|
---|
Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to PRNI High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to PRNI High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to PRNI High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to PRNI High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 26, 2013 U.S. Nuclear Regulatory Commission Serial No. 13-243B Attention:
Document Control Desk NL&OS/WDC R3 Washington, DC 20555 Docket Nos. 50-338/339 License Nos. NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS I AND 2 OFFSITE DOSE ASSESSMENT CAPABILITY DURING AN EVENT INVOLVING MULTIPLE RELEASE SOURCES In a letter to the Nuclear Energy Institute (NEI) from the NRC dated February 27, 2013 (ML13029A632), the NRC requested additional detailed information regarding licensee's site-specific, current or planned, multi-unit dose assessment capabilities.
In a response to the Director, Nuclear Security and Incident Response, dated March 14, 2013 (ML13073A522), NEI notified the NRC that licensees would provide letters directly to the NRC describing multi-unit/multi-source dose assessment capability.
In accordance with the NEI letter, Virginia Electric and Power Company (Dominion) provides the following information regarding the capability to perform offsite dose assessment at North Anna Power Station (NAPS) during an event involving multiple release sources (e.g., the ability to assess concurrent releases from reactor containment and the spent fuel pool).Currently, NAPS uses Meteorological Information Dose Assessment System (MIDAS)software from ABS Consulting, Inc., as its dose calculation model. MIDAS is a personal computer based program for rapidly assessing the radiological impact of accidents at nuclear power plants. It calculates total effective dose equivalent (TEDE) and thyroid doses. Source term information is derived from plant effluent monitors, reactor coolant system (RCS) or containment samples, field monitoring teams, or a default design basis accident scenario.
In the event of a set of events involving multiple units/sources, individual dose assessment results can be summed to determine a total offsite dose assessment result.Furthermore, an upgraded version of MIDAS software with a Multiple Accident Report Combiner (MARC) MIDAS Module has been procured.
This MARC MIDAS Module can process up to five individual accidents and present results on a graphically displayed map with results combined for multiple release sources. The software upgrade will be implemented as indicated in the attached schedule.
Serial No. 13-243B Docket Nos. 50-338/339 Page 2 of 3 If you have any questions regarding this information, please contact Mr. Thomas Shaub at (804) 273-2763.Sincerely, David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Commitments made in this letter: None
Attachment:
Implementation Schedule for MARC MIDAS Module for Multi-Unit Dose Assessment Capability COMMONWEALTH OF VIRGINIA ))COUNTY OF HENRICO )The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Heacock, who is President and Chief Nuclear Officer of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this d& 7- day of ,2013.My Commission Expires: A3110 VICKI L. HULL Notary Public Commonwealth of Virginia Notary Public 140542 My Commission Expires May 31. 2014 Serial No. 13-243B Docket Nos. 50-338/339 Page 3 of 3 cc: Director, Office of Nuclear Reactor Regulation One White Flint North Mail Stop 13H16 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission, Region II Regional Administrator 245 Peachtree Center Ave. NE Suite 1200 Atlanta, Georgia 30303-1257 Dr. V. Sreenivas Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station J. E. Reasor, Jr.Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Blvd.Glen Allen, Virginia 23060 Serial No. 13-243B Docket Nos. 50-338/339 ATTACHMENT IMPLEMENTATION SCHEDULE FOR MARC MIDAS MODULE FOR MULTI-UNIT DOSE ASSESSMENT CAPABILITY VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 Serial No. 13-243B Docket Nos. 50-338/339 Attachment, Page 1 of 1 IMPLEMENTATION SCHEDULE The following table lists milestones to implement the MARC MIDAS Module for multi-unit dose assessment capability at North Anna Power Station. The milestones are being tracked in the Central Reporting System via LCO01 162.Estimated Item No., Implementation Task Completion Date 1 Obtain MIDAS software with a Multiple Accident Complete Report Combiner (MARC) MIDAS Module 2 Complete acceptance testing of MARC MIDAS 09/05/2013 Module 3 Develop end-user documents (e.g., implementing 10/31/2013 procedures, guidelines, etc.)4 Develop and conduct training on MARC MIDAS 09/19/2014 Module 5 Implement multi-unit dose assessment capability 12/31/2014