IR 05000275/2024301

From kanterella
Revision as of 14:28, 14 September 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
NRC Examination Report 05000275/2024301; 05000323/2024301
ML24234A097
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/26/2024
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To: Peck A
Pacific Gas & Electric Co
References
50-275/24-301, 50-323/24-301
Download: ML24234A097 (1)


Text

August 26, 2024

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000275/2024301 AND 05000323/2024301

Dear Mr. Peck:

On August 13, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Diablo Canyon Nuclear Power Plant, Units 1 and 2. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 18, 2024, with Mr. A. Wilson, Senior Director of Engineering, and other members of your staff. An exit meeting was conducted on August 13, 2024, with Mr. A. Kadir, Operations Training Manager, who was provided the NRC licensing decisions.

The examination included the evaluation of six applicants for reactor operator licenses, nine applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.

There were no findings identified for this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Heather J. Gepford, Ph.D., Chief Operations Branch Division of Operating Reactor Safety Docket Nos. 05000275, 05000323 License Nos. DPR-80, DPR-82 Enclosure:

Examination Report 05000275/2024301, and 05000323/2024301 Electronic distribution via LISTSERV Signed by Gepford, Heather J.

on 08/26/24

ML24234A097 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: KDC1 Yes No Publicly Available Sensitive NRR-079 OFFICE SOE:DORS/OB SOE:DORS/OB NSE:DRSS/RCB SOE:DORS/OB OE:DORS/OB OE:DORS/OB NAME KClayton TFarina MBloodgood NHernandez RWilliams DYou SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 08/23/24 08/21/24 08/21/24 08/21/24 08/23/24 08/21/24 OFFICE BC:DORS/OB NAME HGepford SIGNATURE /RA/

DATE 08/26/24

U.S. NUCLEAR REGULATORY COMMISSION Examination Report

Docket Numbers: 05000275, 05000323

License Numbers: DPR-80, DPR-82

Report Numbers: 05000275/2024301, 05000323/2024301

Enterprise Identifier: L-2024-OLL-0030

Licensee: Pacific Gas and Electric Company

Facility: Diablo Canyon Power Plant, Units 1 and 2

Location: Avila Beach, California

Inspection Dates: June 3, 2024, to August 13, 2024

Inspectors: K. Clayton, Senior Operations Engineer, Chief Examiner N. Hernandez, Senior Operations Engineer T. Farina, Senior Operations Engineer M. Bloodgood, Nuclear Systems Engineer D. You, Operations Engineer R. Williams, Operations Engineer

Approved By: Heather J. Gepford, Ph.D., Chief Operations Branch Division of Operating Reactor Safety

Enclosure SUMMARY

Examination Report 05000275/2024301 and 05000323/2024301; June 3, 2024 - August 13, 2024; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report

The NRC examiners evaluated the competency of six applicants for reactor operator licenses, nine applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license at Diablo Canyon Power Plant, Units 1 and 2.

The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12. The written examination was administered by the licensee on August 2, 2024. The NRC examiners administered the operating tests on July 15 - July 22, 2024.

The NRC examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

A. NRC-Identified and Self-Revealing Findings

None.

B. Licensee-Identified Violations

None.

REPORT DETAILS

OTHER ACTIVITIES - INITIAL LICENSE EXAMINATION

.1 License Applications

a. Scope

The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited four of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b. Findings

No findings were identified.

.2 Examination Development

a. Scope

The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of the operating tests.

b. Findings

The NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.

The NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.

.3 Operator Knowledge and Performance

a. Scope

On August 2, 2024, the licensee proctored the administration of the written examinations to all sixteen applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on August 5, 2024.

The NRC examination team administered the various portions of the operating tests to all applicants on July 15 - July 22, 2024.

b. Findings

No findings were identified.

All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.

The examination team noted no generic weaknesses associated with applicant performance on the operating tests. Post-examination analysis revealed five generic weaknesses associated with applicant performance on the written examination.

Questions 33, 53, 84, 89, and 100 demonstrated knowledge weaknesses. These weaknesses were tracked under Notification 51178743, task 15. Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training.

.4 Simulation Facility Performance

a. Scope

The NRC examiners observed simulator performance regarding plant fidelity during examination validation and administration.

b. Findings

No findings were identified.

.5 Examination Security

a. Scope

The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.

b. Findings

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

Exit Meeting Summary

The chief examiner presented the preliminary examination results to Mr. A. Wilson, Senior Director of Engineering, and other members of the staff on July 18, 2024. An exit meeting was conducted on August 13, 2024, between Mr. K. Clayton, chief examiner, and Mr. A. Kadir, Operations Training Manager. The licensee did not identify any information or materials used during the examination as proprietary.

ADAMS DOCUMENTS REFERENCED

Accession No. ML24234A065 - FINAL WRITTEN EXAMS Accession No. ML24234A066 - FINAL OPERATING TEST Accession No. ML24234A062 - POST-EXAMINATION ANALYSIS

5