MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 2024-09-24
[Table view] |
Text
1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
Sent: Tuesday, November 01, 2011 9:29 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 11-02-11.docx Attachments:
NRC PM Open Items List 11-02-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services
dlboyd@tva.gov 423-365-8764 Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 575 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF24C68FA1)
Subject:
NRC PM Open Items List 11-02-11.docx Sent Date: 11/1/2011 9:28:42 AM Received Date: 11/1/2011 9:28:45 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients: "Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None
Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 234 11/1/2011 9:28:45 AM NRC PM Open Items List 11-02-11.docx 33871
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
Page 1 of 4 NRC PM Open Items List 11/2/11 (423) 751-7777 ID 4233658764#
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Jan. 2012
Inspection
4 th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)
Page 2 of 4 No. Description Status Additional Comments Resp Org/Person 2. Instrumentation RAI List (Knuettel)
- 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Draft scheduled for 9/9 is now TBD.
- 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
- 3. Revise GA-ESI procedure for CGI dedication to address NRC comments.
- 4. Draft received for review 9/20/11.
- 5. Non-props & affidavits
- 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 7. WEC to revise figure to remove connection from OM to printer to complete commitment.
- 8. WEC to agreed to produce a test report for the incore IITA.
- 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
- 10. Submit I&C update letter
- 1. 9/29/11A 2. Various - see status
- 3. 9/26/11A 4. 10/4/11 5. 11/18/11 6. Various - see status
- 7. 10/24/11A
- 8. 10/27/11 9. 10/27/11A
- 10. 11/14/11 1. Draft response received and comments sent to GA.
- 2. 04038903-1SP: 10/11/11 A 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 04038903-QSR: 09/30/11 A Non-props and affidavits due 11/18/11
- 3. OP-7.3-240: Complete
- 4. Create new bridge document 04038800-1SP:
10/11/11A
- 5. Provide NRC non-prop and affidavit for all remaining documents
- 6. WEC to provide the following documents:
WCAP for 0000-ICE-30156 11/9/11 CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 A EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/16/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: Complete WNA-PT-00138-WBT: Complete
- 7. WNA-AR-00189-WBT:10/24/11A
- 8. IITA In-core EQ report
- 9. MI cable 600V test report Produce non-prop summary document A
- 10. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables?
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Page 3 of 4 No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection - June 2012 Table update -
TBD Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 10/25-27/11 2.9/30/11A 3.9/30/11A 4. 10/31/11A 5. 11/30/11
- 6. 9/30/11A
- 7. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs - if needed 4. Response to Group 8 plus 2Qs on 9/30/11 letter 5. Submit As-designed U1/U2 FPR 6. Fire Protection Program Audit Frequency - add to group 7 response
- 7. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. 11/18/11
- 2. 11/18/11
- 3. 11/18/11
- 4. 11/18/11
- 5. 10/31/11A
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 4. Unit 1 AST FHA
- 5. List of Unit 1 Changes Licensing/Elton (Bryan) 5. Shea 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? Arent/Bryan 8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton Page 4 of 4 No. Description Status Additional Comments Resp Org/Person 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/18/11 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification
- 1. TBD 2. Feb 2012 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
- 2. TS certification Eng/Hilmes (Bryan) 13. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing 15. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon) 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR 18. ASME Section III N-3 report 8/1/12 0. Discretionary Actions
- 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Arent) Fall 2011 No action pending upcoming Generic Letter TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.
Corp SG/ Webber ISI/Tinley