L-14-107, Davis-Besse Nuclear Power Station - Core Operating Limits Report, Cycle 19

From kanterella
Revision as of 08:35, 16 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Davis-Besse Nuclear Power Station - Core Operating Limits Report, Cycle 19
ML14108A311
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/18/2014
From: Lieb R A
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-14-107
Download: ML14108A311 (25)


Text

FENOC-FirstEnergy Nuctearlirating Company55Al North State Route 2Oak Harbor, Ohio 43449 419-321-7676nqnd A Lbb , Fax: 41gn1-7ffi2 Vi co Prcsi dent, ^lrclear April 18, 2014 L-14-107 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Core Operatinq Limits Report, Cvcle 19 Pursuant to the requirements of Davis-Besse Nuclear Power Station (DBNPS)Technical Specification 5.6,3,'CORE OPERATING LIMITS REPORT (COLR)," FirstEnergy Nuclear Operating Company hereby submits the DBNPS Cycle 19 COLR,Revision 0.

There are no regulatory commitments contained in this submittal. lf there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 315-6810.Sincerely, Ua#/Raymbnd A. Lieb

Enclosure:

FirstEnergy Nuclear Operating Company, Davis-Besse Unit 1, Cycle 19, Core Operating Limits Report, Revision 0cc: NRC Region lllAdministrator NRC Resident InspectorNRC Project Manager Utility Radiological Safety Board