Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20230022024-02-21021 February 2024 Amended Integrated Inspection Report 05000483/2023002 ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 2024-09-11
[Table view] Category:License-Operator
MONTHYEARIR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML21067A5392021-03-0808 March 2021 Notification of NRC Initial Operator Licensing Examination 05000483/2022301 ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test ML16158A4602016-06-0101 June 2016 2016-06 Draft Written Examination Comments ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments ML16158A4572016-06-0101 June 2016 2016-06 Draft Written Examination ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16139A3282016-05-18018 May 2016 NRC Initial Operator Licensing Examination Approval 05000483/2016301 ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 2024-08-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test ML16158A4602016-06-0101 June 2016 2016-06 Draft Written Examination Comments ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16158A4572016-06-0101 June 2016 2016-06 Draft Written Examination ML16139A3282016-05-18018 May 2016 NRC Initial Operator Licensing Examination Approval 05000483/2016301 ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15140A2822015-05-18018 May 2015 2015-05-Draft Written Examination Outline ML15140A1262015-05-18018 May 2015 2015-05-FINAL Written Exam 2024-08-05
[Table view] |
See also: IR 05000483/2017301
Text
February 27, 2017
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Ameren Missouri
Callaway Plant
P.O. 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT, UNIT 1 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2017301
Dear Mr. Diya:
In a telephone conversation on December 19, 2016, between Mr. John Kirkland, Senior
Operations Engineer, and Mr. Phillip Swan, Operations Supervisor, arrangements were made
for the administration of operator licensing examinat
ions at your Callaway Plant, Unit 1, during the week of September 11, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The Nuclear Regulatory Commission (NRC) Region IV Office will discuss
with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by June 21, 2017. The written examination outline was provided to your staff on January 4, 2017. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by July 19, 2017. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be cancelled or rescheduled. In addition, your support for on-site
validation of the examinations is required during the week of August 14, 2017.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
F. Diya 2 should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests along with any video and audio
recordings of the dynamic operating tests until the NRC takes its licensing action on all of the applications and any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while
the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. Kirkland should be contacted to determine the method for submission of the
waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator
license applications (OMB approval number 3150-0090) and medical certifications
(OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that
all training has been completed and requesting any waivers or excusals, as applicable, should
be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when Mr. Kirkland is contacted to determine the method for submission). The NRC's final decision on whether to grant a waiver or excusal will be documented on the final (not preliminary) NRC Form 398 submitted for the applicant and will not be provided until the
final application is submitted to the NRC.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management
and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
information collection. You may submit comments on any aspect of the information collection,
including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO
V; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
F. Diya 3 In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available
electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Kirkland at 817-200-1771,
or myself at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-483
License No. NPF-30
ML17058A082 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JCK Yes No Publicly Available Sensitive OFFICE SOE:OB C:OB NAME JKirkland VGaddy SIGNATURE /RA/ /RA/ DATE 2/24/17 2/27/17