MONTHYEARML14028A2562014-01-23023 January 2014 Response to Request for Clarifying Information Regarding Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage Project stage: Request ML14150A1372014-05-30030 May 2014 Review of the 2012 Steam Generator Tube Inspection Report Project stage: Approval 2014-01-23
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 23, 2014 U. S. Nuclear Regulatory Commission Serial No.: 13-237A Attention: Document Control Desk SPS-LIC/CGL: RO Washington, DC 20555-0001 Docket Nos.: 50-281 License Nos.: DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 RESPONSE TO REQUEST FOR CLARIFYING INFORMATION REGARDING STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR THE FALL 2012 REFUELING OUTAGE In a letter dated May 10, 2013 (Serial No.13-237), Virginia Electric and Power Company (Dominion) submitted information summarizing the results of steam generator (SG) tube inspections performed at Surry Power Station Unit 2 during the Fall 2012 refueling outage. In a September 17, 2013 e-mail from Ms. Karen Cotton Gross (NRC Project Manager) to Mr. Gary D. Miller (Dominion Corporate Licensing), the NRC staff requested clarifying information related to the SG inspections.
On January 13, 2014, an NRC - Dominion conference call was held to discuss the Dominion responses previously provided to the NRC. The NRC's questions and Dominion's responses are provided in the attachment to this letter.
If you have further questions or require additional information, please contact Ms. Candee Lovett at (757) 365-2178.
Sincerely, i) 1*'
N. L. Lane Site Vice President Surry Power Station Commitments contained in this letter: None
Attachment:
Response to NRC Request for Clarifying Information Regarding Fall 2012 Steam Generator Inservice Inspection Report - Surry Power Station Unit 2
Serial No. 13-237A Docket Nos. 50-281 Response to Request for Clarifying Information Regarding Unit 2 Fall 2012 SG Inservice Inspection Report Page 2 of 2 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Ms. K. R. Cotton Gross NRC Project Manager Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas NRC Project Manager North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
Serial No. 13-237A Docket Nos. 50-281 Response to Request for Clarifying Information Regarding Unit 2 Fall 2012 SG Inservice Inspection Report Attachment Response to NRC Request for Clarifying Information Regarding Fall 2012 Steam Generator Inservice Inspection Report -
Surry Power Station Unit 2 Virginia Electric and Power Company (Dominion)
Serial No. 13-237A Docket Nos. 50-281 Response to Request for Clarifying Information Regarding Unit 2 Fall 2012 SG Inservice Inspection Report Page 1 of 1 NRC Question 1 The report dated May 10, 2013, states that this was the second inspection in the 4 th inspection period and that the steam generatorshad operated for 301.8 effective full power months (EFPMs). The first, second, and third sequential inspection periods are
'120, 96, and 72 EFPMs with the first sequential inspection period beginning after the first inservice inspection. Assuming the first inspection took place after 13 EFPMs, this would mean that the steam generators have operated at least 301 EFPM. If this was the 2 nd inspection in the fourth sequential period, it would mean that 2 inspections were performed in a 0.8 EFPM interval. Please discuss how the current inspection period was determined.
Dominion Response The NRC question states that the first, second, and third inspection periods are 120 EFPM, 90 EFPM, and 72 EFPM, respectively. These inspection period durations are the current TS 6.4.Q.4.b requirements, which became effective on March 20, 2013 when TS Amendments 278/278 were implemented. TS Amendments 278/278 approved SG Program revisions in accordance with TSTF-510 Revision 2. Our request to adopt the TSTF-510 Program revisions was transmitted by letter Serial No.12-487, dated July 31, 2012, and TS Amendments 278/278 were issued on January 28, 2013.
Prior to the implementation of TS Amendments 278/278, the inspection period durations required by TS 6.4.Q.4.b for the first, second, and third inspection periods were 120 EFPM, 90 EFPM, and 60 EFPM, respectively. The SG inspections conducted during the Unit 2 Fall 2012 were the second of four scheduled for the 4 th inspection period, which was 60 EFPM. The shortest period between inspections for Unit 2 was 12.94 EFPM. Based on this clarification of the inspection period durations, the 301.8 EFPM value (since the first inservice inspection) is verified to be correct.
NRC Question 2 Please discuss the extent of the inspection and analysis of the array probe data collected within the tubesheet/expansion transitionregion.
Dominion Response During the Unit 2 Fall 2012 refueling outage, 100 percent of the tubes in both the hot leg and cold leg in SG "A" was examined with the array probe from either the baffle plate or the tube support plate to the tube end. Analysis excluded the area below the H-star depth of 17.89 inches in accordance with the alternate tube plugging criteria reflected in TS 6.4.Q.3.b. No issues were identified through the tubesheet/expansion transition region to the H-star depth.