|
---|
Category:Letter
MONTHYEARIR 05000274/20232022023-11-13013 November 2023 U.S. Geological - U.S. Nuclear Regulatory Commission Safety Inpsection Report No. 05000274/2023202 IR 05000274/20232032023-11-0909 November 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public) IR 05000274/20232012023-02-27027 February 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000274/2023201 ML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML22053A1872022-02-22022 February 2022 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Administrator Succession IR 05000274/20212022021-10-0101 October 2021 U.S. Geological U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000274/2021202 IR 05000274/20212032021-09-30030 September 2021 United States Geological Survey - Nuclear Regulatory Commission Security Inspection Report No. 05000274/2021203 IR 05000274/20202012021-04-21021 April 2021 United States Geological Survey, U.S. Nuclear Regulatory Commission Routine Inspection Report05000274/2020201 - Cover Letter and Enclosure ML21090A1912021-03-29029 March 2021 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML21082A2822021-03-23023 March 2021 Letter to R. Horton, USGS Denver Federal Center, from B. Smith, NRC, NRC Office of Investigations Report No. 4-2019-014 - Release of OI Synopsis IR 05000274/20212012021-03-12012 March 2021 U.S. Geological Survey NRC Non-Routine Inspection Report 05000274/2021201 ML20314A2922020-12-0303 December 2020 USGS Issuance of Amendment No. 14 to Renewed Facility Operating License No. R-113 for the USGS Triga Research Reactor Increasing the Special Nuclear Material Possession Limit ML20336A0202020-12-0101 December 2020 U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20310A3352020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Updated Physical Security Plan, Rev. Xxi ML20310A2962020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 03 Provided in Resolution of Comments Presented by the State of Colorado During the Public M ML20296A4902020-10-22022 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 02 Provided in Response to Audit Visit on 2020-10-15 ML20318A0882020-10-22022 October 2020 U.S. Geological Survey Trig a Reactor, License Amendment Request LAR 14, Supplemental Information Letter 01 Provided in Response to Audit Visit on 2020-10-15 Purpose ML20295A5102020-10-21021 October 2020 U.S. Geological Survey - Regulatory Audit Report Proposed License Amended No. 14 to Increase the Special Nuclear Material Possession Limit ML20233A9962020-10-0909 October 2020 Us Geological Survey - Issuance of Amendment No. 13 to Renewed Facility Operating License No. R-113 to Amend Technical Specifications 3.1.3 and 4.1 for the Us Geological Survey Triga Research Reactor ML20279A5912020-10-0606 October 2020 U.S. Geological Survey - Regulatory Audit Proposed License Amendment No. 14 Tt Increase the Special Nuclear Material Possession Limit ML20279A3052020-10-0505 October 2020 U.S. Geological Survey - Acceptance of the Application for Proposed License Amendment No. 14 Increase in the Special Nuclear Nuclear Material Possession Limit ML20275A2672020-10-0101 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-02, LAR 14, Rev. 00 ML20199M1672020-07-20020 July 2020 NRC Letter and SER Authorizing USGS to Use an Alternate A2 Value ML20183A1622020-07-0202 July 2020 U.S. Geological Survey - Acceptance of the Application for a License Amendment Exception to TS 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power Level Not Greater than 5 Kilowatts ML20177A6102020-06-25025 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Supplemental Information Provided in Response to ML20176A465 ML20161A1272020-06-0404 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Revision 01 ML20134J1082020-05-13013 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01 ML20157A0752020-05-0707 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Supervisor Appointment ML20136A3362020-04-21021 April 2020 Us Dept. of Interior, Geological Survey (Usgs), Submittal of Corrected 2019 Annual Report ML20134J1162020-04-10010 April 2020 7 of the Emergency Plan for the U.S. Geological Survey Triga Reactor (Gstr) Facility (License R-113, Docket 50-274) ML20087H0192020-03-0202 March 2020 Us Dept of Interior, Geological Survey (USGS) - Submittal of 2019 Annual Report ML19206A0622019-07-11011 July 2019 Us Dept of the Interior, Us Geological Survey Follow-Up on August 9, 2018 Letter Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 ML19066A0542019-02-25025 February 2019 U.S. Dept of the Interior, Geological Survey, Reply to a Notice of Violation: EA-18-031 and EA-18-111 ML19044A3732019-01-31031 January 2019 Us Dept. of Interior, Geological Survey - Submittal of 2018 Annual Report ML18354B1702018-12-31031 December 2018 U.S Geological Survey-Notice of Violation and Proposed Imposition of Civil Penalty ML18324A5752018-11-16016 November 2018 United States Geological Survey (Usgs), Transfer of Reactor Supervisor Responsibilities. Position of Reactor Supervisor for Triga Facility Has Been Transferred from Mr. Brycen Roy to Mr. Christopher Farwell, Effective October 26, on Interim ML18324A5742018-11-16016 November 2018 United States Department of the Interior - Transfer of Reactor Administrative Responsibilities ML18325A1462018-11-0707 November 2018 U.S. Dept. of Interior, Geological Survey - Response to Apparent Violations Associated with NRC Investigation Reports 4-2017-027 and 4-2018-005; IA-18-038 IR 05000274/20182022018-08-15015 August 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-274/2018-202 ML18236A5512018-08-0909 August 2018 Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 IR 05000274/20182032018-07-17017 July 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report 05000274/2018203 ML18016A0512018-01-11011 January 2018 2017 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML17355A1472017-12-18018 December 2017 Establishing a Quality Assurance Program at the U.S. Geological Survey Triga Reactor Facility (License R-113, Docket 50-274) IR 05000274/20172012017-05-17017 May 2017 United States Geological Survey NRC Routine Inspection Report No. 50-274/2017-201 ML17074A6472017-04-19019 April 2017 United States Geological Survey TRIGA Reactor Closure of Confirmatory Action Letter No. NRR-03-005 on Site-Specific Compensatory Measures Implementation Plan ML17067A3942017-03-22022 March 2017 U.S. Geological Survey - Non-Power Reactor Closeout of Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools," for the U.S. Geological Survey Training Reactor And Isotopes Production, General Atomics Research Reactor ML17046A3632017-02-17017 February 2017 Examination Report No. 50-274/OL-17-01, United States Geological Survey ML17030A0362017-01-0909 January 2017 Us Dept. of the Interior, Geological Survey - Submittal of 2016 Annual Report ML16326A1462016-12-0101 December 2016 Us Geological Survey - Amendment No. 11 to Indemnity Agreement Amendment No. D-10 2023-02-27
[Table view] Category:License-Operator
MONTHYEARML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML17046A3632017-02-17017 February 2017 Examination Report No. 50-274/OL-17-01, United States Geological Survey ML16319A2322016-11-23023 November 2016 Examination Confirmation Letter, No. 50-274/OL-17-01, United States Geological Survey ML1017205542010-06-24024 June 2010 Initial Examination Results Letter No. 50-274/OL-10-02, U. S. Geological Survey Triga Reactor ML1001914172010-01-22022 January 2010 Initial Examination Results Letter No. 50-274/OL-10-01, U.S. Geological Survey Triga Reactor ML0908303592009-03-26026 March 2009 Initial Examination Results Letter No. 50-274/OL-09-01, U.S. Geological Survey Triga Reactor ML0908302672009-03-26026 March 2009 Initial Examination Report No. 50-274/OL-09-01, U.S. Geological Survey Triga Reactor ML0800805402008-01-0909 January 2008 Corporate Notification Letter, 50-274/OL-08-01, U.S. Geological Survey ML0619402772006-07-25025 July 2006 Initial Examination Results Letter, No. 50-274/OL-06-01, U.S. Geological Survey ML0423903622004-09-0202 September 2004 Initial Examination Results Letter No. 50-274/OL-04-01, U.S. Geological Survey ML0416602232004-06-16016 June 2004 Initial Examination Corporation Notification Letter No. 50-274/OL-04-01 2022-03-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML17046A3632017-02-17017 February 2017 Examination Report No. 50-274/OL-17-01, United States Geological Survey ML16319A2322016-11-23023 November 2016 Examination Confirmation Letter, No. 50-274/OL-17-01, United States Geological Survey ML1017205542010-06-24024 June 2010 Initial Examination Results Letter No. 50-274/OL-10-02, U. S. Geological Survey Triga Reactor ML1001914172010-01-22022 January 2010 Initial Examination Results Letter No. 50-274/OL-10-01, U.S. Geological Survey Triga Reactor ML0908303592009-03-26026 March 2009 Initial Examination Results Letter No. 50-274/OL-09-01, U.S. Geological Survey Triga Reactor ML0908302672009-03-26026 March 2009 Initial Examination Report No. 50-274/OL-09-01, U.S. Geological Survey Triga Reactor ML0800805402008-01-0909 January 2008 Corporate Notification Letter, 50-274/OL-08-01, U.S. Geological Survey ML0619402772006-07-25025 July 2006 Initial Examination Results Letter, No. 50-274/OL-06-01, U.S. Geological Survey ML0423903622004-09-0202 September 2004 Initial Examination Results Letter No. 50-274/OL-04-01, U.S. Geological Survey ML0416602232004-06-16016 June 2004 Initial Examination Corporation Notification Letter No. 50-274/OL-04-01 2022-03-07
[Table view] |
Text
February 17, 2017 Mr. Brycen Roy, Reactor Manager United States Geological Survey Box 25046, MS974 Denver, CO 80225
SUBJECT:
EXAMINATION REPORT NO. 50-274/OL-17-01, UNITED STATES GEOLOGICAL SURVEY
Dear Mr. Roy:
During the week of January 23, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your United States Geological Survey reactor (USGS). The examinations were conducted according to NUREG-1478, Operator Licensing Examiner Standards for Research and Test Reactors, Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Ms. Michele DeSouza at (301) 415-0747 or via internet e-mail Michele.DeSouza@nrc.gov.
Sincerely,
/RA/
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-274
Enclosure:
Examination Report No. 50-274/OL-17-01 cc: w/o enclosures: See next page
B. Roy EXAMINATION REPORT NO. 50-274/OL-17-01, UNITED STATES GEOLOGICAL SURVEY, DATED FEBRUARY 17, 2017 DISTRIBUTION AMendiola AAdams GWertz GMorlang ADAMS ACCESSION #: ML17046A363 TEMPLATE #:NRR-079 OFFICE NRR/DPR/PROB:CE NRR/DPR/PROB:OLA NRR/DPR/PROB:BC NAME MDeSouza ABaxter AMendiola DATE 02/14/2017 02/16/2017 02/17/2017 OFFICIAL RECORD COPY
United States Geological Survey Docket No. 50-274 cc:
Brian Nielsen Environmental Services Manager 480 S. Allison Pkwy.
Lakewood, CO 80226 Steve Tarlton State of Colorado Radiation Management Program HMWM-RM-B2 4300 Cherry Creek Drive South Denver, CO 80246 Brycen Roy, Reactor Supervisor U.S. Geological Survey P.O. Box 25046 - Mail Stop 974 Denver Federal Center Denver, CO 80225 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.: 50-274/OL-17-01 FACILITY DOCKET NO.: 50-274 FACILITY LICENSE NO.: R-113 FACILITY: USGS EXAMINATION DATES: January 24, 2017 SUBMITTED BY: ________/RA/________________ 02/14/2017 Michele DeSouza, Chief Examiner Date
SUMMARY
During the week of January 23, 2017, the NRC administered an operator licensing examination to one Senior Reactor Operator-Upgrade (SROU) candidate. The Senior Reactor Operator candidate passed all applicable portions of the examination.
REPORT DETAILS
- 1. Examiner: Michele DeSouza, Chief Examiner, NRC
- 2. Results:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 0/0 0/0 0/0 Operating Tests 0/0 1/0 1/0 Overall 0/0 1/0 1/0
- 3. Exit Meeting:
Michele C. DeSouza, Chief Examiner, NRC Brycen Roy, USGS Reactor Manager Upon completion of the examination, the NRC Examiner met with facility staff representatives to discuss the results. At the conclusion of the meeting, the NRC examiner thanked the facility for their support in the administration of the examination.
ENCLOSURE 1