MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
I I I Jon A. Franke Site Vice President PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jfranke@pplweb.com
\ \ I I I \***/ ,' ****** # ... * * *" KAY 0 62013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED RELIEF REQUEST NO. 3RR-20 TO THE THIRD 10-YEAR INSERVICE INSPECTION PROGRAM FOR SUSQUEHANNA SES UNIT 2 PLA-7014 Docket No. 50-388 The purpose of this letter is to request relief pursuant to the requirements of 10 CFR 50.55a(a)(3)(ii) from the provisions of the ASME Section XI, 1998 Edition, 2000 Addenda, Code Category B-G-1, Item B6.190, Examination ofPump Flange surfaces when disassembled.
In accordance with the ASME Code, a one-inch annular surface surrounding each stud on the pump flange surface must be visually examined (VT -1) when the pump is disassembled.
PPL Susquehanna, LLC (PPL) hereby requests relief for Susquehanna Steam Electric Station (SSES) Unit 2, to deviate from the requirement to perform a 1 00% visual examination of the 'A' Reactor Recirculation Pump Flange surface. During the current SSES Unit 2 16th Refueling and Inspection Outage, the 'A' Reactor Recirculation pump was disassembled for a pump motor replacement.
As a result of the missed opportunity to perform a visual examination (VT -1) of the pump flange when it was disassembled, a 1 00% visual examination of the required pump flange surface could not be performed.
As discussed during the May 2, 2013 conference call between PPL and the Nuclear Regulatory Commission (NRC), the ability to perform the VT -1 examination was no longer a viable option because the 'A' Reactor Recirculation pump had been reassembled.
Following the conference call, discussions with the SSES Engineering staff revealed that there was an opportunity to perform a partial examination of the flange surface. A qualified visual (VT -1) inspector was dispatched and the flange surface was inspected. No discontinuities or imperfections were identified.
Because the pump had been reassembled, examination coverage of the flange surface was limited to approximately 98% of the required surface due to interference from pump internals.
Since this inspect i on was not a 100% visual examination of the pump flange surface, PPL will list it as a limited examination. ' TM Document Control Desk PLA-7014 PPL requests that this relief request be approved by May 14, 2013 in order to support the SSES Unit 2 16th Refuel Outage startup. Please contact Mr. John Tripoli, Manager-Nuclear Regulatory Affairs at ( 570) 542-3100 if there are any questions concerning this letter. This letter contains no regulatory commitments.
Sincerely, Franke Attachment 1: PPL Susquehanna, LLC Third 10-Year Interval Request for Relief No. 3RR20 Attachment 2: Photos of the 'A' Recirculation Pump Flange Stud Area Attachment 3: Photo of the 'A' Recirculation Pump Sectional Drawing Copy: NRC Regional Administrator
-Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PA DEP/BRP Attachment 1 to PLA-7014 PPL Susquehanna, LLC Third 10-Year Interval Request for Relief No. 3RR20 Attachment to PLA-7014 Page 1 of2 PPL SUSQUEHANNA, LLC SUSQUEHANNA SES, UNIT 2 THIRD 10-YEARINTERVAL REQUEST FOR RELIEF NO. 3RR20 SYSTEM/COMPONENT (S) FOR WHICH RELIEF IS REQUESTED The Unit 2 'A' Reactor Recirculation Pump Flange CODE REQUIREMENTS The 1998 Edition thru the 2000 Addenda of ASME Section XI, Table IWB-2500-1, Category B-G-1, Item B6 .190, requires a visual (VT -1) examination of a one-inch annular surface of the pump flange surrounding each stud when the connection is disassembled.
PPL Susquehanna, LLC (PPL) Susquehanna Steam Electric Station (SSES) Unit 2 is in the third period of the third inspection interval.
This is the last Unit 2 outage in the third ten-year inspection interval.
RELIEF REQUESTED Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii) from the provisions of Table IWB-2500-1, Category B-G-1, Item B6.190 Pump Flange Surface Examinations.
BASIS FOR RELIEF Table IWB-2500-1, Examination Category B-G-1, Item B6.190 requires a VT-1 visual examination of a one inch annular surface of the pump flange surface surrounding each stud when the pump is disassembled.
The SSES Unit 2 'A' Reactor Recirculation pump was disassembled during the Unit 2 16th Refuel and Inspection Outage (U2-16RIO).
During the time the pump was disassembled, a VT-3 of the pump bowl was performed.
However, the required VT -1 examination (examination for discontinuities) of the flange surface was not performed.
This omission was not recognized until the pump had been reassembled.
Originally, PPL reported that access to this area of the pump was not available.
After discussions with the SSES engineering staff, a qualified visual inspector was dispatched, and a VT -1 examination was performed on the pump flange surface. Since the pump was reassembled prior to this examination being performed, interferences from the pump internals limited the examination of the flange to approximately 98%. To obtain a 100% visual examination of the pump flange surface, the pump would have to be disassembled.
PPL estimates that disassembly of the pump would require an additional4500 man-hours of time with an expected dose of 12.4 person-rem.
The flange surface is acceptable for continued service based on upon the satisfactory results of a Attachment to PLA-7014 Page 2 of2 surface inspection that was performed by the pump vendor and SSES Quality Control personnel prior to pump reassembly.
No evidence of degradation was noted. Although the examinations were not VT -1 qualified, and not credited for ASME credit, it adds additional assurance that the flange surface (including the 2% of the flange surface that was not accessible) is acceptable for continued service. PPL will also perform at VT -2 examination on the pump prior to startup of Unit 2. ALTERNATIVE EXAMINATIONS None IMPLEMENTATION SCHEDULE PPL requests that this relief request be approved by May 14, 2013 in order to support the SSES Unit 2 16th Refuel Outage startup.
Attachment 2 to PLA-7014 Photos of the 'A' Recirculation Pump Flange Stud Area
Attachment 3 to PLA-7014 Photo of the 'A' Recirculation Pump Sectional Drawing Unit 2 'A' Recirculation Pump Sectional Drawing-Top of the Bottom Flange Surface