UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 5, 2020 Mr. Robert Horton, Reactor Administrator U.S. Geological Survey Denver Federal Center P.O. Box 25046, MS 911 Denver, CO 80225-0046
SUBJECT:
U.S. GEOLOGICAL SURVEY - ACCEPTANCE OF THE APPLICATION FOR PROPOSED LICENSE AMENDMENT NO. 14 RE: INCREASE IN THE SPECIAL NUCLEAR MATERIAL POSSESSION LIMIT (EPID L-2020-LLA-0201)
Dear Mr. Horton:
By letter dated October 1, 2020 (Agencywide Documents Access and Management System Accession No. ML20275A267), U.S. Geological Survey (USGS) staff applied for an amendment to Facility Operating License No. R-113 for the USGS TRIGA Research Reactor. The license amendment request (LAR) proposes to increase the special nuclear material possession limit of the license to receive, possess, but not use or separate, in connection with the operation of the facility, up to 4 kilograms of contained uranium-235 enriched to less than 20 percent in the form of TRIGA-type reactor fuel.
Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, an application to amend the license (including the technical specifications) must fully describe the changes desired and follow, as far as applicable, the form prescribed for original applications. The requirements in 10 CFR Section 50.34, Contents of applications; technical information, cover the technical information to be included in the application and stipulate that it addresses design and operating characteristics, unusual or novel design features, and principal safety considerations.
The U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of the LAR and concluded that it includes sufficient information for the NRC staff to begin its detailed technical review. Notwithstanding the acceptance review, the NRC staff may require additional information to complete the detailed technical review. If needed, the NRC staff will request this information by separate correspondence within approximately 30 days of the date of this letter.
Based on the acceptance review, the NRC staff expects to complete its review and make a final determination on the LAR by December 31, 2020. The NRC staff understands the need for this LAR to be issued by the end of the current calendar year and will attempt to ensure that this occurs. This date could change due to several factors, including requests for additional information, unanticipated changes to the scope of the review, unsolicited supplements to the LAR, and others. If the forecasted date changes, the NRC staff will notify you in writing of the new date and an explanation of the reason for the change.
If you have any questions, please contact me at (301) 415-0893, or by electronic mail at Geoffrey.Wertz@nrc.gov.
Sincerely,
/RA/
Geoffrey A. Wertz, Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-274 License No. R-113 cc: See next page
U.S. Geological Survey Docket No. 50-274 cc:
Brian Nielsen Environmental Services Manager 480 South Allison Parkway Lakewood, CO 80226 Steve Tarlton State of Colorado Radiation Management Program HMWM-RM-B2 4300 Cherry Creek Drive South Denver, CO 80246 Jonathan Wallick, Reactor Supervisor U.S. Geological Survey P.O. Box 25046, MS 974 Denver Federal Center Denver, CO 80225 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept. of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115
- concurred via email NRR-106 OFFICE NRR/DANU/UNPL/PM*
NRR/DANU/UNPL/LA*
NRR/DANU/UNPL/BC*
NRR/DANU/UNPL/PM*
NAME GWertz NParker GCasto GWertz DATE 10/5/2020 10/5/2020 10/5/2020 10/5/2020