MONTHYEARML24092A0422024-03-28028 March 2024 U.S. Geological Survey Triga Reactor Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 for 2023 ML23087A1012023-03-28028 March 2023 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML21090A1912021-03-29029 March 2021 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML20136A3362020-04-21021 April 2020 Us Dept. of Interior, Geological Survey (Usgs), Submittal of Corrected 2019 Annual Report ML20087H0192020-03-0202 March 2020 Us Dept of Interior, Geological Survey (USGS) - Submittal of 2019 Annual Report ML19044A3732019-01-31031 January 2019 Us Dept. of Interior, Geological Survey - Submittal of 2018 Annual Report ML18016A0512018-01-11011 January 2018 2017 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML17030A0362017-01-0909 January 2017 Us Dept. of the Interior, Geological Survey - Submittal of 2016 Annual Report ML16032A1662016-01-12012 January 2016 U.S. Geological Survey - Transmittal of 2015 Annual Report ML15043A0322015-02-0303 February 2015 Us Dept of Interior, Geological Survey - Submittal of 2014 Annual Report ML13037A1052013-01-24024 January 2013 U.S. Geological Survey Triga Non-Power Reactor Facility, 2012 Annual Report ML1104000232011-01-31031 January 2011 U. S. Geological Survey Triga Non-Power Reactor Annual Report - January 1, 2010 - December 31, 2010 ML1011701212010-04-19019 April 2010 Revision to the 2009 Annual Report ML1003303192010-01-25025 January 2010 U. S. Geological Survey Triga Non-Power Reactor Annual Report - January 1, 2009 - December 31, 2009 ML0902802312009-01-15015 January 2009 U.S. Geological Survey Triga Non-power Reactor Facility - 2008 Annual Report ML0802500232008-01-18018 January 2008 U.S. Geological Survey Trigra Reactor Annual Report for 2007 ML0510802622005-04-0808 April 2005 Letter Transmitting Replacement of the CY2003 Annual Report of the U.S. Geological Survey Triga non-power Reactor Facility ML0510504002005-04-0808 April 2005 U. S. Geological Survey Triga Reactor Annual Report January 1, 2003 - December 31, 2003 2024-03-28
[Table view] Category:Letter
MONTHYEARML24092A1542024-04-0404 April 2024 U.S. Geological Survey - Change of Facility Project Manager ML24092A0422024-03-28028 March 2024 U.S. Geological Survey Triga Reactor Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 for 2023 IR 05000274/20232022023-11-13013 November 2023 U.S. Geological - U.S. Nuclear Regulatory Commission Safety Inpsection Report No. 05000274/2023202 IR 05000274/20232032023-11-0909 November 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public) IR 05000274/20232012023-02-27027 February 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000274/2023201 ML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML22053A1872022-02-22022 February 2022 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Administrator Succession IR 05000274/20212022021-10-0101 October 2021 U.S. Geological U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000274/2021202 IR 05000274/20212032021-09-30030 September 2021 United States Geological Survey - Nuclear Regulatory Commission Security Inspection Report No. 05000274/2021203 IR 05000274/20202012021-04-21021 April 2021 United States Geological Survey, U.S. Nuclear Regulatory Commission Routine Inspection Report05000274/2020201 - Cover Letter and Enclosure ML21090A1912021-03-29029 March 2021 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML21082A2822021-03-23023 March 2021 Letter to R. Horton, USGS Denver Federal Center, from B. Smith, NRC, NRC Office of Investigations Report No. 4-2019-014 - Release of OI Synopsis IR 05000274/20212012021-03-12012 March 2021 U.S. Geological Survey NRC Non-Routine Inspection Report 05000274/2021201 ML20314A2922020-12-0303 December 2020 USGS Issuance of Amendment No. 14 to Renewed Facility Operating License No. R-113 for the USGS Triga Research Reactor Increasing the Special Nuclear Material Possession Limit ML20336A0202020-12-0101 December 2020 U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20310A2962020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 03 Provided in Resolution of Comments Presented by the State of Colorado During the Public M ML20310A3352020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Updated Physical Security Plan, Rev. Xxi ML20318A0882020-10-22022 October 2020 U.S. Geological Survey Trig a Reactor, License Amendment Request LAR 14, Supplemental Information Letter 01 Provided in Response to Audit Visit on 2020-10-15 Purpose ML20296A4902020-10-22022 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 02 Provided in Response to Audit Visit on 2020-10-15 ML20295A5102020-10-21021 October 2020 U.S. Geological Survey - Regulatory Audit Report Proposed License Amended No. 14 to Increase the Special Nuclear Material Possession Limit ML20233A9962020-10-0909 October 2020 Us Geological Survey - Issuance of Amendment No. 13 to Renewed Facility Operating License No. R-113 to Amend Technical Specifications 3.1.3 and 4.1 for the Us Geological Survey Triga Research Reactor ML20279A5912020-10-0606 October 2020 U.S. Geological Survey - Regulatory Audit Proposed License Amendment No. 14 Tt Increase the Special Nuclear Material Possession Limit ML20279A3052020-10-0505 October 2020 U.S. Geological Survey - Acceptance of the Application for Proposed License Amendment No. 14 Increase in the Special Nuclear Nuclear Material Possession Limit ML20275A2672020-10-0101 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-02, LAR 14, Rev. 00 ML20199M1672020-07-20020 July 2020 NRC Letter and SER Authorizing USGS to Use an Alternate A2 Value ML20183A1622020-07-0202 July 2020 U.S. Geological Survey - Acceptance of the Application for a License Amendment Exception to TS 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power Level Not Greater than 5 Kilowatts ML20177A6102020-06-25025 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Supplemental Information Provided in Response to ML20176A465 ML20161A1272020-06-0404 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Revision 01 ML20134J1082020-05-13013 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01 ML20157A0752020-05-0707 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Supervisor Appointment ML20136A3362020-04-21021 April 2020 Us Dept. of Interior, Geological Survey (Usgs), Submittal of Corrected 2019 Annual Report ML20134J1162020-04-10010 April 2020 7 of the Emergency Plan for the U.S. Geological Survey Triga Reactor (Gstr) Facility (License R-113, Docket 50-274) ML20087H0192020-03-0202 March 2020 Us Dept of Interior, Geological Survey (USGS) - Submittal of 2019 Annual Report ML19206A0622019-07-11011 July 2019 Us Dept of the Interior, Us Geological Survey Follow-Up on August 9, 2018 Letter Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 ML19066A0542019-02-25025 February 2019 U.S. Dept of the Interior, Geological Survey, Reply to a Notice of Violation: EA-18-031 and EA-18-111 ML19044A3732019-01-31031 January 2019 Us Dept. of Interior, Geological Survey - Submittal of 2018 Annual Report ML18354B1702018-12-31031 December 2018 U.S Geological Survey-Notice of Violation and Proposed Imposition of Civil Penalty ML18324A5752018-11-16016 November 2018 United States Geological Survey (Usgs), Transfer of Reactor Supervisor Responsibilities. Position of Reactor Supervisor for Triga Facility Has Been Transferred from Mr. Brycen Roy to Mr. Christopher Farwell, Effective October 26, on Interim ML18324A5742018-11-16016 November 2018 United States Department of the Interior - Transfer of Reactor Administrative Responsibilities ML18325A1462018-11-0707 November 2018 U.S. Dept. of Interior, Geological Survey - Response to Apparent Violations Associated with NRC Investigation Reports 4-2017-027 and 4-2018-005; IA-18-038 IR 05000274/20182022018-08-15015 August 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-274/2018-202 ML18236A5512018-08-0909 August 2018 Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 IR 05000274/20182032018-07-17017 July 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report 05000274/2018203 ML18016A0512018-01-11011 January 2018 2017 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML17355A1472017-12-18018 December 2017 Establishing a Quality Assurance Program at the U.S. Geological Survey Triga Reactor Facility (License R-113, Docket 50-274) IR 05000274/20172012017-05-17017 May 2017 United States Geological Survey NRC Routine Inspection Report No. 50-274/2017-201 ML17074A6472017-04-19019 April 2017 United States Geological Survey TRIGA Reactor Closure of Confirmatory Action Letter No. NRR-03-005 on Site-Specific Compensatory Measures Implementation Plan ML17067A3942017-03-22022 March 2017 U.S. Geological Survey - Non-Power Reactor Closeout of Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools," for the U.S. Geological Survey Training Reactor And Isotopes Production, General Atomics Research Reactor ML17046A3632017-02-17017 February 2017 Examination Report No. 50-274/OL-17-01, United States Geological Survey 2024-04-04
[Table view] |
Text
.USGS science for a changing world Department of the Interior US Geological Survey Box 25046 MS-974 Denver CO,. 80.225 February 3,2015 U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555
Dear NRC staff,
The 2014 annual report is herein submitted for the U.S. Geological Survey TRIGA non-power reactor facility.
This report is generated in compliance with our license conditions.
The facility docket number is 50-274.Sincerely, Timothy M. DeBe Reactor Supervisor Enclosure Copy to: Geoffrey Wertz OWFN 12 D20 U.S. GEOLOGICAL SURVEY TRIGA REACTOR ANNUAL REPORT JANUARY 1, 2014 -DECEMBER 31, 2014 NRC LICENSE No. R-113 DOCKET NO. 50-274 I. Personnel Changes: Michael Feller terminated his student employment on 8/14/2014.
I1. Operating Experience
'The Geological Survey TRIGA Reactor (GSTR),was in normal operation for the year 2014. No major facility changes were made during the year.A synopsis of irradiations'performed during the year is given below, listed by the organization submitting the samples to the reactor staff: Organization USGS -INAA USGS -Geochronology USGS -other Non-USGS Total Number of Samples 1349 626 46 3575 5596 A. Thermal power calibrations were performed in March, July, and September, with minor adjustments made to the instrumentation.
B. During the report period, 200 daily checklists and 12 monthly checklists were completed in compliance with technical specifications requirements for surveillance of the reactor facility.C. Tours were provided to individuals and groups during the year for a total visitor count of approximately 535. ..I III. Tabulation of Energy Generated
'Jan Feb Mar May June July Aug Sept Oct Nov Dec Totals MWh operated 47.895 12.021 52.129 60.067 49.585 42.333 20.636 67.567 22.724 95.055 28.322 51.583 549.917 Critical hours 51h 3m 14h 16m 54h 49m 62h 35m 52h 15m 44h 28m 24h 55m 70h 12m 25h 28m 104h 24m 36h 37m 53h 44m 594h 46m Pulses 0 0 0 0 0 0 0 0 0 1 4 0 5 IV. Unscheduled Shutdowns Number Date Cause 1.118 2/28/14 NPP high power; cause could not be identified 1119 5/7/14 NPP high power due to a nearby lightning strike and associated electrical noise.1120 12/23/14 Loss of control system communication due to UIT computer power supply failure.V. Significant Maintenance Operations 2/14 4/14 4/14 4/14 5/14 5/14.7/14 7/14 7/14 Replaced ion exchange resin and prefilter cartridges Replaced purification prefilter with activated carbon filters Replaced "rod down" and "drive up" limit switches on Shim 2 Replaced water temperature and fuel temperature Action Pak modules with universal signal conditioners, as approved by Reactor Committee Replaced lower pulley on cooling tower fan drive Replaced west sleeve bearing on cooling tower fan drive with a ball bearing Replaced all neoprene diaphragms in associated primary water system valves (one in purification system and two in primary piping of heat exchanger outlet)Replaced output, transistor on "failure" signal. line for RAM 10 Replaced ion exchange resin, 2 9/14. Removed CT from tank, cleaned and reinstalled 9/14 Moved control console to west wall-of.control room 10/14 Replaced main exhaust-motor 10/14 Replaced west bearing on cooling tower fan drive 11/14 Replaced piping on purification system from outlet of flow meter to tank discharge 12/14 Replaced UIT (control console) computer VI. Summary of 10 CFR 50.59 changes No 50.59 changes were made to the facility in CY 2014. Two activities were screened for 50.59 applicability and both were evaluated to not require a full 50.59 evaluation or NRC approval.VII. Radioactivity Releases A. Listed below are the total amounts of radioactive gaseous effluents released to the environment beyond the effective control of the reactor facility.Table 1. Gaseous Effluents Released to the Environment Month Argon-41 R-113 License Tritium -HTO IOCFR20 Allowable (mCi)
- Allowable P) (Ci) (mCi)January 0.494 5.833 0.00 124 February 0.370 5.833 0.10 124 March 0.599 5.833 0.00 124 April 1.184 5.833 0.13 124 May 2.175 5.833 0.17 124 June 2.359 5.833 0.00 124 July 1.227 5.833 0.03 __ 124 August 1.558 5.833 0.26 124 September 0.750 5.833 0.13 124 October 0.323 5.833 0.00 124 November 0.963 5.833 0.16 124 December 1.015 5.833 0.10 124 Total 13.017 70.00 1.08 1488% of Allowable
.18.60% 0.073%Note:. The tritium concentrations
'are estimates based on the amount of water lost by evaporation from the reactor multiplied by the concentration of tritium as HTO.Tritium sample analyses were performed by Test America Laboratories.
3 B. No liquid releases were made during calendar year, 2014. One 55-gallon drum of solid waste was shipped to Clive, Utah during the calendar year, 2014. Part of the waste in this drum was from the reactor facility.C. Throughout the year Na-24, Cr-51, Co-60, Ce-139, Ce-141, Au-198, Mn-56, Zn-65, Br-82, Br-82m, Br-80, and Br-80m were observed on the CAM filter analyses.The conservative estimated releases for these isotopes are in Table 2.Table 2. Releases of Other Isotopes in 2014.Isotope pCi pCi/ml 10 CFR 20 limits (uCiiml) % of limit Na-24 3.39E-02 2.28E-15 7.00E-09 3.26E-05 Cr-51 7.03E-04 4.72E-17 3.OOE-08 1.57E-07 Co-60 9.64E-05 6.48E-18 2.OOE-10 3.24E-06 Ce-139 4.01E-06 2.69E-19 9.00E-10 2.99E-08 Ce-141 1.64E-05 1.10E-18 8.0OE-10 1.37E-07 Au-198 4.16E-06 2.80E-19 2.OOE-09 1.40E-08 Mn-56 1.63E+00 1.09E-13 2.OOE-08 5.46E-04 Zn-65 4.96E-05 3.34E-18' 4.OOE-10 8.34E-07 Br-82 6.63E+01 4.45E-12 5.OOE-09 8.90E-02 Br-82m 8.18E+01 5.50E-12 1.OOE-09 5.50E-01 Br-80 9.91E+01 6.66E-12 3.OOE-07 2.22E-03 Br-80m 6.83E+01 4.59E-12 2.00E-08 2.29E-02 VIII. Radiation Monitoring Our program to monitor and control radiation exposures included the four major elements below during the operating year.1. Nineteen gamma-sensitive area monitors are located throughout the Nuclear Science Buildipj-.A remote readout panel is located in the reactor health physics office. High alarm set points range from 2 mR/hr to 50 mR/hr. High level alarms are very infrequent and due to sample movements.
- 2. One Continuous Air Monitor (CAM) does sampling of the air in the reactor bay.An equilibrium concentration of about 1.5 x 10-8 ýtCi/ml present for two minutes will result in an increase of about 500 cpm above background.
The alarm setpoints are a low-level alarm set at 3000 cpm (changed to 5000 cpm in October) and the high level alarm set at 10000 cpm. Reactorbay.air is sampled during all reactor operations.
The fixed particulate air filter is changed each week and counted on a HPGE gamma spectrometer counting system. The charcoal filter, fitted behind the. particulate air filter, is also changed and counted weekly. In all instances, sample data were less than airborne concentration values in 10 CFR Part 20, Appendix B, Table 2 for all particulate radioisotopes produced by the reactor.4 II 3. Contamination wipe surveys and radiation surveys with portable survey instruments are performed at least once a month. All portable instruments are.calibrated with a 3-Curie (initial activity)
Cs-1 37 source traceable to NBS, and wipes are counted on a Gamma Products G5000w low-level counting system. The highest removable contamination found was equal to 940.1 pCi/100 cm 2 beta-gamma, located in the reactor bay on the floor near the north wall, just east of the lead storage cave.This area was successfully decontaminated below MDA. The next highest removable contamination found was equal to 238.8 pCi/1 00 cm 2 beta-gamma, located in the reactor bay on the floor just south of the white table. No areas were greater than 4.4 pCi/1 00 cm 2 alpha contamination.
This area did not require decontamination.
The roof area over the reactor tank is roped off and posted as a radiation area (averaging 2.5 mR/hr) during 1 MW operations.
- 4. LiF TLD dosimeters were used at seven outdoor environmental stations.Reactor facility visitors are issued self-reading dosimeters.
Reactor staff personnel are issued beta, gamma, albedo neutron badges.Table 3. Personnel Monitoring Results (1211/12 -11/30/13)Whole Body (Rem) Whole Body (Rem)Employee code Deep Dose Equiv. Shallow Dose Equiv. Extremity (Rem)E0888 0.438 0.499 0.897 E0607 0.224 0.235 .0.925 E0707 0.511 0.635 1.147 E0908 0.170 0.568 0.760 E0712 0.033 0.033 0.070 E0614 0.000 0.000 0.000 Reactor visitors and occasional experimenters wore pocket dosimeters that resulted in no individual's reading that was greater than 1.0 mrem per a visit and no cumulative total greater than 4.5 mrem.Table 4. Environmental Dose Results Dose Dose Dose Dose Total Location Jan-Mar Apr-June July-Sept.
Oct.- Dec.(RAD) (RAD) (RAD) (RAD) (RAD)Exhaust Stack 0.093 0.053 0.041 0.055 0.242 Cooling Tower 0.000 0.000 0.000 0.000 0.000 Fence West Vehicle 0.036 0.017 0.000 0.000 0.053 Gate 5 West RoomI 11Gt 0.086 ..0.071 .,0.066 .0.076 0.223 151 Gate Southwest 0.000 0.000 0.000 ..0.000 0.000 Light Pole.Control badge 0.052 0.051 0.052 0.054 0.209 (background)
Southeast Souht 0.000 0.000, 0.000 0.000 0.000 Light Pole___ ____Rx Fence Loadinck 0.101 0.055 0.053 0.086 0.209 Loading Dock Note: Above totals have the background subtracted (see control badge). All TLDs were supplied and analyzed by Mirion Technologies.
X. Environmental Monitoring There were several isotopes detected on the CAM filters throughout the year resulting in very small releases of Na-24, Cr-51, Co-60, Ce-139, Ce-141, Au-198, Mn-56, Zn-65, Br-82, Br-82m, Br-80, and Br-80m through the normal air exhaust on the roof. The amounts released are shown in Table 2. Routine biennial environmental soil and water samples were taken in the summer of 2014. The soil samples were analyzed on high-purity germanium detectors.
The water samples were analyzed on a low background alpha/beta counter. No reactor produced-isotopes were found in the soil samples and all sample results are consistent with historical data.6