MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] |
Text
From: Rankin, Jennivine Sent: Tuesday, December 3, 2019 10:30 AM To: Kellenberger, Nicholas Cc: Vogtle PEmails
Subject:
RE: Vogtle LAR 19-018 discussion Good morning Nick -
The staff has had additional internal discussions and have narrowed our question to the following. We would like to discuss this at the public meeting on Thursday.
The NRC staff cannot confirm from the license amendment application that changing the location for measuring the wetted perimeter verifies the area wetted by the PCS water flow correlates with the wetted surface area assumed in the analysis. The NRC staff needs to evaluate measuring the percentage wetted perimeter at a different location does not change the surface area wetted by the PCS water flow. If the analysis assumes a significantly larger wetted surface area within that at proposed test location (between the test location and the application of PCS flow), it does not appear testing at a location closer to the top of the pressure containment will forecast similar wetted perimeter at the spring (or tangent) line. Surface imperfections such as welds or slightly different curve in a plate could cause channeling or redirection of the surface flow after the wetted perimeter is measured at the proposed location.
If the wetted surface is significantly less than that assumed in the analysis, than the method of evaluation described in the FSAR (as updated) used in establishing the design basis or in the safety analysis (WCAP-15846 revision 5) may not be valid.
- Thanks, Jennie From: Rankin, Jennivine Sent: Wednesday, November 27, 2019 7:02 AM To: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>
Subject:
Vogtle LAR 19-018 discussion Good morning Nick -
During the review of LAR 19-018 regarding the Passive Containment Cooling System Wetted Perimeter Test modification, the NRC staff had the following question they would like to discuss.
Would it be possible to discuss it at the December 5, public meeting? Please let me know if SNC can support a discussion then. We could start it at 9 am.
The LAR proposes changes to the location where the wetted perimeter percentage is measured. The original measurement was to be at the interface between the dome and the cylindrical portion of the structure which is at 244 ft elevation. The change measures the percentage of wetted perimeter between the spring line (244 ft elevation) and 266 ft elevation.
Measuring the percentage wetted perimeter at a different location appears to change the surface area wetted by the PCS water flow. The change in wetted surface area could change the evaporation rate assumed for heat energy removal from containment. This appears to result
in a departure from a method of evaluation described in the FSAR (as updated) used in establishing the design basis or in the safety analysis (WCAP-15846 revision 5).
The LAR technical evaluation discusses percent coverage as equivalent to flow rate. There is no discussion how the change in wetted surface area affects the heat transfer rate assumed in the design basis analysis. Can SNC explain if the assumptions and methodology in the WGOTHIC analysis are affected by this change as it pertains to heat transfer rate?
- Thanks, Jennie Jennie Rankin, Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 506 Mail Envelope Properties (BN6PR09MB129873F25FB25231763F8B2398420)
Subject:
RE: Vogtle LAR 19-018 discussion Sent Date: 12/3/2019 10:30:22 AM Received Date: 12/3/2019 10:30:24 AM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None "Kellenberger, Nicholas" <X2NRKELL@SOUTHERNCO.COM>
Tracking Status: None Post Office: BN6PR09MB1298.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3283 12/3/2019 10:30:24 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: