPS), Unit No.2. The licensee submitted additional information regarding the same inspections on January 23, 2014 (ADAMS Accession No. ML14028A256).
The NRC staff has completed its review of the submittals pertaining to the SPS, Units No. 2, SG inspections, and the associated review summary is enclosed.
The NRC staff finds that the licensee has provided the information required by the TSs. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAGs are being closed. Please contact me at (301) 415-2597, if you have any questions regarding this issue. Docket Nos. 50-281
Enclosure:
As stated cc w/encl: Distribution vfa Listserv DISTRIBUTION:
Public LPL2-1 R/F RidsAcrsAcnw_MaiiCTR Resource RidsNrrDorllpl2-1 Resource RidsNrrDssStsb Resource Resource ADAMS A ccess1on o.: 5 N ML141 OA13 7 OFFICE LPL2-1/PM LPL2-1/LA NAME VSreenivas SFigueroa*
DATE 05/30/14 05/30/14 Sincerely, /RAJ Dr. V. Sreenivas, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrDeEsgb Resource RidsNrrLASFigueroa Resource RidsOgcRp Resource RidsNrrPMNorthAnna Resource *B M 'jy DE/ESGB/BC LPL2-1/BC GKulesa* RPascarelli 02/06/14 05/30/14 OFFICIAL RECORD COPY AJohnson, NRR GKulesa, NRR KKarwoski, NRR emo b t d 02/06/2014 ae LPL2-1/PM VSreenivas 05/30/14'