ML24149A293

From kanterella
Revision as of 13:47, 4 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ile Form 2.3-1 Examination Outline Quality Checklist
ML24149A293
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/07/2024
From:
NRC/RGN-III/DORS/OB
To:
Exelon Generation Co
James Nance
Shared Package
ML22251A191 List:
References
Download: ML24149A293 (1)


Text

Form 2.3-1 Examination Outline Quality Checklist Facility: Date of Examination:

Task Description (Y)es / (N)o Item a b* c#

a.The outline was systematically and randomly prepared in accordance with the instructions in Section B of ES-4.1, and all knowledge and ability (KIA) categories are7< w appropriately sampled.

a: b. The outline does not overemphasize any systems, evolutions, or generic topics. 7t. k 3:

C. Justifications for deselected or rejected KIA statements are acceptable. 1( 'It"'

a.Using Form 3.4-1, Events and Evolutions Checklist, verify that the proposed scenarioIt set contains the required number of normal evolutions, reactivity evolutions, instrument and component failures, manual control evolutions, technical specifications, and major 'It transients.

a: b.There are enough scenarios (and spares) for the projected number and mix of 0,t f-applicants in accordance with the expected crew composition and rotation schedule<( 'Jt,...J without compromising exam integrity. Ensure that scenarios will not be repeated on subsequent days.

Ensure that all scenarios are new or significantly modified in accordance with ES-3.4KC. 7L. and that no scenarios are duplicated from the applicants' audit test(s).

d.To the extent possible, assess whether the outline(s) conforms with the qualitative and,t quantitative simulator set criteria specified on Form 2.3-2. 7,(

a.Verify that the administrative outline meets the criteria specified in the instructions on11. K Form 3.2-1 and that no tasks are duplicated from the applicants' audit test(s).

b.Verify that the control room and in-plant systems outline meets the criteria specified in Cl) the instructions on Form 3.2-2 and that no tasks are duplicated from the applicantsK K audit test(s).-,

C. Determine whether the number of job performance measures (JPMs) and JPM types is sufficient for the projected number and mix of applicants and ensure that no items are "K duplicated on subsequent days.

a.Assess whether the appropriate exam sections cover plant-specific priorities (including1( t{ probabilistic risk assessment and individual plant examination insights).

b.Assess whether the 10 CFR 55.41, 10 CFR 55.43, and 10 CFR 55.45 sampling is1< {(...J approp riate.

<( a: c.Check whether KIA importance ratings (except for plant-specific priorities) are greater1( k than or equal to 2.5.

w I( CJ d.Check for duplication and overlap across the exam and with the last two NRC exams. t(

e.Check the entire exam for balance of coverage. 1( I{

f.Assess whether the exam fits the appropriate job level (reactor operator or senior1< reactor operator).

Printed Name/Signature Date

a. Author Kevin Dall :U 1 / I0-1-23
b. Facility Reviewer(*) Anthonll Siebert Signed via Telecom on 10-19-23 e.,.,., Oa:,,: b-1,/

C. NRC Reviewer (#)IO-lq-:23 NRC Chief Examiner NRC Supervisor

  • The facility licensee signature is not applicable for NRC-developed tests.
  1. An independent NRC reviewer performs the steps in column "c." This may be the NRC Chief Examiner if he/she did not develop the outline under review.JCN JCN JCN JCN JCN JCN JCN JCN JCN JCN JCN JCN JCN JCN JCNJCN Jim Nance Jim NanceJim Nance Jim Nance11-6-2023 11-6-2023