ML20086D703

From kanterella
Revision as of 06:43, 16 April 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Telecopy Ro:On 770223,while Withdrawing in-sequence Control Rod to Bring Reactor Critical,Reactor Period of Less than 5 Obtained
ML20086D703
Person / Time
Site: Monticello, 05000000
Issue date: 02/24/1977
From: Eliason L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19289B550 List:
References
NUDOCS 8312020461
Download: ML20086D703 (1)


Text

_ __ ,

~

BiKSRB NORYHERN STATES POWER COMPANY F0hTICEll/> h'lCLEAR GDT: RAT 1h'G PlJdG FOhTIG11/), FrIhWESOTA 55362 gg

  • PILE 0000, February 24, 1977 Mr. J. G. Keppler, Director Region III~

Office of Inspection and Enforcement  ;

United States hbclear Regulatory Corrassion l 799 Roosevelt Road I Glen Ellyn, Illinois 60137 l

Dear Mr ~Keppler:

I FONTICELID NIELEAR GDFutATING PIN!f Docket No. 50-263 License No. DPR 22 On Febniary .25,1977, sdille withdrawing an in-sequence control rod to bring i the reactor critical, a reactor period of less than 5 seconds was obtained, '

Analyses perfonned by the NSP core analysis group shows that the corbination of high temperature and hip,h renen concentration at the time of the occurrence, established conditions such that criticality occurred on an unusually high reactivity worth control rod notch. The obsenred period was consistent with the core analysis data.

Yours very truly,

,-s .

L.'R. E11 on Plant Fhnager LRE/kik cc: Director, Office of Mwiagement Infonnstion 6 Program Control G. Charnoff '

Minnesota Pollution Control Agency l Attn: J. W. Ferman  !

File Copy sent to telecopier to Mr. Keppjer.

.v 8312020461 780426 - ,, . - : . . ~ . . ,

. , a c;. . . . t., , . ,, . -s,..,..m..m.....,,w..,.._,...

PDR ADOCK 05000263 g PDR

__ . u