|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 2024-09-04
[Table view] |
Text
1NRR-PMDAPEm ResourceFrom:Dave Lochbaum [DLochbaum@ucsusa.org]Sent:Tuesday, October 16, 2012 12:50 PMTo:Feintuch, KarlCc:Frankl, Istvan; Ring, Mark; Haeg, Lucas; Murray, Robert
Subject:
RE: Public Comment - RE: Proposed refueling plan at Duane Arnold - Action taken regarding your comment
Dear Mr. Feintuch:
Sorry for the delay getting back to you.
I have reviewed the safety evaluation report issued by the NRC with the Duane Arnold license amendment, particularly Section 6.0 that you called my attention to. I appreciate the NRC specifically addressing the three questions I posed in my email. I am satisfied by those reponses and appreciate, again, the NRC looking into the issues and taking the time and effort to address them.
Thanks, Dave Lochbaum UCS From: Feintuch, Karl [Karl.Feintuch@nrc.gov] Sent: Thursday, September 27, 2012 5:59 PM To: Dave Lochbaum Cc: Frankl, Istvan; Ring, Mark; Haeg, Lucas; Murray, Robert
Subject:
Public Comment - RE: Proposed refueling plan at Duane Arnold - Action taken regarding your comment
Dear Mr. Lochbaum:
The purpose of this message is to provide you with the results of our processing of your email message to me dated Friday, August 10, 2012 9:11 AM. Your message (reproduced below) was entered into ADAMS as ML12226A165. For convenience a courtesy copy of ML12226A165 is attached. You raised concerns about a licensing action whose evaluation was in process. To give it full consideration on its technical merit, your message was provided to the cognizant technical Reviewers, who responded in detail to your numbered concerns (items 1), 2), and 3) in your message below). The technical responses to your numbered concerns, along with the full text of your message below, were inserted into the draft Safety Evaluation being prepared by NRC staff. Your comments and the Reviewer responses contributed to the weight of evidence applied by NRC staff in arriving at its decision regarding the request by NextEra Energy Duane Arnold, LLC (the licensee for Duane Arnold Energy Center). Today, September 27, 2012, the NRC issued License Amendment No. 283 to the Renewed Facility Operating License for Duane Arnold Energy Center. The associated ADAMS Accession Number for the issued amendment is ML12249A317. Your message and the NRC staff response are in Section 6.0 of the issued Safety Evaluation contained in our amendment letter. Although the issued amendment is profiled as publically available, there is a short administrative delay caused by the process for releasing documents until the general public is able to access available documents in ADAMS. A courtesy copy of the issued amendment is attached.
2 Thank you for communicating your concerns to me. This message describes in detail how we ensured that your information was brought to the attention of the cognizant NRC staff who participated in the decision on the action about which you commented. Sincerely, Karl D. Feintuch Project Manager United States Nuclear Regulatory Commission NRR/DORL/LPL3-1 301-415-3079 Karl.Feintuch@nrc.gov From: Dave Lochbaum [1] Sent: Friday, August 10, 2012 9:11 AM To: Feintuch, Karl Cc: Leeds, Eric; Witte, Ulrich; Casto, Chuck
Subject:
Proposed refueling plan at Duane Arnold Hello Mr. Feintuch:
Ulrich Witte, a colleague and friend, brought to my attention the correspondence exchange between the Duane Arnold licensee and the NRC (e.g., ADAMS Accession Nos. ML121000327, ML12179A299, ML12209A420, ML12122A212, and ML12199A130). The licensee wants to apply a protective coating to the inside surface of the torus at Duane Arnold during the upcoming refueling outage 23 (RFO 23). Doing so requires draining water from the torus and preventing water entering the torus during the work activities.
The licensee proposes to rely on one train of the core spray system to satisfy reactor core cooling regulatory requirements during this work. But core spray normally takes suction from the torus and its minimum flow recirculation line returns water to the torus. The licensee proposes to realign this core spray subsystem to take suction from the condensate storage tank and to disable the minimum flow recirculation function.
In reviewing the available materials regarding this proposal, I was unable to find answers to the following questions:
- 1) Why doesn't the licensee offload the entire reactor core to the spent fuel pool prior to and throughout the torus activities? Doing so would eliminate the need for the core spray subsystem. Has this licensee placed schedule (i.e., shorter refueling outages) ahead of safety?
- 2) Has the seismic risk from core spray using suction from the condensate storage tank vice the torus been evaluated? I have never worked at Duane Arnold, but I've worked at several boiling water reactors similar in design to it. The condensate storage tank - the normal suction for the high pressure coolant injection and reactor core isolation cooling systems and alternate suction for the core spray and residual heat removal systems - is typically not credited in safety studies because of the challenge in seismically qualifying the condensate storage tank and its associated piping. Here, the licensee proposes to swap the torus - a more seismically robust source -to the condensate storage tank - a more seismically fragile source - without apparently justifying that margin reduction.
- 33) What about reactor vessel pressurization events during the torus work? The licensee provided incomplete justification for its proposal to eliminate the minimum flow recirculation function for the core spray pump during the proposed torus outage. The licensee's justification argued that reactor vessel pressure is always below the core spray injection valve opening pressure setpoint during Modes 4 and 5, thus providing complete assurance that this valve will open in time to prevent damage to the core spray pump from operation at no or low flow conditions. But that logic is simply not reflected in the BWR/4 Standard Technical Specifications (STS) and their bases issued by the NRC staff in April 2012 (ML12104A192 and ML12104A193). Minimum flow recirculation is required for the core spray pumps in Modes 4 and 5 in the STS. The flaw in the licensee's logic is that a loss of shutdown cooling could cause the reactor vessel pressure to increase above the opening pressure setpoint for the core spray injection valve. Last year's tragedy at Fukushima vividly illustrated the consequences from reactor vessel pressure being higher than the discharge pressure of makeup sources. The proposal by the licensee sets the stage for replicating elements of that disaster: (1) shutdown cooling is lost, (2) the ensuing heatup of the reactor vessel water increases the reactor vessel pressure above the injection valve's opening setpoint, and (3) the solitary core spray pump dead-heads until it is irrevocably damaged.
UCS urges the NRC staff not to approve this amendment request until all applicable questions have been properly answered.
Thanks, David Lochbaum Director, Nuclear Safety Project Union of Concerned Scientists PO Box 15316 Chattanooga, TN 37415 (423) 468-9272 office (423) 488-8318 cell dlochbaum@ucsusa.org Hearing Identifier: NRR_PMDA Email Number: 510 Mail Envelope Properties (7B4F27A2B8788B46892F0DDD79245669B8683D02)
Subject:
RE: Public Comment - RE: Proposed refueling plan at Duane Arnold - Action taken regarding your comment Sent Date: 10/16/2012 12:49:42 PM Received Date: 10/16/2012 12:52:58 PM From: Dave Lochbaum Created By: DLochbaum@ucsusa.org Recipients: "Frankl, Istvan" <Istvan.Frankl@nrc.gov> Tracking Status: None "Ring, Mark" <Mark.Ring@nrc.gov> Tracking Status: None "Haeg, Lucas" <Lucas.Haeg@nrc.gov>
Tracking Status: None "Murray, Robert" <Robert.Murray@nrc.gov> Tracking Status: None "Feintuch, Karl" <Karl.Feintuch@nrc.gov> Tracking Status: None Post Office: UCXSREX054147.ucs.usa Files Size Date & Time MESSAGE 7198 10/16/2012 12:52:58 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: