E-mail from W. Axelson of Entergy to T. Rice of the State of New York, J. Noggle of USNRC and D. Croulet of Entergy, Regarding 011706, Unit 3 Storm Drain Results.Doc
ML061780569
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/23/2006
From: Axelson W
Entergy Corp
To: Croulet D, Noggle J, Rice T, Jason White
Entergy Corp, Office of Nuclear Reactor Regulation, State of NY, Dept of Environmental Conservation
References
FOIA/PA-2006-0140
Download: ML061780569 (10)


Text

)hr-f White, 011706 UNIT 3 STORM DRAIN RESUI:I S.doc P'age 1 i From: "Axelson, William L" <WAxelso@entergy.com>

To: "Timothy Rice'" <tbrice @ gw.dec.state.ny.us>, "'James Noggle"' <JDN @ nrc.gov>,<JRW 1 @ nrc.gov>, "Croulet, Donald" <dcroule @ entergy.com>

Date: 1/23/06 9:50AM

Subject:

011706 UNIT 3 STORM DRAIN RESULTS.doc

<<011706 UNIT 3 STORM DRAIN RESULTS.doc>>

Folks--here is the lastest re-sampling of the Unit 3 storm drains--not much has changed bill Information in this record was deleted 10 Srdalice witb Ac eemumi hpFreedom of laomo N 1ýr onnwnite--

n:xi.ntm Page 1 ot~fl Wflite I 1X I .Iitm Page 1<<011706 UNIT 3 STORM DRAIN RESULTS.doc>>

Folks--here is the lastest re-sampling of the Unit 3 storm drains--not much has changed bill i .

JS~lI lVYl l'... t~ .D%

  • ~ I .P -I I e ) ! .* i l%%... ...... ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ --- -------- ., -". ;. -... .." ---oY -... .. ..UNIT 3 STORMI DRAIN i RESULTS MAP (01/17/06)

'so 4 " .81 5010 B3 4650 B4 3600 RADIOACnVE B6 MACHINE B7 2690 B8 <MDA Cl 867 UNIT 3 D2 <MDA E4 <MDA E4A <MDA E5 <MDA E6 <MDA ..SERVICE E6 <MDA ADMIN E7 <MDA COMPWE UNIT 3 TURBINE BLDG.DISCHARGE CANAL DISCHARGE CANAL 'DISCHARGE CANrXL HUDSON RIVER

)hnWhite -'MONITORING WELL STATUS.doc Page_11 From: "Axelson, William L" <WAxelso@entergy.com>

To: "Croulet, Donald" <dcroule@entergy.com>, <JRW1 @nrc.gov>, "'James Noggle"'<JDN@nrc.gov>, "'Timothy Rice"' <tbrice@gw.dec.state.ny.us>

Date: 1/23/06 9:52AM

Subject:

MONITORING WELL STATUS.doc

<<MONITORING WELL STATUS.doc>>

Here is the overall latest MW and storm drain data--are we still set for Feb 6 for split sampling on phase 1 wells?

,hn White -*TEXT.htm Pagqe 1 [1<<MONITORING WELL STATUS.doc>>

Here is the overall latest MW and storm drain data--are we still set for Feb 6 for split sampling on phase 1 wells?

ihn'White

-MONITORING WELL STATUS.doc Pagei~MONITORING WELL STATUS (Jan 23, 2006-0600 hours)Well Number MW-111 MW-30 Location Status N Transformer Yard U-2 SFB Baseline Sample PT Not in Service Adding casings to reach 80'el Well Installed Packer Test Done Well installed'ext Current Len Results (llighest Historical Value)Current result: 199,000 pCi/I (01/13/06) 302,000 pCi/L (11/04/05)

Add permanent Packer Raw Water (no Packer) 399,000 pCi/L (11/23/05)

Highest Packer Water: 600,000 pCi/L (11/24/05)

Sampled 12/30/05 Raw water (no Packer) 4,060 pCi/L (12/30/05)

Count Packer samples Remove and repair Packer Raw Water (no Packer) 3,720 pCi/L (01/13/06)

MW-31 MOB side walk MW-32 U-2 SFB Alley Way Need to fix Packer assembly MW-33 Transformer Yard MW-34 Transformer Yard MW-35 Transformer Yard MW-36 U-2 Turbine Bldg MW-37 U-2 Turbine Bldg Well installed Well installed Well installed About 15' down in hole Casing at about 10' in place Drilled through concrete floor Down to subsoil level (about 8"'Sampled water (01113/06) 232,O00pCi/L Sampled water (01/13/06) 131,000 pCi/L Sampled water (01/13/06) 97,800 pCi/L Complete well installation 232,000 pCi/L (01/13/06) 159,000 pCi/L) (01/06/06) 97,800 pCi/I (01/13/06)

Finish MW-36, go to MW-37 Continue periodic sampling MW-38 South U-3 Boundary Well in service NY State Result: 701 pCi/I (12/08/05)

SPLIT SAMPLE MW-38 RESULT: Fitzpatrick Result: 985 pCi/I (12/08/05)

N.D. (12/30/05) 1008 pCi/l(01/10/06)

MW-40 Lot above Sewer Plant Pilot casing installed and cemented Drilling today NMI-39 Between Ul SFB & U3 RWST Prepare to vacuum evacuate I hn White -'MONITORING WELL STATUS.doc Page -CURRENT WELL STATUS Phase I Wells Status MW-30 Completed (extending casing to 80' el)MW-31 Completed MW-32 Completed MW-33 Completed MW-34 Completed MW-35 Completed MW-36 Electric drill on location to start drilling MW-37 Drilled 9" through concrete floor MW-38 Completed Phase II Wells Sequence (see note belowl Status MW-39

  • South of Unit I Fuel Storage Building (next to be vacuum evacuated MW-40
  • Parking Lot above Sewerage Plant (drilling starting now-01/20/06)

MWV48

  • Furthest Southerly Property Boundary (completed vacuum evacuation)

MW.42 West of Unit 2 RWST MW-46 West of Unit 3 PAB Sump MW-41" South of Unit Unit 3 RWST MW-43 South of Unit 3 Tank Pit and RWST MW-44 North of Unit 3 Fuel Storage Building MW-45 Between Unit 3 Fuel Storage Building and PAB MW-47 West of Unit I Fuel Storage Building MW-49 West side of Unit 3 Discharge Canal MW-50 East side of Unit 3 Discharge Canal MW-51 Southern property hill north of MW-40 MW-52 Northern property boundary*Note: Wells numbering 39,40,48 are priority wells at this time and may be drilled in a changing sequence within this subset based on depth of well considerations, equipment setup options, and engineering paperwork delivery.

ihnWhite -!MONITORING WELL STATUS.doc Page 3:'I ihnWhite -'MONITORING WELL STATUS.doc Paoe 31 RECENT TREND INFORMATION: (Activity in pCi/L)MONITORING WELLS (in pCi/l)DATE: 11124105 12/13-16 12/19/05 12/30/OS 01106106 01/13106 MW-30: 600,000 (ONLY SAMPLE TAKEN WITH TEMPORARY PACKER SYSTEM)MW-31: MW-32: MW-33: MW-34: MW-35: MW-ll: MW-38: 4061 4030 STILL DRILLING 142,000 199,000 220,000 63,900 121,000 147,000 STILL DRILLING 189,000 159,000 95,400 113,000 3720 232,000 131,000 97,800 199,000 42,300. 76,000 80,500 296,000 192,000 212,000 Most recent split sample results: 985 (Fitzpatrick 12/08/05))

701 State of New York (12/08/05)

Most recent Fitzpatrick results: Not detected (Fitzpatrick 12130/05)UNIT 2 STORM DRAINS (in pCi/n)(MOST RECENT RESULTS)MH-1 (U2 river front)MH-2 (U2 river front)MH-3 (North of U2 Turbine)MH-4 (U2 Transformer Yard)MH-4A(U2 Transformer Yard)MH-5 (U2 Transformer Yard)MH-6 (U2 Transformer Yard)MDA (goes to river)MDA (goes to river)3,450 3,070 3,380 3,480 13,000 MH-9 (U2 MOB)MH-10 (U2 MOB)MH-12 U2 Riverfront)

MH-14 (U-2 River front MH-2AMDA (near U2 Diesel)CB 4 (near U2 RWST)CB-24 (near U2 Security C.P.)2,140 2,940 MDA (goes to river)MDA (goes to river)MDA 1,010 822

)hn'White

! MONITORING WELL STATUS.doc

....... Page 4 !1,~hnWhite ! MONITORINC~

WELL STATUS.doc Page 4 ?I* (MH-7 (U2 transformer Yard) 8,140 MH-8 (U2 Transformer Yard) 5,740 Unit 3 Storm Drains Manholes counted Jan 12,2006 (pCiIl): A2 (Near U3 RWST) <MDA A4 (Near U-3 RWST) < MDA B 1 (Unit 3 Transformer Yard) 4530 B3 (Unit 3 Transformer Yard) 6280 B4 (Unit 3 Transformer Yard) 3180 B5 (Entrance to 3 Transformer Yard) 5200 B7 (North side of U3 Turbine Bldg 2510 CI (South side of U3 Turbine Bldg) 997 D2 (South side Service Admin Bldg) <MDA Additional Storm Drains (Unit 2 and 3 combination) sampled Jan 13. 2006 (pCi/1)CB- 12 (south side of cafeteria) 849 CB- 13 (south side of cafeteria) 856 MH-13 (waterfront area-near U2 Screen house) <MDA CB-14 (south side of cafeteria) 734 MH-15 (waterfront area-near U2 Screen house <MDA)CB-15 (waterfront area-near U3 Discharge Canal) <MDA CB- 19 (waterfront-near U2 Screen House <MDA)TREND COMPARISON Unit 3 Locations Sampled Jan 17, 2006 01117106 01112/06 B I U-3 Transformer Yard 5010 4530 B3 U-3 Transformer Yard 4650 6280 B4 U-3 Transformer Yard 3600 3180 B6 U-3 Transformer Yard <MDA B7 U-3 Transformer Yard 2690 2510 B8 U-3 Transformer Yard <MDA Cl U-3 North of Service Bldg 867 997 D2 U-3 South of Service Bldg <MDA <MDA E4 U-3 Access Road to Command Post < MDA E4A U-3 Access Road to Command Post <MDA E5 U-3 Access Road to U3 Command Post < MDA E5A U-3 Access Road to U3 Command Post < MDA E6 U-3 Access Road to U3 Command Post <MDA

)hnWhite -MONITORING WELL S I A I US.doc E7 U-3 Access Road to U3 Command Post < MDA