ML110410160

From kanterella
Revision as of 04:37, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2011/01/20 Diablo Canyon Lr - Draft Agenda for ACRS Subcomitte Meeting
ML110410160
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/20/2011
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML110410160 (4)


Text

DiabloCanyonNPEm Resource From: Sizemore, Brandy [BNSM@pge.com]

Sent: Thursday, January 20, 2011 7:37 PM To: Ferrer, Nathaniel Cc: Grebel, Terence; Sharp, Loren

Subject:

RE: Draft Agenda for ACRS Subcomitte Meeting Attachments: Draft Agenda 02-09 (3).doc

Hello, Attached is the proposed topics of discussion and the list of speakers.

Thanks Brandy Sizemore From: Grebel, Terence Sent: Thursday, January 20, 2011 4:31 PM To: Sizemore, Brandy

Subject:

FW: Draft Agenda for ACRS Subcomitte Meeting From: Ferrer, Nathaniel [1]

Sent: Friday, January 07, 2011 10:43 AM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource

Subject:

Draft Agenda for ACRS Subcomitte Meeting

Terry, Attached is the draft of the Agenda for the ACRS Subcommittee Meeting for DCPP License Renwal. Please note the bulleted topics are just examples, being used as placeholders. Please provide feeback regarding your proposed topics of discussion, and the list of speakers.

Thank you, Nathaniel Ferrer Project Manager Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4151045 1

Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2517 Mail Envelope Properties (D776CF09EA15C644831E2FD16142395602B065B4)

Subject:

RE: Draft Agenda for ACRS Subcomitte Meeting Sent Date: 1/20/2011 7:36:37 PM Received Date: 1/20/2011 7:36:40 PM From: Sizemore, Brandy Created By: BNSM@pge.com Recipients:

"Grebel, Terence" <TLG1@pge.com>

Tracking Status: None "Sharp, Loren" <LDSL@PGE.COM>

Tracking Status: None "Ferrer, Nathaniel" <Nathaniel.Ferrer@nrc.gov>

Tracking Status: None Post Office: exchange18.Utility.pge.com Files Size Date & Time MESSAGE 1001 1/20/2011 7:36:40 PM Draft Agenda 02-09 (3).doc 50752 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Plant License Renewal Subcommittee Meeting Diablo Canyon Power Plant February 9, 2011 Rockville, MD

- Proposed Agenda -

Cognizant Staff Engineer: Michael Benson, michael.benson@nrc.gov, (301) 415-6396 Topics Presenters Time Opening Remarks Dennis Bley, ACRS 1:30 pm - 1:35 pm Staff Introduction NRR 1:35 pm - 1:40 pm PG&E Company - Diablo Canyon Power Plant Introductions Jim Becker Site and Station Description Plant History and Major Improvements Loren Sharp License Renewal Application Overview Terry Grebel Open and Confirmatory Items Overview Flux Thimble Tube Inspection Program Mike Wright (Open Item) 1:40 pm - 3:00 pm Flaw Growth Evaluation for RHR (Open Item) Dave Gonzalez Scoping and Screening (Open Items)

Dave Miklush Buried Piping and Tanks Inspection Program (Open Item)

TLAA Identification (Open Item) Michelle Albright Metal Fatigue (Open Item)

Break 3:00 pm - 3:15 pm NRC Staff SER Overview Scoping and Screening Results Nathaniel Ferrer, NRR 3:15 am - 4:35 pm Onsite Inspection Results Region IV Aging Management Review Time Limited Aging Analyses Subcommittee Discussion Dennis Bley, ACRS 4:35 pm - 5:00 pm

NOTE:

During the meeting, 301-415-7360 should be used to contact anyone in the ACRS Office.

Presentation time should not exceed 50 percent of the total time allocated for a given item.

The remaining 50 percent of the time is reserved for discussion.

Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.

One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.