ML18333A221

From kanterella
Revision as of 17:35, 12 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Phase 2 Audit Nuscale Reactor Internals Comprehensive Vibration Assessment Program
ML18333A221
Person / Time
Site: NuScale
Issue date: 12/13/2018
From: Vera M
NRC/NRO/DLSE/LB1
To: Samson Lee
NRC/NRO/DLSE/LB1
Vera A/NRO/5861
Shared Package
ML18333A220 List:
References
Download: ML18333A221 (14)


Text

/RA/

        • Code of Federal Regulations The application must contain a level of design information sufficient to enable the Commission to judge the applicant's proposed means of assuring that construction conforms to the design and to reach a final conclusion on all safety questions associated with the design before the certification is granted. The information submitted for a design certification must include performance requirements and design information sufficiently detailed to permit the preparation of acceptance and inspection requirements by the [U. S. Nuclear Regulatory Commission] NRC, and procurement specifications and construction and installation specifications by an applicant. The Commission will require, before design certification, that information normally contained in certain procurement specifications and construction and installation specifications be completed and available for audit if the information is necessary for the Commission to make its safety determination.
    • ooo o