E-mail from W. Axelson of Entergy to T. Rice of the State of New York, J. Noggle of USNRC and D. Croulet of Entergy, Regarding 011706, Unit 3 Storm Drain Results.Doc
ML061780569
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/23/2006
From: Axelson W
Entergy Corp
To: Croulet D, Noggle J, Rice T, Jason White
Entergy Corp, Office of Nuclear Reactor Regulation, State of NY, Dept of Environmental Conservation
References
FOIA/PA-2006-0140
Download: ML061780569 (10)


Text

)hr-f White, 011706 UNIT 3 STORM DRAIN RESUI:I S.doc P'age 1 i From: "Axelson, William L"<WAxelso@entergy.com>

To: "Timothy Rice'" <tbrice @gw.dec.state.ny.us>, "'James Noggle"' <JDN @nrc.gov>,

<JRW 1 @nrc.gov>, "Croulet, Donald" <dcroule @entergy.com>

Date: 1/23/06 9:50AM

Subject:

011706 UNIT 3 STORM DRAIN RESULTS.doc

<<011706 UNIT 3 STORM DRAIN RESULTS.doc>>

Folks--here is the lastest re-sampling of the Unit 3 storm drains--not much has changed bill Information in this record was deleted 10Srdalice witb Ac eemumi hpFreedom of laomo N 1ýr

onnwnite-- n:xi.ntm Page Page 11

  • ot~fl Wflite I 1X I .Iitm

<<011706 UNIT 3 STORM DRAIN RESULTS.doc>>

Folks--here is the lastest re-sampling of the Unit 3 storm drains--not much has changed bill i.

JS~lI lVYl l'... t~ . D%.**Pq=e'O!

%O* *~ I -.P I e. ". ~~~~ ~

.. ...... ~

.) *-- -!I ...t.,*,.. " --* *. l%% ~

-i oY - . .. ~ ~ ~

.. . .."-*. , - ~ ~ ~ ~ ~ ~ - -- - - ------

UNIT 3 STORMI DRAIN i RESULTS MAP (01/17/06) 'so 4 " .

81 5010 B3 4650 B4 3600 RADIOACnVE MACHINE B6 B7 2690 B8 <MDA Cl 867 UNIT 3 D2 <MDA E4 <MDA E4A <MDA E5 <MDA E6 <MDA ..

SERVICE E6 <MDA ADMIN E7 <MDA COMPWE UNIT 3 TURBINE BLDG.

DISCHARGE CANAL DISCHARGE CANAL 'DISCHARGE CANrXL HUDSON RIVER

)hnWhite -'MONITORING WELL STATUS.doc Page_11 From: "Axelson, William L" <WAxelso@entergy.com>

To: "Croulet, Donald" <dcroule@entergy.com>, <JRW1 @nrc.gov>, "'James Noggle"'

<JDN@nrc.gov>, "'Timothy Rice"' <tbrice@gw.dec.state.ny.us>

Date: 1/23/06 9:52AM

Subject:

MONITORING WELL STATUS.doc

<<MONITORING WELL STATUS.doc>>

Here is the overall latest MW and storm drain data--are we still set for Feb 6 for split sampling on phase 1 wells?

,hn White -*TEXT.htm Pagqe 1 [1

<<MONITORING WELL STATUS.doc>>

Here is the overall latest MW and storm drain data--are we still set for Feb 6 for split sampling on phase 1 wells?

ihn'White - MONITORING WELL STATUS.doc Pagei~

MONITORING WELL STATUS (Jan 23, 2006-0600 hours)

Well Location Status N'ext Current Number Len Results (llighest Historical Value)

MW-111 Transformer Yard Baseline Sample PT Current result: 199,000 pCi/I (01/13/06) 302,000 pCi/L (11/04/05)

MW-30 U-2 SFB Not in Service Add permanent Packer Raw Water (no Packer) 399,000 pCi/L (11/23/05)

Adding casings to reach 80'el Highest Packer Water: 600,000 pCi/L (11/24/05)

Well Installed Raw water (no Packer) 4,060 pCi/L (12/30/05)

MW-31 MOB side walk Sampled 12/30/05 Packer Test Done Count Packer samples MW-32 U-2 SFB Alley Way Well installed Remove and repair Packer Raw Water (no Packer) 3,720 pCi/L (01/13/06)

Need to fix Packer assembly MW-33 Transformer Yard Well installed Sampled water (01113/06) 232,O00pCi/L 232,000 pCi/L (01/13/06)

MW-34 Transformer Yard Well installed Sampled water (01/13/06) 131,000 pCi/L 159,000 pCi/L) (01/06/06)

MW-35 Transformer Yard Well installed Sampled water (01/13/06) 97,800 pCi/L 97,800 pCi/I (01/13/06)

MW-36 U-2 Turbine Bldg About 15' down in hole Complete well installation Casing at about 10' in place MW-37 U-2 Turbine Bldg Drilled through concrete floor Finish MW-36, go to MW-37 Down to subsoil level (about 8"'

MW-38 South U-3 Boundary Well in service Continue periodic sampling SPLIT SAMPLE MW-38 RESULT:

NY State Result: 701 pCi/I (12/08/05)

Fitzpatrick Result: 985 pCi/I (12/08/05)

N.D. (12/30/05) 1008 pCi/l(01/10/06)

MW-40 Lot above Sewer Plant Pilot casing installed and cemented Drilling today NMI-39 Between Ul SFB & U3 RWST Prepare to vacuum evacuate I

hn White -'MONITORING WELL STATUS.doc - Page CURRENT WELL STATUS Phase I Wells Status MW-30 Completed (extending casing to 80' el)

MW-31 Completed MW-32 Completed MW-33 Completed MW-34 Completed MW-35 Completed MW-36 Electric drill on location to start drilling MW-37 Drilled 9" through concrete floor MW-38 Completed Phase II Wells Sequence (see note belowl Status MW-39

  • South of Unit I Fuel Storage Building (next to be vacuum evacuated MW-40
  • Parking Lot above Sewerage Plant (drilling starting now-01/20/06)

MWV48

  • Furthest Southerly Property Boundary (completed vacuum evacuation)

MW.42 West of Unit 2 RWST MW-46 West of Unit 3 PAB Sump MW-41" South of Unit Unit 3 RWST MW-43 South of Unit 3 Tank Pit and RWST MW-44 North of Unit 3 Fuel Storage Building MW-45 Between Unit 3 Fuel Storage Building and PAB MW-47 West of Unit I Fuel Storage Building MW-49 West side of Unit 3 Discharge Canal MW-50 East side of Unit 3 Discharge Canal MW-51 Southern property hill north of MW-40 MW-52 Northern property boundary

  • Note:

Wells numbering 39,40,48 are priority wells at this time and may be drilled in a changing sequence within this subset based on depth of well considerations, equipment setup options, and engineering paperwork delivery.

ihnWhite -!MONITORING WELL STATUS.doc Page 3:'I ihnWhite -'MONITORING WELL STATUS.doc Paoe 31 RECENT TREND INFORMATION:

(Activity in pCi/L)

MONITORING WELLS (in pCi/l)

DATE: 11124105 12/13-16 12/19/05 12/30/OS 01106106 01/13106 MW-30: 600,000 (ONLY SAMPLE TAKEN WITH TEMPORARY PACKER SYSTEM)

MW-31: 4061 4030 MW-32: STILL DRILLING STILL DRILLING 3720 MW-33: 142,000 199,000 220,000 189,000 232,000 MW-34: 63,900 121,000 147,000 159,000 131,000 MW-35: 42,300. 76,000 80,500 95,400 97,800 MW-ll: 296,000 192,000 212,000 113,000 199,000 MW-38: Most recent split sample results: 985 (Fitzpatrick 12/08/05)) 701 State of New York (12/08/05)

Most recent Fitzpatrick results: Not detected (Fitzpatrick 12130/05)

UNIT 2 STORM DRAINS (in pCi/n) (MOST RECENT RESULTS)

MH-1 (U2 river front) MDA (goes to river) MH-9 (U2 MOB) 2,140 MH-2 (U2 river front) MDA (goes to river) MH-10 (U2 MOB) 2,940 MH-3 (North of U2 Turbine) 3,450 MH-12 U2 Riverfront) MDA (goes to river)

MH-4 (U2 Transformer Yard) 3,070 MH-14 (U-2 River front MDA (goes to river)

MH-4A(U2 Transformer Yard) 3,380 MH-2AMDA (near U2 Diesel) MDA MH-5 (U2 Transformer Yard) 3,480 CB 4 (near U2 RWST) 1,010 MH-6 (U2 Transformer Yard) 13,000 CB-24 (near U2 Security C.P.) 822

)hn'White ! MONITORING WELL STATUS.doc .......Page Page 44 !1,

?I

~hnWhite ! MONITORINC~ WELL STATUS.doc

  • (

MH-7 (U2 transformer Yard) 8,140 MH-8 (U2 Transformer Yard) 5,740 Unit 3 Storm Drains Manholes counted Jan 12,2006 (pCiIl):

A2 (Near U3 RWST) <MDA A4 (Near U-3 RWST) < MDA B 1 (Unit 3 Transformer Yard) 4530 B3 (Unit 3 Transformer Yard) 6280 B4 (Unit 3 Transformer Yard) 3180 B5 (Entrance to 3 Transformer Yard) 5200 B7 (North side of U3 Turbine Bldg 2510 CI (South side of U3 Turbine Bldg) 997 D2 (South side Service Admin Bldg) <MDA Additional Storm Drains (Unit 2 and 3 combination) sampled Jan 13. 2006 (pCi/1)

CB- 12 (south side of cafeteria) 849 CB- 13 (south side of cafeteria) 856 MH-13 (waterfront area-near U2 Screen house) <MDA CB-14 (south side of cafeteria) 734 MH-15 (waterfront area-near U2 Screen house <MDA)

CB-15 (waterfront area-near U3 Discharge Canal) <MDA CB- 19 (waterfront-near U2 Screen House <MDA)

TREND COMPARISON Unit 3 Locations Sampled Jan 17, 2006 01117106 01112/06 B I U-3 Transformer Yard 5010 4530 B3 U-3 Transformer Yard 4650 6280 B4 U-3 Transformer Yard 3600 3180 B6 U-3 Transformer Yard <MDA B7 U-3 Transformer Yard 2690 2510 B8 U-3 Transformer Yard <MDA Cl U-3 North of Service Bldg 867 997 D2 U-3 South of Service Bldg <MDA <MDA E4 U-3 Access Road to Command Post < MDA E4A U-3 Access Road to Command Post <MDA E5 U-3 Access Road to U3 Command Post < MDA E5A U-3 Access Road to U3 Command Post < MDA E6 U-3 Access Road to U3 Command Post <MDA

)hnWhite -MONITORING WELL S I A I US.doc E7 U-3 Access Road to U3 Command Post < MDA