MONTHYEARRBG-47332, Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria2013-02-0707 February 2013 Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria Project stage: Request ML13070A2962013-03-11011 March 2013 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions Project stage: Acceptance Review ML13337A4812013-12-0303 December 2013 NRR E-mail Capture - River Bend Station, Unit 1, Request for Additional Information Regarding Proposed Changes to TS 3.8.4, DC Sources-Operating Project stage: RAI RBG-47423, Response to Request for Additional Information on License Amendment Request 2013-012014-01-16016 January 2014 Response to Request for Additional Information on License Amendment Request 2013-01 Project stage: Response to RAI ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions Project stage: Approval ML14136A0072014-06-18018 June 2014 Biweekly Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions Project stage: Other 2013-03-11
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML24031A2772023-11-27027 November 2023 (05000458/2024040) IP 95001 Regarding EA-23-071 Initial Request for Information ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23103A4662023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23103A4672023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23089A0702023-03-29029 March 2023 TSTF-505 Email Providing Reference for 0.3g HCLPF Value ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML21356A5882021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: River Bend Station 1 - IST Program Relief Request for PIV Testing Frequency ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21218A0412021-07-19019 July 2021 NRR E-mail Capture - River Bend Unit 1 - Acceptance of License Amendment Request to Add License Condition Concerning Receipt, Possession ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20337A1382020-11-23023 November 2020 Acceptance of License Amendment Request to Adopt GL 86-10 Standard License Condition for Fire Protection ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20317A2922020-10-15015 October 2020 Entergy Operations, Inc. (River Bend Station, Unit 1) - Acceptance Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A3542020-10-14014 October 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of TSTF-563 LAR, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20169A3782020-06-16016 June 2020 Email-20-0196-NRC Riv Response V. Dricks to Tom Gurdziel Inquiry: Extent of Condition Flex Equipment ML20169A6752020-05-20020 May 2020 Email-20-0196, Tom Gurdziel Inquiry to NRC Chairman Resource, Extent of Condition FLEX Equipment, 05/20/2020 ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) ML20086J6572020-03-26026 March 2020 NRR E-mail Capture - River Bend Station, Unit 1 -Acceptance Review of the LAR Associated with Extending the Implementation Date from 5/13/2020 to 9/30/2020 for Emergency Action Level Scheme ML20079D9302020-03-19019 March 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20057G1752020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems ML20057G1592020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19352F5222019-12-17017 December 2019 NRR E-mail Capture - Acceptance Review Results for License Amend Request to Revise TS 3.3.5.2 to Adopt TSTF-425, Rev 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, for River Bend, ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML19059A0292019-02-27027 February 2019 NRR E-mail Capture - Acceptance Review Results for License Amendment Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules, for Entergy Fleet ML19008A3592019-01-0808 January 2019 NRR E-mail Capture - Acceptance Review: RR Volumetric Exams (L-2018-LLR-0388) ML18365A1422018-12-28028 December 2018 NRR E-mail Capture - Acceptance Review Results - Removal of TS Table of Contents (L-2018-LLA-0489) ML18337A0052018-11-30030 November 2018 Acceptance Review Results: River Bend Station License Amendment Request New Spent Fuel Pool Criticality Analysis ML18337A3422018-11-14014 November 2018 Email from EPA Region 6 to David Drucker Nrr/Dmlr/Mrpb Acknowledging Receipt of Link to Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 58, Regarding River Bend Station, Unit 1 ML18304A4612018-10-31031 October 2018 NRR E-mail Capture - Final RAI River Bend TSFTF-425 (L-2018-LLA-0056) ML18291B1472018-10-18018 October 2018 Revision of the River Bend License Renewal Safety Evaluation Report 2023-08-28
[Table view] |
Text
1NRR-PMDAPEm Resource From:Wang, Alan Sent:Tuesday, December 03, 2013 10:29 AM To:BURMEISTER, BARRY M; Joseph Clark (JCLARK@entergy.com)
Cc:Burkhardt, Janet
Subject:
River Bend Station, Unit 1, Request for A dditional Information Regarding Proposed Changes to TS 3.8.4, "DC Sources-Operating" (TAC No. MF0658)
Barry and Joey, by letter dated February 7, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13044A058
), Entergy Operations, Inc. (the licensee) submitted a license amendment request to revise the River Bend Station, Unit No. 1 (RBS) Technical Specification (TS). Specifically, this license amendment request (LAR) proposed to revise TS 3.8.4 Surveillance Requirements (SR) 3.8.4.2 and 3.8.4.5. The changes will add new acceptance criteria to address possible non-conservative conditions when the battery connection resistances are at maximum values. The US Nuclear Regulatory Commission (NRC) staff has determined that the following additional information is required to complete its review of the amendment request. This request was discu ssed with Mr. Barry Burmeister of your staff on December 3, 2013, and it was agreed that a response would be provided within 30 days from the issuance of this email. If circumstances result in the need to revise the requested response date, please contact me at
(301) 415-1445 or via e-mail at Alan.Wang@nrc.gov
.
- 1. On Page 5 of 7 in Attachment 1, the LAR states, "SR 3.8.4.5 specifies that the measured resistance at each inter-cell, inter-rack, inter-tier, and terminal connection will be less than 1.5 E-4 ohms." However, the TS mark-up of the proposed change
in Attachment 2 of the LAR reflects the acceptance criteria of inter-cell, inter-rack, interior, and terminal connection as less than or equal to 1.5 E-4 ohms.
Please clarify the above discrepancy.
- 2. On Page 5 of 7 in Attachment 1, the LAR states, "The surveillance will also be revised to include the additional acceptance criterion that total connection resistance will be less than or equal to 45.75 E-4 ohms." However, Technical Specification Mark-up of the proposed change in Attachment 2 of the LAR reflects the acceptance criteria of total connection resistance as less than 45.75 E-4 ohms.
Please clarify the above discrepancy.
- 3. On Page 1 of 7 in Attachment 1, the LAR, states, "The change will add a total resistance value of 45.75 E-4 ohms to SRs 3.8.4.2 and 3.8.4.5. The current individual connection limit of 1.5 E-4 ohms will remain as unchanged." 10 CFR 50.36 (c)(3) Surveillance Requirement states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met."
Please explain how the current TS SR individual connection limits of less than or equal to 1.5 E-4 ohms for inter-cell, inter-rack, inter-tier, terminal connections and the proposed total connection resistance of <45.75 E-4 ohms, in TS SRs 3.8.4.2 and 3.8.4.5, will assure the necessary quality of systems and components. Also, please provide a summary of the calculations including the assumptions and supportive documentation to show that the batteries will perform their intended design functions when operating within these limits.
- 4. On Page 2 of 7 in Attachment 1, the LAR states, "Battery Sizing Requirements: The 2Divisions 1 and 2 batteries have sufficient capacity to power their required safety loads for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per RBS Calculations E-143 and E-144. The Division 3 battery has sufficient capacity for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per RBS Calculation G13.18.3.6*09. These calculations include design margin and aging. The batteries are sized in accordance with the methodology of The Institute of Electrical and Electronics Engineers (IEEE) Standard (Std.)
485-1983." IEEE Std. 485-1983 also recommends considering temperature correction factor in cell sizing.
Please, confirm that RBS calculations for battery sizing included appropriate temperature correction factor in addition to the design and aging margins in accordance with IEEE Std. 485-1983.
- 5. Design Requirements on Page 2 of 7 in Attachment 1 of the LAR states, "The minimum acceptable node voltage (i.e., voltage at the terminals of the distribution panels, motor control centers, switchgear, or inverter) shall be greater than 108 VDC at the end of the 4-hour battery duty cycle. This is based on the battery sizing for a final terminal voltage of 110 VDC."
Please, confirm that the voltages (i.e., voltage at the terminals of the equipment downstream of the distribution panels, motor control centers, switchgear, or inverters) shall be greater than or equal to the equipment minimum required voltages at the end of the 4-hour battery duty cycle. In addition, provide a summary of the calculations and assumptions postulated which determines that the limiting component will have the minimum required voltage with the proposed battery connection resistance specified in TS 3.8.4.2 and 3.8.4.5.
Alan Wang Project Manager (River Bend Station) Nuclear Regulatory Commission Division of Operating Reactor Licensing
Hearing Identifier: NRR_PMDA Email Number: 938 Mail Envelope Properties (Alan.Wang@nrc.gov20131203102800)
Subject:
River Bend Station, Unit 1, Request for Additional Information Regarding Proposed Changes to TS 3.8.4, "DC Sources-Operating" (TAC No. MF0658) Sent Date: 12/3/2013 10:28:54 AM Received Date: 12/3/2013 10:28:00 AM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients: "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov> Tracking Status: None "BURMEISTER, BARRY M" <BBURMEI@entergy.com> Tracking Status: None "Joseph Clark (JCLARK@entergy.com)" <JCLARK@entergy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 5219 12/3/2013 10:28:00 AM