EPID:L-2018-LLA-0229, License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... (Approved, Closed) |
|
MONTHYEARML18235A1992018-08-23023 August 2018 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... Project stage: Request ML18274A2392018-10-0101 October 2018 Acceptance of Requested Licensing Action Re Amendment to Completion Times for Offsite Circuit, CREVS, and Crets to 14 Days Project stage: Acceptance Review ML18302A3572018-10-29029 October 2018 Request for Additional Information Regarding Extending Completion Times to 14 Days Project stage: RAI ML18316A0342018-11-12012 November 2018 Response to Request for Additional Information: Proposed Changes to Technical Specification 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to 14 ... Project stage: Response to RAI ML18334A0732018-11-30030 November 2018 Supplement to License Amendment Request: Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to 14 Days Project stage: Supplement ML18365A3732019-01-22022 January 2019 Issuance of Amendment Nos. 328 and 306 to Extend Completion Time of Required Action D.3 of Technical Specification 3.8.1 to 14 Days Project stage: Approval 2018-11-12
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A 2024-09-06
[Table view] |
Text
200 Exelon Way Exelon Generation Kennett Square. PA 19348 www.exeloncorp.com November 30, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRG Docket Nos. 50-317 and 50-318 10 CFR 50.90
Subject:
Supplement to License Amendment Request -Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days
References:
- 1) License Amendment Request -Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days, dated August 23, 2018. (ML 18235A 199) 2) Calvert Cliffs Nuclear Power Plant, Units 1 and 2 -Request for Additional Information Regarding Extending Completion Times to 14 Days (EPID L-2018-LLA-0229), dated October 29, 2018. (ML 18302A357)
- 3) Response to Additional Information Response Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days, dated November 12, 2018. (Ml 18316A034)
- 4) Calvert Cliffs Nuclear Power Plant, Units 1 and 2 -Issuance of Amendment Nos. 326 and 304 to Add Risk-Informed Completion Time Program (EPID L-2016-LLA-0001
), dated October 30, 2018. (Ml 18270A 130) By letter dated August 23, 2018 (Reference 1 ), Exelon Generation Company, LLC (Exelon) submitted changes to the Technical Specifications (TS), Appendix A of Operating License Nos. DPR-53 and DPR-69 for Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2, respectively.
Specifically, Exelon requested two one-time use extensions to TS 3.8.1 (AC Operating)
Actions A.3 and 0.3 Completion Times (CTs) for an inoperable offsite circuit from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to fourteen (14) days in order to allow for the future installation and tie in of a new 13 kV service transformer during the 2019 Unit 2 Refuel Outage and the 2020 Unit 1 Refuel Outage.
U.S. Nuclear Regulatory Commission Supplement-Withdraw of proposed TS 3.8.1 Actions A.3 Docket Nos. 50-317 and 50-318 November 30, 2018 Page2 The NRC staff reviewed the information provided and identified the need for additional information to complete their evaluation of the amendment request. The final request for additional information (RAI) was sent from the NRC to Exelon by electronic mail message on October 29, 2018 (Reference 2). By letter dated November 12, 2018 (Reference
- 3) Exelon responded to NRC RAI to facilitate the NRC technical review. Since the issuance of TS Amendment Nos. 326 and 304 to add a Risk-Informed Completion Time Program (Reference
- 4) the TS 3.8.1.A.3 Action is now a risk informed completion time. An adequate risk evaluation can be performed under an Exelon controlled program to extend the CT for an inoperable offsite circuit to support the Electrical Distribution Reliability Improvement Project (EDRIP). Therefore, the proposed change to TS 3.8.1.A.3 CT is no longer required.
Via this letter Exelon withdraws the proposed change to TS 3.8.1 (AC Operating)
Action. A.3 CT for an inoperable offsite circuit from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to fourteen (14) days. The proposed change to TS 3.8.1 (AC Sources-Operating)
Action D.3 remains valid and in effect. In addition, a minor correction should be noted that the Attachments 3 and 4 banner pages in Reference 3 should reflect Calvert Cliffs Nuclear Power Plant. Exelon has reviewed the information supporting a finding of No Significant Hazards Consideration provided to the NRC in Reference 1 and determined that the information provided in this supplement letter does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration.
Furthermore, the information provided in this supplement letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
No regulatory commitments are contained in this letter. If you have any questions or require additional information, please contact Frank Mascitelli at 610-765-5512.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 30 1 h day of November 2018. -/ ' 6 f.A-A-,*J l David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC U.S. Nuclear Regulatory Commission Supplement-Withdraw of proposed TS 3.8.1 Actions A.3 Docket Nos. 50-317 and 50-318 November 30, 2018 Page3 cc: USNRC Region I, Regional Administrator USNRC Project Manager, CCNPP USNRC Senior Resident Inspector, CCNPP D. A. Tancabel, State of Maryland