SUBJECT:
Bf1L TEClifilCAL ASSISTAfiCE C0tiTRACT FOR TRT CIVIL / STRUCTURAL STAFF Per our phone conversation of 11/14/84 I am enclosing the attached for pur follow up.
If you have questions regarding the subject matter, please contact D. Jenq, or me at X37910.
Do NOT use this form as a RECORD of approvaft, concurrences, disposals, clearances, and similar actions FRcM. (Name, org symbol, AgencyfPost)
, _/
Room No.-Bldg.
.f.
/
L. Shao, DD/DET/RE u s' "I831$09
, f
~~
5041-102
' OPTIONAL FORM 41 (Rev. 7-76)
Presentee by CSA e C"C : M*1 0 M i
'..'E (: *)
FPadR (48 Cf% 801-11.206 9
8607030341 860623 PDR FOIA CARDE86-A-18 PDR
[
CONFIDENTI AL - NOT FOR PUDL IC DISCLOSt'RE r
A Summary of Proposed BNL Technical Assistance Program Civil / Structural Allegations INTRODUCTION:
The Civil / Structural staf f of Comanche Peak Technical Review leam (TRT) has completed its review of 57 allegations and issued seventeen (17) draft SSERs.
As a result of the review, the TUEC was requested to complete five action items identified in the SSERs.
In order to assess the adequacy of TUEC's response to the action items, TRT needs independent seismic analysis capability which the present TRT does not possess.
Therefore, it is pro-posed that BNL be contracted to provide TRT the needed seismic analysis capability as well as other general analytical support.
WORK SCOPE:
The tasks to be performed by BNL under the technical assistance contract are:
a.
To review the seismic analysis results pertaining to seismic air gap
- issue, b.
To review the results of seismic analyses of control room ceiling elements.
c.
To perform independent seismic analysis pertaining to seismic Category II and rion seismic conduits.
d.
To audit the TUEC's damage interaction study program.
e.
To evaluate and dispose of issues resulting from the activities of the above items a through d.
f.
To resolve several analytical concerns raised b uanitaEllifof CASE.
g.
To provide necessary testimony and analytical support on future ASLB related proceedings.
h.
To resolve new allegations or concerns which require analytical capability.
EFFORT:
It is expected that several BNL staff efforts would be needed during the next few months.
The cost is estimated as $100,000.00.
SCHEDULE:
The contract should be processed with high priority to support the TRT effort.
BNL should make its staff available within the next two weeks.
Attachment IV Date ROUTING AND TRANSMITTAL SUP Hovember 16, 1984 1o. {u me. enge aymbet. room numbe.
san ei.
Dete avladong. Agency / Pest) 3, Chet Poslusny g
cc:
R. Vollner
- v. ungnt 3.
V. Noonan f r
. D: [enh b.^.'.'.r12'-f L=' * '
s a
ULb.
- n. IIIsaviJut
.... -.uw D. Ross g
u.
ru s iit M Note end Retum Action Approval For Clearance Per Conversetson
)
As Requested For Cowetion Propero Reply Cerculate For Your information See Me Comment Invest gete Signature Coordinatsn Justih mEMAnns
SUBJECT:
Bl4L TECilHICAL ASSISTANCE CONTRACT FOR TRT CIVIL / STRUCTURAL STAFF Per our phone conversation of 11/14/84 I am enclosinq the attached for jour follow up.
If you have questions regarding the subject matter, please contact D. Jeng, or me at X37910.
Do Not use this form as a RECORD of appewels, eencurrences desposets, clearances, and similar actions FROM;(Name, erg symbol, Age 99t)
Room No.4ndg.
L. Shao DD/DET/RE y
ggD9 sota-no:
OPTIONAL FORM 41 (Rev. 7-76)
= tw tst; e - Pt.tp FPts
-11J06 S
e
[
A Sumn.any of Preposed BNI lechnical Ast intente Program er Civil / structural A11cuations w
1N1R000Cl]DN:
The Civil / Structural staf f of Cor.incho Peak Technical Review leam (1R1) has completed its review of 57 allegations and issued seventeen (17) draf t 55ERs. As a result of the review. the TUEC was requested to complete five action items identified in the 55tRs.
In order to assess the adequacy of TUEC's response to the action items, TR1 needs independent seismic analysis capability which the present 1R1 does not possess. Therefore, it is pro-posed that BNL be contracted to provide TR1 the needed seismic analysis capability as well as other general analytical support, i
WORK SCOPE:
The tasks to be performed by BNL under the technical assistance contract are:
To review the seismic analysis results pertaining to seismic air gap a.
]
issue.
b.
To review the results of seismic analyses of control room ceiling elements.
To perform independent seismic analysis pertaining to seismic Category 11 c.
and non-seismic conduits.
d.
To audit the TUEC's damage interaction study program.
l e.
To evaluate and dispose of issues resulting from the activities of the above items a through d.
f.
To resolve several analytical concerns raised by Juanita Ellis of CASE.
g.
To provide necessary testimony and analytical support on future ASLB related proceedings.
To resolve new allegations or concerns which require analytical h.
capability.
i 1.
To assist TRT in evaluating issues misted to (a CYGNA #10, ll, and 12 b steam generator lateral supports.
c cable tray supports and d other Comanche Peak hearing issues which may arise l
in the future.
EFFORT:
It is expected that several BNL staff efforts would be needed during the next few months. The cost ir estimated as $100,000.00, i
SCHEDULE:
The contract should be processed with high priority to support the TRT I
effort.
BNL should make its staff available within the next two weeks.
- Item "i" is added to address CASE issues.
.--