ML16350A191

From kanterella
Revision as of 00:06, 8 November 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

2016/12/15 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Regarding Alternative Source Term, TSTF-448-A, and TSTF-312-A (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919)
ML16350A191
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/15/2016
From: Shawn Williams
Plant Licensing Branch II
To: McElroy G K
Southern Nuclear Operating Co
References
MF8861, MF8862, MF8916, MF8917, MF8918, MF8919
Download: ML16350A191 (3)


Text

1 NRR-PMDAPEm Resource From:Williams, Shawn Sent: Thursday, December 15, 2016 10:23 AM To: 'gkmcelro@southernco.com' Cc: Coleman, Jamie Marquess

Subject:

Joseph M. Farley, Units 1 and 2 - Acceptan ce of Requested Licensing Action regarding Alternative Source Term, TSTF-448-A, and TSTF-312-A (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919)

Dear Mr. McElroy,

By letter dated November 22, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16336A024), the Southern Nuclear Operating Company, Inc., (SNC) submitted an amendment request to revise the Joseph M. Farley Nuclear Plant, Unit 1 and Unit 2, (FNP) Technical Specifications (TS). Specifically, SNC requested to: 1. Revise the licensing basis to support a selected scope application of an Alternative Source Term (AST) methodology (MF8861, MF8862); 2. Incorporate Techni cal Specification Task Force (TSTF)Traveler, TSTF-448-A, Revision 3, "Control Room Habitability" (MF8916, MF8917); and,

3. Incorporate TSTF-312-A, "Administrative Control of Containment Penetrations" (MF8918, MF8919).

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

Based on the information provided in your submittal and discussions during the pre-licensing meeting on September 22, 2016 (ADAMS Accession No. ML16237A061), the NRC staff has estimated that this licensing request will take approximately 1,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC 2advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-1009.

Shawn Williams, Senior Project Manager Plant Licensing Branch II-1

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-348 and 50-364 Hearing Identifier: NRR_PMDA Email Number: 3217 Mail Envelope Properties (2b21419e53bf4fa684d85212b8dec7f1)

Subject:

Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action regarding Alternative Source Term, TSTF-448-A, and TSTF-312-A (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919)

Sent Date: 12/15/2016 10:22:56 AM Received Date: 12/15/2016 10:22:57 AM From: Williams, Shawn Created By: Shawn.Williams@nrc.gov

Recipients: "Coleman, Jamie Marquess" <JAMIEMCO@SOUTHERNCO.COM> Tracking Status: None "'gkmcelro@southernco.com'" <gkmcelro@southernco.com> Tracking Status: None

Post Office: HQPWMSMRS06.nrc.gov Files Size Date & Time MESSAGE 4071 12/15/2016 10:22:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: