Category:Letter
MONTHYEARML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-158, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 L-24-157, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-114, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation L-24-115, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-198, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0707 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 2024-09-17
[Table view] |
Text
FENOC Beaver Valley Power Station"P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 April 28, 2009 L-09-119 10 CFR 50.55a ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit No. 1 BV-1 Docket No. 50-334, License No. DPR-66 10 CFR 50.55a Request Number BV1-IWE-2-2 In accordance with the provisions of 10 CFR 50.55a(a)(3)(i), the FirstEnergy Nuclear Operating Company (FENOC) hereby requests Nuclear Regulatory Commission (NRC)approval of a proposed alternative for implementation during the current Beaver Valley Power Station (BVPS) Unit No. 1 maintenance and refueling outage (1R19). FENOC proposes a visual examination (VT-1) of the containment liner pressure boundary repair weld as an alternative to the detailed visual examination requirement of ASME Code Section Xl, sub-article IWE-5240 during the pressure test. The details of the alternative are described in the enclosure.
There are no regulatory commitments contained in this letter. FENOC requests approval of the proposed alternative by May 4, 2009 to support restart from BVPS Unit No. 1 maintenance and refueling outage (1 R1 9). If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-761-6071.
Sincerely, Peter P. Sena III
Enclosure:
10 CFR 50.55a Request Number BV1-IWE-2-2, Revision 0 cc: NRC Region I Administrator NRC Senior Resident Inspector NRC Project Manager Director BRP/DEP 4bLq BRP/DEP Site Representative L-09-119 Enclosure 10CFR 50.55a Request Number BV1-IWE-2-2, Revision 0 Proposed Alternative provides an acceptable level of quality and safety in accordance with 10 CFR 50.55a(a)(3)(i) 1.0 ASME CODE COMPONENTS AFFECTED The affected component for this request is the Beaver Valley Power Station (BVPS) Unit No. 1 containment liner. The containment liner is not an American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) pressure vessel.However, the containment liner is included in the BVPS Unit No. 1 ASME Code Section XI Inservice Inspection (ISI) program and Section Xl Repair/Replacement Program.2.0 APPLICABLE CODE ADDITION AND ADDENDA ASME Code Section XI, 2001 Edition, 2003 Addenda.3.0 APPLICABLE CODE REQUIREMENTS Article IWE-5000, "System Pressure Tests," sub-article IWE-5240, "Visual Examination," states: During the pressure test required by IWE-5220, a detailed visual examination (IWE-2310) shall be performed on areas affected by repair/replacement activities.
4.0 REASON
FOR REQUEST During the 2009 maintenance and refueling outage for BVPS Unit No. 1, a scheduled examination of the containment liner plate identified a surface defect on the containment side of the painted surface of the containment liner plate. Subsequent surface cleaning revealed the surface defect as a through-wall hole in the containment liner plate. The shape of the through-wall hole was rectangular, approximately 1 inch long and 3/8 inch high. Repairs include removing the degraded portion of the liner plate and welding a replacement plate in place. Following the repairs a pneumatic leakage test is required in accordance with sub-article IWE-5221.A local leak rate test is planned to be performed on the repaired area. The local leak rate test requires the use of a test rig. However, the test rig will make the areas affected by the repair activities inaccessible during the local leak rate test. The outside surface of the repair area is covered with concrete.Relief is requested from the direct visual examination requirement specified in sub-article IWE-5240 during the leakage test required by sub-article IWE-5221.
L-09-119 Enclosure Page 2 of 2 5.0 PROPOSED ALTERNATIVE AND BASIS FOR USE In accordance with 10 CFR 50.55a(a)(3)(i), FENOC requests approval of an alternative to the detailed visual examination requirement of ASME Code Section X1, sub-article IWE-5240 during the pressure test. FENOC proposes to perform a visual examination (VT-1) of the affected area both prior to and following the local leak rate test.Visual examination (VT-i) prior to the performance of the local leak rate testing provides assurance that the affected area has been properly prepared for testing and no abnormalities exist in the affected area. The local leak rate test will provide an accurate and direct method of assuring the leak-tight integrity of the repair welds. Post leak rate test visual examination (VT-I) provides assurance that the tested area is free of abnormalities that may be exposed by the local leak rate test.The required nondestructive examinations of the repair will provide additional assurance of the integrity of the repair welds. The proposed visual examination (VT-i) provides an adequate level of quality and safety prior to and following the local leak rate test even though the concrete side of the repair area is not accessible.
6.0 DURATION
OF PROPOSED ALTERNATIVE The proposed alternative is requested in support of containment liner repairs made during the current BVPS Unit No. 1 maintenance and refueling outage (1R19).