|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24303A2212024-10-29029 October 2024 NEI SDP Realism Presentation for October 30, 2024 Public Meeting ML24291A0062024-10-17017 October 2024 NEI Slide Presentation: ACRS Regulatory Policies and Practices - Draft White Paper on Nth-of-a-Kind (Noak) Micro-Reactor Licensing and Deployment Considerations - Sc - October 17, 2024 ML24267A0032024-09-25025 September 2024 NEI Slides for ROP Public Meeting Sept 2024 ML24263A2592024-09-17017 September 2024 06 Jim Slider NEI September 2024 NRC Ai Public Workshop 09-17-2024 ML24249A2012024-09-0909 September 2024 NEI Presentation - Sept 9 Public Meeting - Flooding DGs - Final ML24249A1152024-09-0505 September 2024 Power Uprate September 5, 2024 Public Meeting Slides ML24243A1612024-08-30030 August 2024 Slide Presentations for High Burnup (Hbu) Workshop V ML24228A2102024-08-20020 August 2024 2024 NEI Early Warning System (EWS) Presentation - NEI Slides ML24229A0012024-08-19019 August 2024 NEI - Spent Fuel Management: Safety and Efficiency Improvements Through Technology and Performance Margins - NRC PIRTs Public Meeting Rev. 8.15.2024 Final ML24218A1832024-07-30030 July 2024 NEI 7-30-24 Trial Use RG 1.247 Path Forward Final ML24172A1952024-06-27027 June 2024 NEI Slides for 06-27-2024 Public Meeting Structures as IROFS at Fuel Cycle Facilities ML24178A0372024-06-26026 June 2024 NRC Power Uprate Review Preparation June 26, 2024 Public Meeting Slides ML24164A1972024-06-17017 June 2024 Public Meeting Slides - NRC Staff Comments and Observations on NEI 10-01, Rev 2 Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit ML24129A1382024-05-0808 May 2024 NEI Slides on Centralized Inspections for May 9, 2024 Public Workshop ML24103A1532024-04-12012 April 2024 NEI Supplemental Information on NRC Comments of NEI 20-07 Rev E (Non-Proprietary) - Slides ML24088A2252024-03-26026 March 2024 NEI Slides for Centralized Inspections March 2024 ROP Public Meeting ML24075A2092024-03-14014 March 2024 NEI Advanced Reactor Di&C Task Force Slides - Accident Monitoring Instrumentation ML24075A2102024-03-14014 March 2024 NEI Alan Campbell Slides - Non-Safety-Related with Special Treatment – Digital Considerations ML24086A5342024-03-14014 March 2024 RIC 2024 TH23 Slides - the Industry’S Innovation Imperative ML24067A0062024-03-0808 March 2024 1 - NRC - Workshop3 - Non-LOCA Release Fractions Feedback - Final ML24067A0072024-03-0808 March 2024 2 - NRC - Workshop3 - Non-LOCA - FFRD - Final ML24067A0092024-03-0808 March 2024 3 - NRC - Worshop3 - CR Dose Presentation - Final ML24067A0102024-03-0808 March 2024 4 - NRC - Workshop3 - EQ Presentation - Final ML24067A0122024-03-0808 March 2024 6 - NRC - Workshop3 - Best Estimate Dose ML24067A0132024-03-0808 March 2024 7 - NRC - Workshop3 - Closing Remarks ML24067A2882024-03-0808 March 2024 1 (Revised)-NRC_Workshop3_Non-LOCA Release Fraction Feedback-Final ML24043A1162024-02-13013 February 2024 3- EQ Presentation Workshop 2 ML24043A1192024-02-13013 February 2024 1- Impacts on RG 1.183 for Workshop2 ML24043A1202024-02-13013 February 2024 2- CR Dose Presentation Workshop 2 ML24016A2372024-01-17017 January 2024 NEI Environmental Reviews Slides Public Meeting 1-17-24 ML24008A0442024-01-0909 January 2024 NEI - Slides for NRC Workshop 1 on Revision to RG 1.183 R1 - Final - ML24008A044 ML23342A0262023-12-14014 December 2023 December 14, 2023, Presentation on NEI 23-01 Operator Cold Licensing Training Plan for Advanced Nuclear Reactors ML23347A1782023-12-13013 December 2023 12-14 NEI EPRI Presentation NRC Public Meeting 16-03 R1 ML23303A1922023-10-30030 October 2023 NEI Slides for SLR Public Meeting - Oct 31 2023 ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23258A1992023-09-20020 September 2023 NEI 99-02 Draft Rev. 8 Update for Sept 2023 ROP Public Meeting ML23242A0782023-08-30030 August 2023 Hbu Workshop IV Industry Presentation: Drive to Deploy ATF with Increased Enrichment and Higher Burnup ML23230A0142023-08-22022 August 2023 Industry Slide Presentation for 8-22-23 Meeting on ARCAP-TICAP and DG-1404 Guidance Documents ML23191A0632023-07-0707 July 2023 NEI Cybersecurity Presentation for July 2023 ROP Public Meeting ML23191A0662023-07-0707 July 2023 NEI 99-02 Draft Rev. 8 Update for July 2023 ROP Public Meeting ML23160A1512023-06-15015 June 2023 25 - Industry - Industry Perspectives on ASME III and XI Pre-Service Inspection ML23160A1422023-06-15015 June 2023 20 - Industry - Industry Perspective on Performance Monitoring ML23116A1892023-05-31031 May 2023 Industry Observations of NRC Licensing Program (NEI Slides May 2023) ML23136A5912023-05-18018 May 2023 NEI Safety Culture Presentation for May 2023 ROP Public Meeting ML23125A3192023-05-0909 May 2023 NEI Presentation for May 9, 2023, Public Meeting on NEI 22-05, Revision a ML23115A0302023-04-27027 April 2023 NEI Perspective on Performance Monitoring in Use of Probabilistic Fracture Mechanics for Optimizing Inspections of Non-RPV Pressure Vessels, April 27, 2023 ML23088A0822023-03-30030 March 2023 NEI Presentation - March 30, 2023 PRA Configuration Control Public Meeting ML23082A0572023-03-28028 March 2023 Proposal to Establish Alternate Requirements for Components Commensurate with Safety and Risk ML23079A2642023-03-23023 March 2023 General Visual Examination of Containment Surfaces Covered by Insulation - March 23, 2023 Public Meeting Slides from NEI ML23210A0042023-03-15015 March 2023 Destination: Termination, NRC Regulatory Information Conference 2024-09-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24303A2212024-10-29029 October 2024 NEI SDP Realism Presentation for October 30, 2024 Public Meeting ML24291A0062024-10-17017 October 2024 NEI Slide Presentation: ACRS Regulatory Policies and Practices - Draft White Paper on Nth-of-a-Kind (Noak) Micro-Reactor Licensing and Deployment Considerations - Sc - October 17, 2024 ML24267A0032024-09-25025 September 2024 NEI Slides for ROP Public Meeting Sept 2024 ML24263A2592024-09-17017 September 2024 06 Jim Slider NEI September 2024 NRC Ai Public Workshop 09-17-2024 ML24249A2012024-09-0909 September 2024 NEI Presentation - Sept 9 Public Meeting - Flooding DGs - Final ML24249A1152024-09-0505 September 2024 Power Uprate September 5, 2024 Public Meeting Slides ML24243A1612024-08-30030 August 2024 Slide Presentations for High Burnup (Hbu) Workshop V ML24228A2102024-08-20020 August 2024 2024 NEI Early Warning System (EWS) Presentation - NEI Slides ML24229A0012024-08-19019 August 2024 NEI - Spent Fuel Management: Safety and Efficiency Improvements Through Technology and Performance Margins - NRC PIRTs Public Meeting Rev. 8.15.2024 Final ML24218A1832024-07-30030 July 2024 NEI 7-30-24 Trial Use RG 1.247 Path Forward Final ML24197A0652024-07-17017 July 2024 SDP Realism Public Meeting NEI Presentation ML24172A1952024-06-27027 June 2024 NEI Slides for 06-27-2024 Public Meeting Structures as IROFS at Fuel Cycle Facilities ML24178A0372024-06-26026 June 2024 NRC Power Uprate Review Preparation June 26, 2024 Public Meeting Slides ML24164A1972024-06-17017 June 2024 Public Meeting Slides - NRC Staff Comments and Observations on NEI 10-01, Rev 2 Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit ML24130A1972024-05-0909 May 2024 NEI Presentation Slides on Rapid and Large-Scale Nuclear Reactor Deployments for Remote Industrial Applications - May 14 2024 Public Meeting ML24129A1382024-05-0808 May 2024 NEI Slides on Centralized Inspections for May 9, 2024 Public Workshop ML24114A1142024-04-18018 April 2024 NEI Supplemental Information on NRC Comments on NEI 20-07, Draft Revision E - April 18 Meeting (Non-Proprietary) ML24103A1532024-04-12012 April 2024 NEI Supplemental Information on NRC Comments of NEI 20-07 Rev E (Non-Proprietary) - Slides ML24092A3132024-04-0303 April 2024 Public Mtg_2024-04-03 Pre-submittal Meeting with the Nuclear Energy Institute (NEI) to Discuss an Update to NEI 03-12, Security Plan Template (Revision 8)_NEI Slides ML24088A2252024-03-26026 March 2024 NEI Slides for Centralized Inspections March 2024 ROP Public Meeting ML24075A2092024-03-14014 March 2024 NEI Advanced Reactor Di&C Task Force Slides - Accident Monitoring Instrumentation ML24075A2102024-03-14014 March 2024 NEI Alan Campbell Slides - Non-Safety-Related with Special Treatment – Digital Considerations ML24082A1792024-03-14014 March 2024 RIC-2024 TH18 True Slides ML24086A5342024-03-14014 March 2024 RIC 2024 TH23 Slides - the Industry’S Innovation Imperative ML24067A2592024-03-13013 March 2024 RIC-2024 W14 Slides - NEI-BHoltzman an Industry Perspective on Advanced Reactor Construction Oversight ML24067A0062024-03-0808 March 2024 1 - NRC - Workshop3 - Non-LOCA Release Fractions Feedback - Final ML24067A0072024-03-0808 March 2024 2 - NRC - Workshop3 - Non-LOCA - FFRD - Final ML24067A0092024-03-0808 March 2024 3 - NRC - Worshop3 - CR Dose Presentation - Final ML24067A0102024-03-0808 March 2024 4 - NRC - Workshop3 - EQ Presentation - Final ML24067A0122024-03-0808 March 2024 6 - NRC - Workshop3 - Best Estimate Dose ML24067A0132024-03-0808 March 2024 7 - NRC - Workshop3 - Closing Remarks ML24067A2882024-03-0808 March 2024 1 (Revised)-NRC_Workshop3_Non-LOCA Release Fraction Feedback-Final ML24043A1162024-02-13013 February 2024 3- EQ Presentation Workshop 2 ML24043A1192024-02-13013 February 2024 1- Impacts on RG 1.183 for Workshop2 ML24043A1202024-02-13013 February 2024 2- CR Dose Presentation Workshop 2 ML24016A2372024-01-17017 January 2024 NEI Environmental Reviews Slides Public Meeting 1-17-24 ML24010A0202024-01-11011 January 2024 Public Meeting on SLR Efficiencies - NEI Presentation ML24008A0442024-01-0909 January 2024 NEI - Slides for NRC Workshop 1 on Revision to RG 1.183 R1 - Final - ML24008A044 ML23342A0262023-12-14014 December 2023 December 14, 2023, Presentation on NEI 23-01 Operator Cold Licensing Training Plan for Advanced Nuclear Reactors ML23347A1782023-12-13013 December 2023 12-14 NEI EPRI Presentation NRC Public Meeting 16-03 R1 ML23303A1922023-10-30030 October 2023 NEI Slides for SLR Public Meeting - Oct 31 2023 ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23261C3792023-09-27027 September 2023 NEI 22-04 Pre-Submittal Meeting with NRC - September 27, 2023 ML23258A1992023-09-20020 September 2023 NEI 99-02 Draft Rev. 8 Update for Sept 2023 ROP Public Meeting ML23242A0782023-08-30030 August 2023 Hbu Workshop IV Industry Presentation: Drive to Deploy ATF with Increased Enrichment and Higher Burnup ML23242A1662023-08-30030 August 2023 the Future of Nuclear Power: 2023 Baseline Survey (Slides) ML23230A0142023-08-22022 August 2023 Industry Slide Presentation for 8-22-23 Meeting on ARCAP-TICAP and DG-1404 Guidance Documents ML23228A0042023-08-18018 August 2023 NEI Slides for Public Meeting to Discuss Possible Efficiencies on the Subsequent License Renewal Review - August 18, 2023 ML23191A0162023-07-11011 July 2023 NEI Comments on Risk-Informed Process for Evaluation (RIPE) DORL TSG - 7/11/23 Public Meeting Slides from NEI ML23191A0632023-07-0707 July 2023 NEI Cybersecurity Presentation for July 2023 ROP Public Meeting 2024-09-09
[Table view] |
Text
Review of'Operational Programs in a, Combined License Application
-,z NRh REG CoV June 8, 2005 1: 'Agenda* Goals and Objectives for Combined License Operational Program Review,* Background
- Proposed Approach for- Combined License Operational Program Review* Key Challenges for Review of Operational Programs* Challenges with Operational Program Implementation
- Changes to Safety Analysis Report after COL is Issued* Some Suggested NRC Processes Which may Mitigate Challenges
- Range of ImplementationdOptions to Address Concerns* Option 2: Informative License Condition* Illustrative Example: Radiation Protection 2
__ I a ML.Goals and Objectives for?Combined License Operational Program Review*Include acceptable implementation of operational programs as part of the combined license* Ensure that key elements of operational programs are included in the safety analysis report to allow the NRC to make a reasonable assurance finding on the operational program when the combined license is issued* For programs which do not have inspections, tests, analyses, and acceptance criteria, ensure that these programs and their implementation are fully described in the safety analysis report* Ensure that operational programs can be inspected by the NRC prior to implementation
3 Background
0**I Operational Programs Included in SECY-02-0067
> Originally identified in NEI letter dated May 14, 2001 U U U U U U U Emergency planning Quality Assurance Radiation Protection Fitness for Duty .Licensed Operator Containrment Leak Rate Testing Inservice Inspection and Inservice Testing* Physical Security* Fire Protection
- Maintenance Rule* Equipment Qualification
- SRM-SECY-02-0067 endorsed inspections, tests, analyses, and acceptance criteria (ITAAC) for emergency planning 4 Background (continued)
- SRM-SECY-02-0067 stated the following:
Although the NRC inspe'ction process does not replace a particular ITAAC, an ITAAC should not be necessa'ry if the program and its implementation are fully'described in'the application and found to be' acceptable by the NRC -at the COL [combined license] stage. The burden is' on the applicant to provide the necessary and sufficient programmatic information for approval of the COL without ITAAC 5 -, Background (continued)
SRM-SECY-04-0032 provided additional clarification:
'fully described' should be understood to mean that the program is clearly and sufficiently described in terms of the scopeiand level of detail to allow a reasonable assurance finding of acceptability.
Required programs should always be described at a functional level'and at an increased level of detail where implementation choices could materially and negatively affect the program effectiveness and acceptability.
-6
---IJIL-+ Rto 4. Proposed Approach for Combined License Operational Program Review* COL application would contain the following related to operational programs: Safety Analysis Report (SAR) level information
> Additional information for operational programs'where implementation choices could materially and negatively affect the program effectiveness and acceptability
- Discussion of the applicant's implementation plans, including schedule* NRC final safety evaluation report to include staff evaluation of operational programs* COL to include, where necessary, license conditions on implementation of operational programs, as described in the SAR (i.e., for programs that will not be implemented at the time the COL is issued)7^RtO>~ Proposed Approach for' Combined License Operational , Program Review (continued)
- Approach consistent with current process of including license conditions in renewed operating licenses* Approach assumes that operational programs do not need ITAAC unless'the' staff determines that an implementation issue is inseparable from the finding on program acceptability, and an ITAAC is necessary* COL applicants may propose ITAAC for implementation of any operational program* Program must be fully described in SAR in order for NRC to make a reasonable assurance finding 8 Key Challenges for Review of Operational Programs Make a reasonable assurance finding on an operational program before a plant is constructed and operated> SAR needs to include level of detail sufficient to make a reasonable assurance finding ..* No inspection, tests, analyses, acceptance criteria (ITAAC) needed if program and its implementation can be fully described Ensure that the key elements of the operational program used by NRC to make reasonable assurance finding are included in the implementation of the operational program* Assurance provided by inspection of operational program prior to implementation 9*QOR REQb@4 z u Challenges with Operational Program Implementation
- Time period between COL issuance and program implementation
> Could be several years after license is issued 10 '
LJIL-0t Changes to SAR after COL is Issued* Allowed by 10. CFR 50.54 or 50.59* Periodic reporting requirements to NRC* Current regulations do not account for fact that will have final SAR years before a plant is built and operated 11 Some Suggested NRC Controls D Which May Mitigate Challenges
- Controls on changes to operational program descriptions in SARs after COL is issued* Timely exchange of information on changes to SARs that impact operational programs* Ability to perform inspections of operational programs prior to implementation
- Process to resolve findings from these operational program inspections 12 Range of Implementation
/ Options to Address Concerns Option 1: Restrictive License Condition Changes in SAR on operational program information will require NRC approval until operational program fully implemented
('Tier 2* for Operational Programs")
Requires NRC notification prior to operational program implementation
- Verification of acceptable
.-operational program implementation in license* Ensures that key elements of operational program remain in SAR until program implemented I ' a Restrictive , Increased burden on NRC to.'review any changes* Program and its implementation remain fully described* NRC informed of operational program implementation in preparation for inspection 13 Range of Implementation Options to Address Concerns (continued)
- Option 2: Informative License Condition Requires NRC notification prior~to operational program implementation
' Licensee submits most recent SAR changes related to operational programs since'last report to NRC * Verification of acceptable operational program implementation in license* Allows NRC to review changes in timely manner to ensure that key elements of operational program supporting reasonable assurance finding have not been removed from SAR before implementation,--,.-
- Allows NRC to review changes to ensure program and its implementation remain fully described before implementation
- NRC informed of operational program implementation in preparation for inspection
- No restrictions on I changes ..* NRC only reviews changes prior to implementation of-operational program I WI fi RE014 Range of Implementation
' Options to Address Concerns (continued)
- Option 3: No License Condition> Implementation of operational programs only discussed in SAR* No requirements for licensee to submit information or inform NRC of operational program implementation
- Verification of acceptable operational program implementation not in license* No regulatory means to ensure that key elements supporting reasonable assurance finding remain in SAR when program implemented
- Program and its implementation may no longer be fully described when implemented
- No assurance that inspection may be performed before program is implemented
- No restrictions on changes* NRC only reviews changes after required periodic updates submitted 15 Option 2: 5 Informative License Condition (continued)
License Condition Implementation:
- Notify NRC when program is about to be implemented
- Provide NRC with changes to SAR since last update required by 10 CFR 50.71 (e) that impact the operational program being implemented
- Condition ends on specific operational program when either Commission provides authorization to load fuel or program required to be fully implemented Purpose:* Ensure that program is implemented as described in SAR* Ensure that SAR fully describes operational program and its implementation
- Ensure that key elements used to reach reasonable assurance finding on operational program at COL remain in place* Allow sufficient time to schedule and prepare for NRC inspection of operational program prior to implementation 16
&,E4' Option 2: , Informative License Condition (continued)
Attributes:
- Licensee informs NRC that a operational program will be implemented in X months* Licensee provides any additional changes to SAR implemented after last change report required by 1 0 CFR 50.71 (e), which are related to the operational program, X months before implementation
- For programs with phased implementation, licensee reports on implementation milestone and relevant 10 CFR 50.71 (e) reports X months before that phase of operational program is implemented 17 o / Illustrative Example NEt 04-01, Section 4.3.9.12: FSAR Chapter 12, Radiation Protection
- Example Health Physics Program Description
> Example taken from current operating plant FSAR Inadequate information to review radiation protection operational program in COL application
- Parallel effort currently underway to work with NEI to modify this section in NEI 04-01* Need to ensure that all operational programs described in SAR receive this level of consideration by COL applicants 18