ML14136A007
| ML14136A007 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/18/2014 |
| From: | Wang A Plant Licensing Branch IV |
| To: | Division of Operating Reactor Licensing |
| Wang A | |
| References | |
| TAC MF0658 | |
| Download: ML14136A007 (3) | |
Text
June 18, 2014 MEMORANDUM TO: Biweekly Notice Coordinator FROM:
Alan B. Wang, Project Manager /RA/
Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE (TAC NO. MF0658)
Entergy Gulf States Louisiana, LLC, and Entergy Operations, Inc., Docket No. 50-458, River Bend Station, Unit 1, West Feliciana Parish, Louisiana Date of amendment request: February 7, 2013, as supplemented by letter dated January 16, 2014.
Brief description of amendment: The amendment revised the River Bend Station, Unit 1 (RBS)
Technical Specification (TS) 3.8.4, DC [Direct Current] Sources - Operating, Surveillance Requirements 3.8.4.2 and 3.8.4.5. The change is the result of the licensees determination that the total battery capacity would possibly be insufficient to supply the required load to the DC system if each of the battery-to-battery connections were to reach the individual resistance limits. The changes to the Surveillance Requirements added new acceptance criteria to address the possible non-conservative conditions when the battery connection resistances are at maximum TS values.
Date of issuance: June 18, 2014 Effective date: As of the date of issuance and shall be implemented 60 days from the date of issuance.
Biweekly Notice Coordinator Amendment No.: 181. A publicly-available version is in ADAMS under Accession No. ML14136A008; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. NPF-47: The amendment revised the Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: April 30, 2013 (78 FR 25312). The supplemental letter dated January 16, 2014, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated June 18, 2014.
No significant hazards consideration comments received: No.
Biweekly Notice Coordinator Amendment No.: 181. A publicly-available version is in ADAMS under Accession No. ML14136A008; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. NPF-47: The amendment revised the Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: April 30, 2013 (78 FR 25312). The supplemental letter dated January 16, 2014, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated June 18, 2014 No significant hazards consideration comments received: No.
DISTRIBUTION:
NON-PUBLIC LPL4-2 r/f RidsNrrDorlLpl4-2 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMRiverBend Resource ADAMS Accession No: ML14136A007 OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA NAME MOrenak AWang JBurkhardt DATE 05/16/14 05/19/14 05/16/14 OFFICE OGC /NLO NRR/DORL/LPL4-2/BC NRR/DORL/LPL4-2/PM NAME BHarris DBroaddus AWang DATE 06/01/14 06/06/14 06/18/14 OFFICIAL AGENCY RECORD